Entity File · The Public Record
Contractor
Thomas Uhl
622 permits
- Records on file
- 622
Built (as contractor)
622 entries
- Issued Aug 19, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Aug 17, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Aug 14, 2026
New Construction or Additions · - Exterior Storm and Sanitary Plumbing for New Construction in accordance with EZ Permit Standard for Plumbing. - Exterior 2" Water Distribution for New Construction in accordance with EZ Permit Standard for Plumbing.
- Issued Aug 14, 2026
New Construction or Additions · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Aug 14, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Aug 13, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Aug 13, 2026
New Construction or Additions · Exterior 2" Water Distribution, Storm and Sanitary Plumbing for Residential New Construction in accordance with EZ Permit Standard for Plumbing.
- Issued Aug 12, 2026
New Construction or Additions · - Exterior Storm and Sanitary Plumbing & Water Distribution for New Construction in accordance with EZ Permit Standard for Plumbing. INSTALL CT, FAI, MD & 1.5" WDP
- Issued Aug 11, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Aug 11, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Aug 11, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Aug 6, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Aug 6, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing Relacing 5" Curb Trap, 4" Main Drain, 4" Fresh Air Inlet
- Issued Aug 6, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing Installing 11 Fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2 Shower/tubs
- Issued Aug 6, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Aug 5, 2026
New Construction or Additions · - Approved plumbing repair work per EZ Permit Standard for Plumbing. INSTALL CTs, FAIs, MDs & 1.5" WDP.
- Issued Aug 4, 2026
Alterations · INSTALL 21 FIXTURES, 4-TOILETS, 4-LAV, 4-SHOWER, 3-KS, 2-WASHER, 3-WATER HEATER, 1-SUMP PUMP
- Issued Aug 3, 2026
EZ Bathroom & Kitchen Remodel · - All approved work performed in accordance with Residential - EZ Bathroom & Kitchen Remodel.
- Issued Aug 3, 2026
Alterations · ALTERATIONS AND CHANGE OF OCCUPANCY TO TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jul 30, 2026
New Construction or Additions · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing.
- Issued Jul 30, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Jul 29, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 29, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-009469
- Issued Jul 29, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-009469
- Issued Jul 29, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-009469
- Issued Jul 24, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-009449
- Issued Jul 24, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-009449
- Issued Jul 24, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-009449
- Issued Jul 23, 2026
New Construction or Additions · Installing 1" Water Service, 5" Curb Trap, 5" Main Drain, 4" Fresh Air Inlet Installing 24 Fixtures 3 HWH 5 Lavs 5 Toilets 3 KS 3 Washers 5 Shower/tubs
- Issued Jul 23, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Jul 22, 2026
New Construction or Additions · Installing 1" Water Service, 5" Water Service, 5" Main drain, 4" Fresh Air Inlet Installing 24 Fixtures 3 HWH 5 Lavs 5 Toilets 3 KS 3 Washers 5 Shower/tubs
- Issued Jul 22, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Jul 20, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 17, 2026
New Construction or Additions · Installing 39 Fixtures 8 HWH 9 Lavs 9 Toilets 6 KS 6 Shower/tubs 1 washer
- Issued Jul 16, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-000467
- Issued Jul 16, 2026
New Construction or Additions · Installing 1 1/2" Water Service, 5" Curb Trap, 4" Main drain, 4" Fresh air inlet
- Issued Jul 16, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Jul 16, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-000467
- Issued Jul 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-004085
- Issued Jul 16, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Jul 16, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-000467
- Issued Jul 15, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-005874
- Issued Jul 15, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-000464
- Issued Jul 15, 2026
EZ Bathroom & Kitchen Remodel · - All approved work performed in accordance with Residential - EZ Bathroom & Kitchen Remodel
- Issued Jul 15, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-005874
- Issued Jul 15, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-000464
- Issued Jul 15, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-005874
- Issued Jul 15, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 15, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-000464
- Issued Jul 15, 2026
New Construction or Additions · Exterior Water Distribution and Exterior Building Drainage for New Construction in accordance with Permit Standard for Plumbing
- Issued Jul 15, 2026
Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Jul 9, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-000458
- Issued Jul 9, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-000458
- Issued Jul 9, 2026
New Construction or Additions · NEW CONSTRUCTION OF MIXED USE BUILDING. EXTERIOR INSTALLATION OF CURB TRAP, FAI, MAIN DRAIN, AND WATER DISTRIBUTION PIPE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION FOR PIPING SERVING FIXTURES LOCATED IN COMMERCIAL SPACE. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jul 9, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-000455
- Issued Jul 9, 2026
Alterations · - Approved plumbing repair work per EZ Permit Standard for Plumbing.
- Issued Jul 9, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-000455
- Issued Jul 9, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-000458
- Issued Jul 9, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-000455
- Issued Jul 7, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Jul 7, 2026
Alterations · - Approved plumbing repair work per attached EZ Permit Standard for Plumbing
- Issued Jul 7, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per attached EZ Permit Standard for Plumbing
- Issued Jul 6, 2026
New Construction or Additions · NEW CONSTRUCTION OF 16 UNIT 4 STORY APARTMENT BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jul 2, 2026
Alterations · Installing 8 Fixtures 2 Lavs 2 Toilets 2 Washers 2 Shower/tubs
- Issued Jul 2, 2026
Alterations · Installing 13 Fixtures 2 Lavs 4 Toilets 2 KS 1 Washers 4 Shower/tubs
- Issued Jul 1, 2026
Alterations · Amend Permit 7/7/2026 to remove water heater only selection and add fixtures 2 Lavs 2 Toilets 2 Shower/tubs 2 Washers ONLY
- Issued Jun 30, 2026
New Construction or Additions · Installing 1" Water Service, 5" Curb Trap, 5" Main Drain, 4" Fresh Air inlet Installing 24 Fixtures 3 HWH 5 Lavs 5 Toilets 3 KS 3 Washers 5 Shower/tub
- Issued Jun 29, 2026
Alterations · Installing 4 fixtures 1 KS 1 Lav 1 Toilet 1 Shower/tub
- Issued Jun 29, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-013428
- Issued Jun 29, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-013428
- Issued Jun 26, 2026
Alterations · ALTERATIONS TO MIXED USE BUILDING.. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Jun 25, 2026
New Construction or Additions · Install 18 fixtures, 1-KS, 1-WASHER, 5-TOILET, 5-LAV, 4-SHOWER/TUB, 1-WATER HEATER, 1-LAUNDRY SINK
- Issued Jun 25, 2026
Alterations · New interior plumbing for 3 lavs, 3 w/c, 3 tubs, 1 kitchen & 1 laundry.
- Issued Jun 24, 2026
Alterations · Installing 11 fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2 shower/tubs
- Issued Jun 24, 2026
Alterations · Installing 8 Fixtures 1 HWH 2 Lavs 2 Toilets 1 KS 1 Washer 1 Shower/tub
- Issued Jun 23, 2026
Alterations · Installing 11 Fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2 Shower/tubs
- Issued Jun 10, 2026
New Construction or Additions · Installing 4 showers, 4 sinks, 1 Kitchen sink,1 half bath sink, 5 toilets, 1 ejector pump, and gas water heater.
- Issued Jun 10, 2026
Alterations · Installing 12 Fixtures 2 HWH 2 Lavs 2 Toilets 2 KS 2 Washer 2 Shower/tubs
- Issued Jun 9, 2026
Alterations · Installing 11 Fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2 Shower/Tubs
- Issued Jun 8, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2024-006884
- Issued Jun 5, 2026
New Construction or Additions · Installing 1" Water Service, 5" Main Drain, 5" Curb Trap, 4" Fresh Air Inlet Installing 24 Fixtures 3 HWH 5 Lavs 5 Toiets 3 KS 3 Washers 5 Shower/tubs
- Issued Jun 4, 2026
Alterations · Installing 11 Fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2 Shower/tubs
- Issued Jun 4, 2026
Alterations · Installing 11 Fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2 Shower/tubs
- Issued Jun 3, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-011810
- Issued Jun 3, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-011810
- Issued Jun 3, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-011810
- Issued Jun 1, 2026
New Construction or Additions · Installing 1" Water Service, 5" Curb Trap, 4" Main Drain, 4" fresh air inlet
- Issued May 31, 2026
Alterations · Installing 11 Fixtures 1 HWH 3 Lavs 3 Toilets 1 KS 1 Washer 2Shower/tubs
- Issued May 29, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-001398
- Issued May 29, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-001345
- Issued May 29, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-001398
- Issued May 29, 2026
New Construction or Additions · NEW CONSTRUCTION OF QUADPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued May 29, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2026-001398
- Issued May 29, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2026-001345
- Issued May 29, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2026-001345
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 18, 2026.