Entity File · The Public Record
Company / LLC
Summer Corner LLC
1 property · $3.5M acquired · 6 permits · 2 violations
- Records on file
- 9
- Acquired
- $3.5M
Acquired
1 entry
Permits (as owner)
6 entries
- Issued Oct 23, 2026
New Construction or Additions · NEW CONSTRUCTION OF APARTMENT BUILDING. EXTERIOR INSTALLATION OF CURB TRAP, FAI, MAIN DRAIN, AND 4" WATER DISTRIBUTION PIPE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2021 PPC AND APPROVED PLANS
- Issued Oct 15, 2026
New Construction · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 9, 2026
New Construction · Complete electrical work for a new 63-unit multifamily residential building, including new utility service 1800A, distribution, lighting, power, fire alarm, and equipment and appliances connections per approved plans. NEC 2017 NFPA2016
- Issued Oct 7, 2026
63 units
New Construction · NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH BASEMENT, COMMON ROOF DECK AND PILOT HOUSES FOR USE AS SIXTY-THREE (63) DWELLING UNITS (UTILIZING MIHB & GREEN ROOF BONUS) AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR EXCAVATION, MEP & FIRE SUPPRESSION WORK**
- Issued Apr 2, 2026
New construction, addition, GFA change · For the erection of an attached structure (not to exceed 45 ft. in height (7 ft. earned from Mixed Income Housing bonus)), that includes a common roof deck with two pilot houses, an elevator overrun, and a Green Roof, recessed Balconies at the 2nd-4th floor levels, bicycle parking (21 spaces) along an accessible route, and site landscaping. Size and location per plan
Violations
2 entries
- Violation Sep 1, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Sep 1, 2026OPEN
RUBBISH & GARBAGE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 3, 2026.