THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Owner of record

St. Cecelia R C Church

7 permits

Records on file
7

Permits (as owner)

7 entries

  1. Issued Dec 4, 2025

    535 Rhawn St

    Addition and/or Alteration · Replace 2 emergency fixtures, 13 fixtures,4 switches, 2 GFICs, 6 outlets--fishing

  2. Issued Sep 17, 2025

    535 Rhawn St

    Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-004080- FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  3. Issued Sep 17, 2025

    535 Rhawn St

    Addition and/or Alteration · Electrical Permit for combo CP-2025-004080- Install lighting and switches . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**

  4. Issued Sep 17, 2025

    535 Rhawn St

    Alterations · Plumbing Permit (Interior) for combo CP-2025-004080- New supply/sanitary piping within expanded bathroom area to connect to existing. New fixtures (13) throughout bathroom area. Existing floor drains and mop sink to be used. All new piping to be copper as specified on sheet P-4 of attached plan.

  5. Issued Sep 16, 2025

    1 units

    535 Rhawn St

    Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS FOR RENOVATIONS TO BATHROOMS IN AN EXISTING EDUCATIONAL FACILITY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  6. Issued Sep 16, 2025

    535 Rhawn St

    Sign · FOR THE ERECTION OF ONE (1) FREESTANDING DOUBLE FACED SIGN WITH BOTH DIGITAL ANIMATED ILLUMINATION AND INTERNAL STATIC ILLUMINATION.

  7. Issued Jul 30, 2025

    535 Rhawn St

    EZ Interior Non-Load-Bearing Wall Demo. · EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of fou

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.