Entity File · The Public Record
Owner of record
Springside Chestnut Hill
13 permits · 1 violation
- Records on file
- 14
Permits (as owner)
13 entries
- Issued Jul 7, 2026
Addition and/or Alteration · Perform demolition of all existing electrical work in the locker rooms and bathrooms within the skate and hockey area. Install new electrical systems including wiring, lighting fixtures, lighting controls, exit signs, emergency lighting, and receptacle outlets. Furnish and install new fire alarm devices and replace existing devices as required, including all associated wiring. All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Jul 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued May 4, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Apr 24, 2026
Tank Install/Removal · FOR THE REMOVAL OF TWO (2) 5000-GALLON UNDERGROUND STORAGE TANKS IN ACCORDANCE WITH APPROVED PLANS AND PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION REGULATIONS. 06/08/26 AMENDMENT: FOR THE REMOVAL OF ONE (1) 5000-GAL UNDERGROUND STORAGE TANK AND FOR THE CLOSURE OF ONE (1) 5000-GAL UNDERGROUND STORAGE TANK TO BE FILLED WITH FLOWABLE FILL CONCRETE.
- Issued Mar 31, 2026
Alterations · ALTERATIONS TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Mar 31, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Mar 20, 2026
Alterations · ALTERATIONS TO LOCKER ROOMS OF COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Mar 5, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. RENOVATIONS TO LOCKER ROOMS AND RESTROOMS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, INSTALLATION OF NEW LIFT, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Jan 14, 2026
Addition and/or Alteration · Install a 600-amp main distribution panel (MDP) for the Performing Arts Center. Provide new subpanel locations, including one 225-amp subpanel serving receptacle circuits and one 225-amp subpanel serving lighting circuits. Install fire alarm system wiring and provide power for HVAC equipment at the designated locations. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Jan 5, 2026
New Construction · FOR INSTALLATION OF FOUR-INCH FIRE SERVICE LINE, FOUR-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.
- Issued Dec 11, 2025
1 units
Addition and/or Alteration · FOR PARTIAL DEMOLITION, LEVEL III ALTERATIONS AND ADDITION WITH NO CHANGE IN OCCUPANCY. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Sep 24, 2025
Addition and/or Alteration · Remove (506) Hanwha solar panels and replace with (418) new panels. No roof racking modifications or any building modifications, PV replacement scope on existing racking. Existing system installed under the 2008 NEC
- Issued Aug 11, 2025
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. IF TENT IS NOT READY FOR INSPECTION TO INCLUDE ELECTRICAL COMPONENTS, AN ADDITIONAL WILL BE APPLIED FOR ANY AFTER HOURS INSPECTION WITH POSSIBLE ISSUANCE OF CODE VIOLATION NOTICES.
Violations
1 entry
- Violation Jun 4, 2026OPEN
BENCHMARKING LATE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.