Ten Penn Center Associate
9 permits · 4 violations
- Records on file
- 13
Permits (as owner)
9 entries
- Issued Apr 28, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 2500 sprinkler heads on floors 17-27 to ensure the safety of building, per NFPA 13
- Issued Apr 27, 2026
Addition and/or Alteration · Install code compliant fire alarm system for R-2 conversion in fls 17-27. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC 2016 NFPA 72.
- Issued Apr 24, 2026
Alterations · Complete sanitary, waste and vent system; complete domestic water system; installation of plumbing fixtures- quantity 275. Variance granted by PAB on Apr 9, 2026 with the following comments and proviso (Variance recommended as to branch vent sizes ONLY. Request for non-metallic material variance in building higher than 150ft is DENIED.) Proviso: The individual fixtures connected to the horizontal branch, marked TSP, shall be removed.
- Issued Mar 3, 2026
Addition and/or Alteration · Provide temporary power and lighting. Furnish and install a complete Electrical Distribution System including all gear, panels, transformers, metering, as per Bala single-line diagram. Furnish and install lighting, lighting controls, emergency and egress lighting, branch circuit wiring and MEP equipment feeds and connections. Install all receptacles, switching, kitchen, and MEP branch wiring in apartment units. Install smoke/CO alarms and telecommunications wiring as per 2017 NEC. ***FIRE A
- Issued Mar 2, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jan 28, 2026
Rough-In · Rough-In Permit for EP-2026-000506 Complete electrical renovations on floors 17 thru 27 for 274 residential units and common spaces per plans and NEC 2017. Reference building permit CP-2025-006508
- Issued Jan 28, 2026
1 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY AT 17TH-27TH FLOORS TO R-2 OCCUPANCY AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
Violations
4 entries
- Violation May 1, 2026OPEN
LICENSES
- Violation May 1, 2026OPEN
RECORDS
- Violation May 1, 2026OPEN
DAMPER CERTIFICATION REPORT
- Violation May 1, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.