- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing boiler only, in like and kind, no new piping/ ductwork
- Issued May 19, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued May 15, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the old 90,000 btu gas furnace with a new 90,000 btu gas furnace of the same like and kind. NO NEW DUCTWORK IS PART OF THIS PERMIT, APPLIANCE REPLACEMENT LIKE IN KIND ONLY.
- Issued May 15, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing with the same type, Gas Boiler 80% AFUE, 100,000 BTU, NO NEW DUCTWORK IS PART OF THIS PERMIT, APPLIANCE REPLACEMENT LIKE IN KIND ONLY.
- Issued May 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork
- Issued May 8, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. (Note: rooftop installations will require plans unless it has already been included on any approved alteration plans. Replacing the old 96,000 btu gas boiler with a new 96,000 btu gas boiler of the same like and kind. No new ductwork will be installed he
- Issued May 7, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued May 5, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork.
- Issued May 4, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork.
- Issued Apr 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 112,000 btu gas-fired steam boiler with a new 112,000 btu gas-fired steam boiler. No ductwork will be installed at this location
- Issued Apr 16, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 96,000 btu gas boiler for a new 96,000 btu gas boiler of the same like and kind. No new ductwork is being installed at this location.
- Issued Apr 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued Apr 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 90,000 btu gas furnace with a new 90,000 btu gas furnace of the same like and kind. No new ductwork will be installed at this location.
- Issued Apr 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old gas condensing boiler with a new gas condensing boiler of the same like and kind. No ductwork will be installed at this location
- Issued Apr 10, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 90,000 btu gas furnace with a new 90,000 btu gas furnace. No ductwork will be installed at this location
- Issued Apr 9, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the existing furnace only, in like and kind, no new ductwork
- Issued Apr 7, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork will be installed at this location.
- Issued Apr 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 96,000 btu gas boiler with a new 96,000 btu gas boiler. no new ductwork will be installed at this location.
- Issued Apr 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 90,000 btu gas furnace with a new 90,000 btu gas furnace. No ductwork is being installed at this location.
- Issued Apr 2, 2026
Addition and/or Alterations · Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 btu gas boiler with a new 96,000 btu gas boiler. no ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK IS PART OF THIS PERMIT, APPLIANCE REPLACEMENT LIKE IN KIND ONLY
- Issued Apr 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 125,000 btu gas boiler with a new 125,000 btu gas boiler of the same like and kind. No ductwork will be installed at this location.. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rat
- Issued Mar 27, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the existing Aqua Therm Air Handler with a new Aqua Therm Air Handler of the same like and kind. No ductwork will be installed at this location.
- Issued Mar 18, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace existing furnace only, in like and kind, no new ductwork
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 btu gas boiler with a new 96,000 btu gas boiler of the same like and kind. No ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing boiler only, in like and kind, no new ductwork.
- Issued Mar 11, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. the existing boiler only, in like and kind, no new ductwork.
- Issued Mar 11, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing piping/ ductwork.
- Issued Mar 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. NO NEW DUCTWORK. Replace old 96,000 btu gas boiler with a new 96,000 btu gas boiler of the same like and kind.
- Issued Mar 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace old 96,000 btu gas boiler with a new 96,000 btu gas boiler of the same like and kind. NO NEW DUCTWORK.
- Issued Mar 5, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the old 110,000 btu gas furnace with a new 110,000 btu gas furnace of the same like and kind. NO NEW DUCTWORK.
- Issued Mar 5, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the old 60,000 btu gas condensing furnace with a new 60,000 btu gas condensing furnace of the same like and kind. NO NEW DUCTWORK.
- Issued Feb 25, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 btu gas furnace with a new 96,000 btu gas furnace of the same like and kind. No new ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-
- Issued Feb 25, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new ductwork
- Issued Feb 25, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued Feb 25, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new ductwork.
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 90,000 BTU gas furnace with a new 90,000 btu gas furnace of the same like and kind. No new ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 90,000 BTU gas furnace with a new 90,000 btu gas furnace of the same like and kind. No new ductwork will be installed at this location.. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 BTU gas boiler with a new 96,000 btu gas boiler of the same like and kind. No new ductwork will be installed at this location.. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-r
- Issued Feb 20, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 BTU gas boiler with a new 96,000 btu gas boiler of the same like and kind. No new ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-ra
- Issued Feb 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 96,000 btu gas boiler with a new 96,000 btu gas boiler of the same like and kind. No ductwork will be installed at this location.
- Issued Jan 28, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing furnace only, in like and kind, no new ductwork.
- Issued Jan 28, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Jan 28, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Jan 28, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing furnace only, in like and kind, no ductwork
- Issued Jan 28, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Jan 23, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 23, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ ductwork
- Issued Jan 22, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, no new piping/ ductwork
- Issued Jan 22, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 btu gas boiler with a new 96,000 btu gas boiler the same like and kind. No ductwork will be installed. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW D
- Issued Jan 21, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans Replace the old gas furnace with a new gas condensing furnace the same like and kind. No ductwork will be installed at this location.
- Issued Jan 14, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 BTU gas boiler with a new 96,000 BTU gas boiler in the same like and kind. Ductwork is Not being installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rate
- Issued Jan 13, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 90,000 btu gas furnace with a new 90,000 btu gas furnace in the same like and kind. No ductwork will be installed at this location.
- Issued Jan 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing existing boiler only, in like and kind, no new ductwork will be installed.
- Issued Jan 6, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing existing boiler only, in like and kind, no new ductwork will be installed.
- Issued Jan 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old gas condensing boiler with a new gas condensing boiler of the same like and kind. No ductwork is being installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated
- Issued Jan 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 BTU gas boiler with a new 96,000 BTU gas boiler the same like and kind. No new ductwork will be installed. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO N
- Issued Jan 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old oil boiler with a new 96,000 BTU gas boiler. No ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed
- Issued Jan 2, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacing the old 96,000 BTU gas boiler with a new 96,000 BTU gas boiler of the same like and kind. No ductwork will be installed at this location. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace the old gas condensing boiler with a new gas condensing boiler in the same like and kind. No ductwork will be installed. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW
- Issued Dec 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replace the old 96,000 BTU gas boiler with a new 96,000 BTU gas boiler in the same like and kind. No ductwork will be installed. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW
- Issued Dec 26, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork
- Issued Dec 18, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, no new ductwork.
- Issued Dec 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas boiler, in like and kind, no new ductwork.
- Issued Dec 16, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas boiler only, in like and kind, using existing ductwork
- Issued Dec 11, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Dec 11, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing existing boiler only, in like and kind, using existing ductwork.
- Issued Dec 5, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing gas furnace only, in like and kind, using existing ductwork.
- Issued Dec 5, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing existing furnace only, in like and kind, using existing ductwork.
- Issued Dec 4, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like and kind, using existing ductwork
- Issued Dec 1, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing piping/ductwork
- Issued Nov 19, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Replacement installation of an existing unit of same like and kind. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areas
- Issued Nov 18, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like & kind, using existing ductwork.
- Issued Nov 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like and kind, using existing ductwork. No new ductwork will be installed.
- Issued Nov 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the old oil furnace with a new oil furnace in the same like and kind as the old furnace. No ductwork will be installed at this location.
- Issued Nov 14, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the old 96,000 BTU gas boiler with a new 96,000 BTU gas boiler in the same like and kind as the old boiler. No ductwork will be installed at this location.
- Issued Nov 6, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing boiler only, in like and kind, no new ductwork/piping
- Issued Oct 30, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas furnace only, in like and kind, no new ductwork.
- Issued Oct 29, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace only, in like and kind, no new ductwork.
- Issued Oct 24, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas boiler with a new 96,000 BTU gas boiler only, in like and kind, no new ductwork.
- Issued Oct 21, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing 96K BTU gas boiler only, in like & kind, with a new 96K BTU gas boiler. No new ductwork/ piping.
- Issued Oct 16, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing boiler only, in like & kind. No ductwork will be installed.
- Issued Oct 7, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas boiler only, in like and kind, with a new 96,000 BTU gas boiler. No new ductwork will be installed.
- Issued Oct 3, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace only, in like & kind. No new ductwork.
- Issued Sep 29, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing furnace & AC only, in like & kind. No new ductwork will be installed at this location.
- Issued Sep 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the existing gas boiler only, in like & kind, with a new 80% 96,000 BTU gas boiler. No new ductwork will be installed at this location.
- Issued Sep 17, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas boiler only, in like & kind, with a new 96K BTU 80% gas boiler. No new ductwork will be installed or repaired.
- Issued Sep 2, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing gas furnace only, in like and kind, with a new 96,000 BTU gas furnace. No new ductwork will be installed.
- Issued Sep 2, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replacing the old 70,000 BTU gas boiler with a new 70,000 BTU gas boiler, in like and kind. No new ductwork will be installed.
- Issued Jul 24, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing oil boiler only, in like & kind. No new ductwork.
- Issued Jul 16, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace the existing gas boiler only, in like and kind, with a new 96,000 BTU Gas Boiler. No new ductwork will be installed.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.