THE INDEX: 132 ▼16 · week of Oct 5 — permits steady, openings running hot, deal ledger running hot

The Philadelphia Index

Entity File · The Public Record

Owner of record

Thomas Jefferson Universi

27 permits · 14 violations

Records on file
41

Permits (as owner)

27 entries

  1. Issued Sep 18, 2026

    2301 S Broad St

    Addition and/or Alteration · Install Lighting, Fire Alarm, receptacles, branch wiring -2nd fl CT SCANNING . 2020 NEC.

  2. Issued Sep 15, 2026

    917-33 Chestnut St

    EZ Interior Non-Load-Bearing Wall Demo. · **Existing Philadelphia Historic Property** For the interior demolition of non-bearing partition walls and ceiling in accordance with the attached EZ Permit Interior Demolition Standard. Failure to comply with the attached EZ Permit Interior Demolition Standard shall result in revocation of this permit. No exterior work permitted as part of this permit as per PHC approval. Asbestos removal is required prior to start of work.

  3. Issued Sep 10, 2026

    2301 S Broad St

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (29) sprinkler heads to accommodate interior alterations

  4. Issued Sep 3, 2026

    1000-32 Chestnut St

    Addition and/or Alteration · Electrical wiring of the sanitation area all work per approved plans

  5. Issued Aug 24, 2026

    2301 S Broad St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  6. Issued Aug 18, 2026

    2301 S Broad St

    Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing

  7. Issued Aug 10, 2026

    1 units

    2301 S Broad St

    Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY )TO A PORTION OF AN EXISTING HOSPITAL. **ALL WORK TO BE DONE PER APPROVED PLANS AND DOH APPROVAL.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**

  8. Issued Aug 9, 2026

    1 units

    1000-32 Chestnut St

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS FOR DEMOLITION PHASE OF PROJECT AT SIXTH-FLOOR OF TJU GIBBON BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.

  9. Issued Jul 21, 2026

    917-33 Chestnut St

    Shelter/Platform · SHELTER PLATFORM PERMIT- Erection of sidewalk shelter platform XX l.f. with the deck at 300 P.S.I. each as per Engineered Plans. Streets Department permit is required for sidewalk closure prior to the start work.

  10. Issued May 15, 2026

    1000-32 Chestnut St

    Alterations · ALTERATIONS TO MEDICAL BUILDING. REPLACEMENT/INSTALLATION OF NEW SPD UNITS AND INSTALLATION/REPLACEMENT OF FLOOR SINKS FOR DISPOSAL OF WASTE FROM UNITS. CONNECTION OF SPD UNITS TO RO SYSTEM AND COMMPRESSED AIR SYSTEM. NEW RO SYSTEM SUPPLIED BY OWNER TO BE INSTALLED WITH REQUIRED BACKFLOW PREVENTERS. ALL WORK TO BE PERFORMED UNDER STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.

  11. Issued May 7, 2026

    1000-32 Chestnut St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  12. Issued Apr 21, 2026

    2301 S Broad St

    Addition and/or Alteration · Provide power wiring for duct heaters and rooftop unit(s). Work includes installation of feeders and/or branch circuits, disconnecting means, conduit, conductors, supports, terminations, and grounding/bonding as required. Coordinate electrical connections with mechanical equipment requirements, including proper overcurrent protection and equipment ratings. All work shall be performed in accordance with the 2017 NEC and per approved plans.

  13. Issued Apr 21, 2026

    1 units

    1000-32 Chestnut St

    Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR PARTIAL DEMOLITION AND ALTERATIONS TO 2ND FLOOR IN AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* ********SEPARATE MECHANICAL PERMIT REQUIRED FOR THE INSTALLATION OF APPLIANCES AND DUCTWORK. *****************

  14. Issued Apr 14, 2026

    1000-32 Chestnut St

    Addition and/or Alteration · Install two (2) 20-amp branch circuits to provide power to rooftop exhaust fans and one (1) 30-amp branch circuit to provide power to a rooftop damper. Work includes all required wiring, conduit, supports, disconnecting means, terminations, grounding, and overcurrent protection. All work shall be performed in accordance with the 2017 NEC and per approved plans.

  15. Issued Mar 27, 2026

    1 units

    2301 S Broad St

    Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE WORK RELATED TO NEW MEP SYSTEMS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  16. Issued Mar 23, 2026

    1000-32 Chestnut St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND EXHUST FANS WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  17. Issued Mar 10, 2026

    1 units

    1000-32 Chestnut St

    Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO 7TH, 8TH AND ROOF IN AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* ********SEPARATE MECHANICAL PERMIT REQUIRED FOR THE INSTALLATION OF APPLIANCES AND DUCTWORK. *****************

  18. Issued Feb 27, 2026

    912-28 Walnut St

    Addition and/or Alteration · Exterior wiring for a sign with a disconnect and wiring from existing power Parent permit GP-2025-010306

  19. Issued Feb 18, 2026

    912-28 Walnut St

    Addition and/or Alteration · Furnish and install fire alarm system devices to be added to the existing building system .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 IEBC.

  20. Issued Feb 18, 2026

    900-10 Walnut St

    Alterations · IR Lab Renovations, Lower Level. Install domestic cold water supply piping lower level. Install 1 floor drain lower level. Installing 1" Watts LF 007-M1-QT-FZ Backflow Preventer.

  21. Issued Dec 23, 2025

    900-10 Walnut St

    Addition and/or Alteration · Install 34 Receptacles - 125 Amp Shunt Trip C B and Enclosure - 150-amp 4 Pole Transfer Switch - Panel EMDP-B & DPP-3 - 2 Mechanical Units .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.

  22. Issued Dec 11, 2025

    900-10 Walnut St

    Addition and/or Alterations · FOR THE RELOCATION OF SPRINKLER HEADS TO ACCOMMODATE THE BASEMENT LEVEL OF AN EXISTING STRUCTURE. **ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.**

  23. Issued Nov 17, 2025

    912-28 Walnut St

    Sign · FOR THE ERECTION OF ONE (1) STATIC ILLUMINATED WALL SIGN ON AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK, INCLUDING ALL ELECTRICAL WORK.

  24. Issued Oct 2, 2025

    900-10 Walnut St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  25. Issued Aug 28, 2025

    1 units

    900-10 Walnut St

    Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS AND DOH APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  26. Issued Aug 25, 2025

    912-28 Walnut St

    Addition and/or Alteration · Furnish and install new panels, lighting, devices, connections to kitchen equipment, and install tele/data cabling as per 2017 NEC.

  27. Issued Aug 19, 2025

    1000-32 Chestnut St

    Addition and/or Alteration · Replacement of (3) existing 1megawatt Generators . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.

Violations

14 entries

  1. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    EXIT SIGN ILLUMINATION

  2. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    FDC INSPECTION, TESTING & MAINTENANCE

  3. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

  4. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    STAIRWAY ROOF ACCESS

  5. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    UTILITY IDENTIFICATION

  6. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    SELF- OR AUTOMATIC-CLOSING DOORS

  7. Violation Sep 14, 2026OPEN

    919-21 Walnut St

    MEANS OF EGRESS CONTINUITY

  8. Violation May 14, 2026OPEN

    2301 S Broad St

    FIRE EXTINGUISHERS

  9. Violation May 14, 2026OPEN

    2301 S Broad St

    INSPECTION, TESTING & MAINTENANCE

  10. Violation May 14, 2026OPEN

    2301 S Broad St

    PERIODIC TESTING

  11. Violation May 14, 2026OPEN

    2301 S Broad St

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

  12. Violation Oct 14, 2025OPEN

    1000-32 Chestnut St

    COMMERCIAL SYSTEM TEST

  13. Violation Oct 14, 2025OPEN

    1000-32 Chestnut St

    DAMPER CERTIFICATION REPORT

  14. Violation Mar 3, 2025OPEN

    2301 S Broad St

    DAMPER CERTIFICATION REPORT

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated October 21, 2026.