30 permits
- Records on file
- 30
Built (as contractor)
30 entries
- Issued Jun 10, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Replace existing air handler and heat pump only, in like and kind, no new ductwork.
- Issued Jun 2, 2026
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Installation of 2 ton air handler with 2 ton heat pump. Running all new ductwork as 2 zone. Providing a Honeywell thermostat. Outdoor unit will be located at the back.
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011743
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011747
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011749
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011740
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011753
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011739
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011752
- Issued Jun 1, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2023-011745
- Issued May 29, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Installation of 92% 40 tutu gas furnace with 2 ton coil and 2 ton AC. Run all new ductwork.
- Issued May 15, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 80K BTU gas furnace, 3 ton AC, ductwork, and 12 diffusers
- Issued May 14, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Installation of high efficiency 96% 80,000 btu gas furnace with 3 ton coil and 3 ton AC. Run all new ductwork. Furnace is located in basement. Condenser is located on the outside of the house.
- Issued Feb 27, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required. Installation of two electric systems with all new ductwork. Installation of 2 ton air handler with 2 ton heat pump for the first floor and basement apartment. System is located in the basement. Installation of 2 ton ai
- Issued Jan 20, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-009442
- Issued Dec 22, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 3.5 ton air handler, 3.5 ton heat pump, 10 kW backup heat, all new ductwork, and 6 diffusers
- Issued Dec 10, 2025
New Construction · FOR THE INSTALLATION OF MIN-SPLIT SYSTEMS. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Dec 5, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-005415
- Issued Dec 4, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Installation of (2) central air systems, new ductwork, and 16 diffusers. System 1 will be located in the basement and servicing the basement, 1st, and 2nd floors. 92% 60k btu gas furnace with 2.5 ton AC. System 2 will be located on the 3rd floor and serv
- Issued Dec 3, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install (2) HVAC systems, (1) for each dwelling unit, ductwork, and 12 total diffusers. Each dwelling will have a 92% 60K BTU furnace and 2 ton AC.
- Issued Nov 5, 2025
New Construction · FOR INSTALLATION OF THE HVAC SYSTEM AS PER APPROVED PLANS.
- Issued Oct 31, 2025
New Construction · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU gas furnace, 2.5 ton AC., all new ductwork, and 12 diffusers.
- Issued Oct 30, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 29, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 60K BTU furnace, 2.5 ton AC, ductwork, and 6 diffusers
- Issued Oct 21, 2025
New Construction · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, BATHROOM AND CLOTHES DRYER EXHAUSTS, AND ASSOCIATED DUCTWORK THROUGHOUT A THREE (3) FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-000887 FOR ASSOCIATED BUILDING PERMIT.
- Issued Oct 7, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Oct 3, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 2.5 ton air handler, 2.5 ton heat pump, 10 kW backup heat, all new ductwork, and 6 diffusers.
- Issued Aug 20, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 25, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 92% 100K BTU furnace, 4 ton AC, new ductwork, and 6 diffusers.
- Issued Jul 11, 2025
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Install 80% 80k BTU furnace, 2.5 ton AC, ductwork, & 6 diffusers.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.