Entity File · The Public Record
Contractor
Steven Birton
32 permits
- Records on file
- 32
Built (as contractor)
32 entries
- Issued Jun 1, 2026
Alterations · Replace waste and drain lines for 3rd floor hall bathroom, toilet, lav, shower, new hot and cold water supply, replace waste lines on 2nd floor hall bathroom, toilet, lav, bathtub, new hot and cold water supply, replace waste and drain lines on 1st floor hall bathroom, toilet, lav, new hot and cold supply line, replace kitchen sink drain and water supply line.
- Issued May 12, 2026
Alterations · Replace waste and drain lines in second floor rear bathroom, toilet, lav , shower, install new hot and cold supply lines, Replace waste and drain lines in second floor hall bathroom, toilet, lav, bathtub, new hot and cold water supply lines .
- Issued Apr 24, 2026
New Construction or Additions · ALTERATIONS TO CREATE A TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Mar 19, 2026
Alterations · Replace waste and drain lines in second floor hall bathroom, toilet, lav, bathtub, new hot and cold water supply lines, replace waste and drain lines in 1st floor hall bathroom toilet, lav, new hot and cold supply lines, replace kitchen sink drain and water supply lines. REPLACE 6 FIXTURES.
- Issued Feb 11, 2026
Alterations · Replace the first 4 feet of piping connected to each hot water heater with copper. (There are 2 hot water heaters) It is for pipe repair only, and no walls need to be opened to access them.
- Issued Dec 12, 2025
Alterations · Excavate footway replace 5x4 curb trap, fresh air inlet, tie back into existing main drain
- Issued Dec 4, 2025
Alterations · Excavate footway, Replace Curb Trap & Fresh Air Inlet, tie back in to existing 4 in main sewer line.
- Issued Nov 14, 2025
Alterations · INSTALL NEW FIXTURES WITH PIPING - WATER, WASTE AND VENT LINES FOR 3 TOILETS, 3 TUBS, 3 LAVATORIES, 1 WASHER/LAUNDRY AND 1 KITCHENS. INSTALL 1 HOT WATER HEATER. 12 FIXTURES
- Issued Nov 3, 2025
Alterations · Plumbing Permit (Interior) for combo RP-2025-008395
- Issued Oct 31, 2025
Alterations · REPAIR/Replace curb trap & fresh air vent box, connect to existing main drain pipe
- Issued Oct 20, 2025
Alterations · Excavate footway replace 5x4 curb trap, new fresh air inlet, tie into existing main sewer line
- Issued Oct 15, 2025
Alterations · INSTALL (2) WATER DISTRIBUTION PIPES. (1) 2" & (1) 1.5"
- Issued Oct 14, 2025
Alterations · Install supply and waste lines for 2 lavs, 2 kitchen sinks, 2 water closets, 2 water heaters, 2 showers. 10 total fixtures.
- Issued Sep 30, 2025
Alterations · INSTALL WATER AND DRAIN LINES FOR 6 TOILETS, 6 VANITIES, 6 TUBS AND 4 KITCHENS. INSTALL 4 HOT WATER HEATERS.
- Issued Sep 26, 2025
Alterations · INTERIOR ALTERATIONS TO EXISTING 6 DWELLING UNIT BUILDING., INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Sep 24, 2025
Alterations · install waste and drain lines 1st floor full bathroom ,toilet lav , shower stall , new hot and cold supply lines , replace kitchen sink drain line , new hot and cold supply lines ,2nd flooor install waste and drain lines in 2nd floor hall bathroom , new hot and cold water supply lines, replace kitchen sink , new hot and cold supply lines
- Issued Sep 16, 2025
Alterations · Install waste and drain lines in 3rd floor hall bathroom , toilet , lav , tub , new hot and cold supply , replace waste and drain lines in 2nd floor hall bathroom , toilet lav , shower , new hot and cold supply line
- Issued Sep 16, 2025
Alterations · Replace 3/4 water line from curb stop thru foundation wall
- Issued Sep 7, 2025
Alterations · Replace waste and drain lines in 2nd floor hall bathroom, toilet, lav , shower, new hot and cold supply lines, replace kitchen sink drain and water supply & new hot water tank in basement.
- Issued Sep 5, 2025
Alterations · replace bathroom fixtures in !st floor commercial space, toilet , lav , replace mop sink in basement
- Issued Aug 18, 2025
Alterations · Install waste and drain piping for restarurant on first floor per plans as follows , 2 water closets , 2 lavs 1 mop sink , 3 bay sink , 1 prep sink ,2 hand wash sinks,1 grease trap , 1 grinder sink , 1 hot water heater ************* Amendment moving fixture locations in prep area ********************************************************
- Issued Aug 15, 2025
Alterations · 1st floor replace wase and drain lines in bathroom on 1st floor , toilet, lav , tub, new hot and cold supply lines , 2nd floor replace waste and drain lines in hall bathroom , toilet , lav , shower , new hot and cold supply lines ,
- Issued Aug 13, 2025
Alterations · INSTALL (2) WATER DISTRIBUTION PIPES. (1) 2" & (1) 1.5"
- Issued Aug 13, 2025
Alterations · Replace waste lines in 2nd floor hall bathroom- toilet, lav, bathtub & new hot and cold supply lines. Replace waste lines in 1st floor hall bathroom- toilet, lav & new hot and cold supply lines.
- Issued Aug 12, 2025
Alterations · INSTALL NEW FIXTURES WITH SUPPLY AND DRAINS LINES FOR: 2 KITCHEN SINKS, 2 WATER HEATERS, 4 LAVATORIES, 4 WATER CLOSETS, 4 SHOWER/TUB 16 FIXTURES
- Issued Aug 12, 2025
Alterations · Plumbing Permit (Interior) for combo CP-2025-001093
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.