- Issued May 25, 2026
New construction, addition, GFA change · New construction of a three story structure with roof deck and roof access structure as per approved plan, roof elevation NTE 38' in height
- Issued May 20, 2026
3 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING CONTAINING THREE (3) DWELLING UNITS. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN NINE (9) FEET OF THE BUILDING FACADE IN ACCORDANCE WI
- Issued May 20, 2026
3 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING CONTAINING THREE (3) DWELLING UNITS. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN NINE (9) FEET OF THE BUILDING FACADE IN ACCORDANCE WI
- Issued May 20, 2026
1 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE TO INCLUDE CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS COMMERCIAL SPACE AT CELLAR AND GROUND FLOOR SPACE WITH SINGLE-FAMILY HOUSEHOLD LIVING ABOVE. AS PER APPROVED PLANS. ****************************SEPARATE PERMITS FOR ANY OTHER WORK. *****************************************
- Issued May 20, 2026
3 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING CONTAINING THREE (3) DWELLING UNITS. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN NINE (9) FEET OF THE BUILDING FACADE IN ACCORDANCE WI
- Issued Apr 30, 2026
4 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS FOUR (4) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC***NO EXCAVATION GREATER THAN 5FT.*
- Issued Apr 25, 2026
3 units
New Construction · FOR THE NEW CONSTRUCTION OF AN ATTACHED THREE (3) STORY BUILDING WITH A BASEMENT, REAR DECK AT SECOND FLOOR, ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE THIRD FLOOR FOR THE USE OF R2 OCCUPANCY- 3 DWELLING UNITS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.
- Issued Apr 25, 2026
3 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR, 2ND FLOOR REAR DECK AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS MULTI-FAMILY (3 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************************SEPARATE PERMITS FOR ANY OTHER WORK. ******************************
- Issued Apr 2, 2026
2 units
New Construction · FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE. FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. ****************SEPARATE PERMITS FOR ELECTRICAL, PLUMBING AND FIRE-SUPPRESSION. *******************************
- Issued Apr 2, 2026
2 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY ATTACHED BUILDING WITH BASEMENT. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13D. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued Apr 2, 2026
2 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE. FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. ****************SEPARATE PERMITS FOR ELECTRICAL, PLUMBING AND FIRE-SUPPRESSION. *******************************
- Issued Feb 26, 2026
2 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA 13D. **EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING REVIEW INCLUDED **SEPARATE PERMITS REQUIRED FOR ALL FIRE SUPPRESSION SYSTEMS INSTALLATION.**. *PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**EN
- Issued Feb 17, 2026
1 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE. FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. *******************************SEPARATE PERMITS FOR PLUMBING, ELECTRICAL, OR FIRE-SUPPRESSION WORK. **************************
- Issued Feb 15, 2026
1 units
New Construction · FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY ROOF DECK ACCESS STRUCTURE. FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. *******************************SEPARATE PERMITS FOR PLUMBING, ELECTRICAL, OR FIRE-SUPPRESSION WORK. **************************
- Issued Feb 12, 2026
16 units
New Construction · FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY TWO (2) ROOF DECK ACCESS STRUCTURES. FOR USE AS MULTI-FAMILY (16 UNIT) HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRICAL, MECHANICAL AND FIRE-SUPPRESSION. ******************** 05/29/26 AMENDMENT: Amend permit for the removal of PECO vault & associated fire rated assemblies to include the removal of structural steel special inspections. For the partial
- Issued Feb 3, 2026
Addition and/or Alteration · - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; IN
- Issued Feb 3, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo RP-2026-000863
- Issued Jan 13, 2026
3 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR AND PRIVATE ROOF DECK WITH PILOT HOUSE FOR USE AS THREE (3) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jan 13, 2026
3 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT, ROOF DECK, AND ROOF DECK ACCESS STRUCTURE. FOR USE AS THREE (3) DWELLING UNITS (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK.
- Issued Jan 2, 2026
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH BASEMENT FOR USE AS A THREE (3) FAMILY DWELLING (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK.
- Issued Nov 11, 2025
3 units
New Construction · FOR THE ERECITON OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE AND BALCONIES AT THE REAR. FOR USE AS THREE DWELLING UNTIS. BUILDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK .Streets Department required for sidewalk closure/pedestrian protection.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.