1 sold · 18 permits · 5 violations
- Records on file
- 24
Sold
1 entry
- Recorded Jul 11, 2024
$28M
to THREE PARKWAY LOWER UNIT ASSOCIATES LLC;THREE PARKWAY UPPER UNIT ASSOCIATES LLC
Permits (as owner)
18 entries
- Issued Jun 17, 2026
Addition and/or Alteration · Install new panel, lighting, receptacles, switches, occupancy sensors, floor boxes, and provide power to equipment as per 2017 NEC.
- Issued Jun 17, 2026
Addition and/or Alteration · Furnish & install (26) Category 6 cables from the Server Room. Furnish & install (1) 48-port, Category 6 patch panel for termination of cabling within the Server Room Furnish & install requisite Category 6 jacks, plates, boxes, etc.
- Issued Jun 9, 2026
Alterations · Relocate kitchen sink, water and drain line. ALL WORK PERFOMRED PER 2018 PPC AND EZ PLUMBING STANDARD.
- Issued Apr 17, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF 1ST FLOOR OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK.**
- Issued Mar 3, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 795 sprinkler heads on floors 10, 11, & 12 to ensure the safety of the building, per NFPA 13
- Issued Mar 2, 2026
Alterations · DIRECT FIXTURE REPLACEMENT AND INSTALLLATION OF NEW FIXTURES WITH PIPING FOR ALTERATION TO EXISTING OFFICES REFER TO APPROVED PLANS DOR DETERMINATION ON NEW AND DIRECT REPLACEMENT OF FIXTURES.. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Feb 26, 2026
Addition and/or Alteration · Install fire alarm for/Floors 10,11, & 12. ALL WORK MIS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,`18 IEBC.
- Issued Feb 13, 2026
Addition and/or Alterations · FOR A MECHANICAL WORK TO ACCOMMODATE THE 10TH, 11TH AND 12TH FLOOR OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Jan 30, 2026
Rough-In · ROUGH IN OF ABOVE GROUND PIPING FOR 25 FIXTURES.
- Issued Jan 29, 2026
Addition and/or Alteration · Install interior electrical wiring for the office spaces on the 10th, 11th, and 12th floors, including lighting, switches, lighting controls, exit signs, emergency lighting, receptacle outlets, and systems furniture workstations. Provide all required wiring and power connections for the variable air volume (VAV) components of the HVAC system. All work to be done according to the 2017 NEC and per approved plans.
- Issued Jan 27, 2026
3 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO A PORTION OF THE 10TH, 11TH AND 12TH FLOOR OF AN EXISTING HIGH-RISE STRUCTURE. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK**
- Issued Dec 18, 2025
Addition and/or Alteration · -Install (742) Category 6, Plenum Cables for Data and CCTV -Install (327) Emitters for Sound Masking -Install (16) Composite, Plenum Cables for Access Control & Intrusion -Install A/V Cabling and Mount Equipment
- Issued Aug 31, 2025
Addition and/or Alteration · Install fire alarm for alterations .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- Issued Aug 21, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 21, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 200 sprinkler heads to ensure the safety of the building, per NFPA 13
- Issued Jul 29, 2025
Alterations · Sanitary, waste and vent pipe for sinks and drinking fountains; domestic water pipe; install plumbing fixtures and equipment; Other equipment = 2 drinking fountains
- Issued Jul 20, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING LIGHTING CONTROLS EXIT SIGNS, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS. INSTALL DEDICATED BRANCH CIRCUITS FOR EQUIPMENT. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS. ************************A SEPARATE FIRE ALARM IS REQUIRE**********************
Violations
5 entries
- Violation Feb 2, 2026OPEN
FACADES
- Violation Dec 15, 2025OPEN
HIGH-RISE BUILDING
- Violation Dec 15, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Dec 15, 2025OPEN
PERIODIC TESTING
- Violation May 22, 2025OPEN
OCCUPIED W/O FINAL APPROVAL
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.