Entity File · The Public Record
Owner of record
Trs Univ Of Penn
178 permits · 70 violations
- Records on file
- 248
Permits (as owner)
178 entries
- Issued Nov 2, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 27, 2026
Addition and/or Alteration · Provide interior electrical wiring to support the installation of a chiller plant and electrical room on the roof. Furnish and install a fire alarm system to protect the new installation, including all required initiating devices, notification appliances, control equipment, modules and wiring All work to be perform according to the 2019 NFPA 72, 2020 NEC and per approved plans.
- Issued Oct 27, 2026
Signs (Accessory / Non-Accessory) · For the replacement of one (1) statically-illuminated wall sign and the documentation of refacing one (1) banner sign. Sign and location as shown in application/plans.
- Issued Oct 26, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ).FOR AN ELEVATOR UPGRADE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Oct 22, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES NOT CONNECTED VIA DUCTWORK; APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 12, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A CLIMBING/FITNESS CENTER (PERSONAL SERVICES) IN SPACE 110/120 ON THE GROUND FLOOR AND SECOND FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2021 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Oct 10, 2026
Addition and/or Alteration · Furnish and install fire alarm wiring per Siemens drawings and install devices as per 2016 NFPA 72.
- Issued Oct 5, 2026
Sitework with Onsite Utility Services · FOR A SITEWORK PERMIT PER APPROVED PLANS. PLUMBING WORK TO BE INCLUDED AS PART OF THE WORK.
- Issued Oct 4, 2026
Addition and/or Alteration · Replace 51 Light Fixtures, Replace 5 Light Switches And Replace 10 Outlets With No New Wiring To NEC Code
- Issued Oct 2, 2026
Addition and/or Alteration · Install New lighting, new power and extension of the existing fire alarm system. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72
- Issued Sep 29, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF 170 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- Issued Sep 28, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING NFPA 13 AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL SPRINKLER HEADS THROUGHOUT A PARTIAL PENTHOUSE SPACE. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH PA DOH APPROVAL BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-000474 FOR ASSOCIATED BUILDING PERMIT.
- Issued Sep 22, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Sep 21, 2026
Rough-In · Rough-In Permit for FP-2026-001952 DEMO WET SPRINKLER SYSTEM ON LOWER LEVEL. INSTALL NEW WET SPRINKLER PIPING & HEADS TO ACCOMMODATE NEW FITOUT AND CEILINGS AS PER NFPA 13 AND LOCAL CODES
- Issued Sep 11, 2026
Alterations · Demo 2 backwater valves, 1 trap and piping. Install 3 backwater valves, 2 traps & sanitary/storm pipe. Work being completed within building and vault space below (not exterior/underground). - Approved plumbing repair work per EZ Permit Standard for Plumbing
- Issued Sep 10, 2026
Addition and/or Alteration · FIRE ALARM: No new building fire alarm system scope. As per NFPA 72. ELECTRICAL: Branch: (22) GFCI receptacles; (4) Quad receptacles; . Lighting: Controls: (8) Dimmer switches. Fixtures: (2) 2x2 ; (3) 2x4 ; (18) Downlight; (1) Nightlight; (544) Clean & relamp existing fixture. Security : (9) Cameras; (4) Monitors; All cabling by others. As per APPROVED DRAWINGS -2020 NEC.
- Issued Sep 3, 2026
Alterations · furnish & install new fixtures, associated domestic water, sanity & vent piping. including (1) bottle filler, & (1) Mop Receptor
- Issued Sep 3, 2026
Alterations · ALTERATIONS TO EXISTING COMMMERCIAL BUILDING TO INCLUDE REROUTING AND REPLACEMENTS OF PIPING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2021 PPC AND APPROVED PLANS
- Issued Sep 2, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Aug 26, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For the interior demolition of non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans.
- Issued Aug 24, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE STRUCTURAL WORK, DUNNAGE, PARTIAL DEMO, INFILLS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2021 IBC*
- Issued Aug 13, 2026
Addition and/or Alteration · Furnish & Install Power Per Plans using existing circuits.-PER APPROVED DRAWINGS-2020 NEC
- Issued Aug 12, 2026
Addition and/or Alteration · Install all SSI-supplied fire alarm devices, including modules and the control panel associated with the pre action sprinkler system. Provide all required wiring, connections, terminations. All work to be perform according to the 2020 NEC, 2019 NFPA 72 and per approved plans.
- Issued Aug 10, 2026
Lawful Occupancy (LO) ONLY · FOR LAWFUL OCCUPANCY AT LEVY B13 AUDITORIUM AS PREVIOUSLY APPROVED UNDER PERMIT# 1054284.
- Issued Aug 10, 2026
Alterations · Install water softner, RO skid, add new and replace roof drain's, floor drain sand 1 shower INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS
- Issued Aug 5, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 4, 2026
Lawful Occupancy (LO) ONLY · FOR THE REISSUANCE OF LAWFUL OCCUPANCY SIGNAGE FOR EVANS BUILDING LOWER CONCOURSE LECTURE HALL #LL60. SEE AP#744630 FOR PREVIOUSLY ISSUED LAWFUL OCCUPANCY SIGNAGE FOR THIS SPACE. **2021 IEBC REVIEW**
- Issued Jul 23, 2026
Addition and/or Alteration · Per the historical society: No exterior work permitted as part of this permit. Electrical Scope: Install new lighting, theatrical lighting, lighting controls, HVAC power wiring. Install one lighting inverter, four 200A enclosed circuit breakers, and four relay panels as per the single line on E-502. Install one fire alarm relay for equipment. All work per approved plans, NEC 2017 & NFPA 2016
- Issued Jul 22, 2026
Addition and/or Alteration · Perform the electrical fit-out of a compounding pharmacy and associated infrastructure. Furnish and install the required electrical distribution equipment, including electrical gear, feeders, branch circuits, and all associated wiring and conduit. Provide complete power distribution for lighting, lighting controls, receptacle outlets and equipment. Furnish and install a complete fire alarm system and connect with the existing fire alarm system for the building. All work shall be performe
- Issued Jul 9, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans Relocate (159) sprinklers on 5th floor for pharmacy relocation
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR A TENANT FIT-OUT TO A PORTION OF AN EXISTING STRUCTRURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Jul 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (2) sprinklers to accommodate interior alterations to 5th floor
- Issued Jul 6, 2026
Addition and/or Alteration · MODIFY EXISTING FIRE ALARM SYSTEM: PROVIDE NEW DEVICES, RELOCATE AND DEMO EXISTING DEVICES IN THE AUDIO BOOTH. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS.
- Issued Jul 6, 2026
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING MERCANTILE BUILDING (RETAIL STORE). ALTERATIONS TO INCLUDE THE ERECTION OF AUTOMATIC GATES. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 2, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-003424
- Issued Jun 25, 2026
Addition and/or Alteration · Install interior wiring for audio booth. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO TELE-COM wiring on this permit**
- Issued Jun 23, 2026
EZ Roof Covering Replacement · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Jun 22, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE THE REMOVAL OF DOOR AND INSTALLATION OF AUDIO BOOTH AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- Issued Jun 22, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocating 6 sprinkler heads
- Issued Jun 22, 2026
EZ Roof Covering Replacement · For the Installation of New Roof Coverings on Existing Roofs as per attached standard. Deviations from these standards require submission of construction and site plans.
- Issued Jun 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (3) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 16, 2026
Addition and/or Alteration · PER The Historical Commission: No exterior work permitted as part of this permit. Install new light fixtures, lighting controls, and receptacles. Install (3) new motor starters for exhaust fans. ALL WORK PER APPROVED PLANS ***NO FIRE ALARM ON THIS PERMIT**
- Issued Jun 15, 2026
Alterations · Install 2-lavatories; 5- water closets; 8- tub/shower; 2- hose bibs; 2- floor drains to include all necessary piping as per plans
- Issued Jun 15, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (22) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 12, 2026
Addition and/or Alteration · Replacing hot water heaters and some devices as per 2017 NEC.
- Issued Jun 12, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RELOCATION OF PHARMACY TO FIFTH FLOOR OF EXISTING HOSPITAL BUILDING (FOUNDERS) AS PER APPROVED PLANS AND PA DOH APPROVAL. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jun 9, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF 4 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- Issued Jun 9, 2026
Addition and/or Alteration · New lighting and new branch power. New power for replacement lockers. Four new branch panel boards, one new transformer. All work per approved plans ***NO FIRE ALARM ON THIS PERMIT***
- Issued Jun 9, 2026
Addition and/or Alteration · Install lighting, receptacles, ceiling fans, and heating panels. Adding new 100 amp 3 phase 277/480 panel to an existing 200 amp service as per 2017 NEC. Install new devices to an Fire Alarm system as per 2016 NFPA 72.Install lighting, receptacles, ceiling fans, and heating panels. Adding new 100 amp 3 phase 277/480 panel to an existing 200 amp service as per 2017 NEC. Install new devices to an Fire Alarm system as per 2016 NFPA 72.
- Issued Jun 4, 2026
Addition and/or Alteration · Install lighting, switches, lighting controls, receptacles, telecommunication wiring, and provide power to equipment as per 2017 NEC. Electrical service is existing.
- Issued Jun 4, 2026
Addition and/or Alteration · Install new panel LR116C from existing panel LR116, receptacles, lighting, lighting control, and power for HVAC as per 2017 NEC. Excludes fire alarm.
- Issued Jun 4, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Jun 2, 2026
Alterations · Install 1 hot water heater, 10 backflow preventers, 1 mop sink, 1 hand sink, 1 prep sink, 1 three compartment sink, 5 floor drains, 3 lavatories, 3 water closets, 6 floor sinks, 2 kitchen sinks and 1 grease interceptor. All work to be done according to the 2018 PPC and per approved plans.
- Issued May 27, 2026
1 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued May 27, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued May 26, 2026
Addition and/or Alterations · FORA MECHANICAL SYSTEM UPGRADE TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued May 21, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued May 20, 2026
Alterations · Install 1 hood cup sink, 1 lab sink, 1 emergency shower and pipe.
- Issued May 19, 2026
Addition and/or Alterations · FOR MODIFICATION/EXPANSION OF EXISTING FIRE SPRINKLER SYSTEM AND STANDPIPES PER APPROVED PLANS, HYDRAULIC CALCULATIONS, NFPA 13 AND NFPA 14.
- Issued May 12, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued May 5, 2026
1 units
Addition and/or Alteration · FOR EXTERIOR ALTERATIONS AT THE ROOF TO INSTALL FALL-PROTECTION GUARDS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 1, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Apr 30, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE INSTALLATION OF GUARD RAILS AND LADDERS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 29, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Apr 28, 2026
1 units
Addition and/or Alteration · FOR EXTERIOR ALTERATIONS AT THE ROOF TO INSTALL FALL-PROTECTION GUARDS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 27, 2026
Alterations · AMENDED 05.01.26 TO ADD THE Furnish and install all sanitary, venting, and domestic water piping for (2) new water closets and (2) new lavatories in same area as pantry space. Furnish and install all required sanitary, venting, domestic cold, and domestic hot water for one (1) new pantry sink and one (1) ice maker/water dispenser with funnel drain in cabinet.
- Issued Apr 27, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS ASSOCIATED PIPING AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Apr 27, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE REPAIRS, THRESHOLDS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued Apr 26, 2026
Alterations · Install 4- new instant water heaters to include all necessary piping ALL WORK PERFOMRED IN STRICT COMPLIANCE WITH 2018 PPC AND EZ PLUMBING STANDARD.
- Issued Apr 23, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. Streets Department permit is required for street closure prior to the start work if applicable.
- Issued Apr 23, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Apr 23, 2026
EZ Roof Covering Replacement · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Apr 22, 2026
Alterations · INSTALL/REPLACE 1 water closet, 1 water fountain, 1 shower, 1 double bowl lavatory, 1 floor drain.
- Issued Apr 15, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATION TO INCLUDE EXTERIOR WALL PENETRATION AND ROOF PENETRATION AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR AND MEP WORK.
- Issued Apr 10, 2026
Addition and/or Alteration · From an existing 200-amp electrical panel, install a 60-amp feeder to supply one (1) 60-amp subpanel, including all required overcurrent protection, grounding, bonding, and terminations. From the new subpanel, install two (2) branch circuits: one (1) dedicated circuit for equipment and one (1) circuit for additional alternates. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Apr 10, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 4 Heads
- Issued Apr 10, 2026
Addition and/or Alteration · FIRE ALARM: (3) Strobe; (2) Smoke Detector. As per NFPA 72. ELECTRICAL: (3) Connect to existing panels – add new breakers: (1) 70/3; (1) 30/2; (4) 20/2; (15) 20/1. New panel: (1) 6EMIT 70A MCB 30P. Lighting: (215) fixtures; (3) controls. Branch: (68) Duplex Receptacles; (22) Junction box & connection 20/1; (1) FCU & disconnect switch 30/2; (1) poke thru. Nurse call: (1) Master station; (37) Centrak devices; (1) Test existing. Security : (1) Card reader ; (1) strike; (1) door contact. T/D
- Issued Apr 8, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE TRENCHING FOR UTILITIES, NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK*
- Issued Apr 8, 2026
1 units
Addition and/or Alteration · FOR LEVEL 1 INTERIOR ALTERATIONS THROUGHOUT AND STRUCTURAL ALTERATIONS TO ERECT A CATWALK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL, AND PLUMBING WORK. NO CHANGE TO EXISTING GROUP A-1 OCCUPANCY (UNIVERSITY OF PENNSYLVANIA IRVINE AUDITORIUM).
- Issued Apr 7, 2026
Temporary Tents and Canopies · ASSEMBLY USE TENT - LAWFUL OCCUPANCY SHALL BE AS POSTED - REMOVAL DATE ELECTRICAL PERMIT REQUIRED, UNLESS POWER IS PROVIDED THROUGH EXISTING EXTERIOR GROUND FAULT PROTECTED RECEPTACLES AND POWER CORDS ARE RATED EXTRA HEAVY DUTY WITH U. L. LABEL STATING SUCH RATING. NO COOKING OR HEATING PERMITTED WITH THIS APPROVAL. IF TENT IS NOT READY FOR INSPECTION TO INCLUDE ELECTRICAL COMPONENTS, AN ADDITIONAL WILL BE APPLIED FOR ANY AFTER HOURS INSPECTION WITH POSSIBLE ISSUANCE OF CODE VIOLATION NOTICES.
- Issued Apr 6, 2026
Addition and/or Alteration · Install Power, Lighting, and fire alarm per approved plans. NEC 2017
- Issued Apr 6, 2026
Change of Use · Eating and Drinking Establishments - Prepared Food Shop
- Issued Apr 1, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING NFPA 13 AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL NEW SPRINKLER HEADS AND ASSOCIATED PIPING THROUGHOUT RENOVATED SPACES. ALL WORK TO BE DONE PER APPROVED PLANS BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE CP-2025-004867 FOR ASSOCIATED BUILDING PERMIT.
- Issued Mar 31, 2026
1 units
Addition and/or Alteration · FOR CHANGE OF OCCUPANCY AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Mar 30, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS (WITH NO CHANGE OF OCCUPANCY) AT FIRST FLOOR OF EXISTING BUILDING. SEPARATE PERMIT REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Mar 30, 2026
Addition and/or Alterations · DEMOLITION AND INSTALLATION OF MECHANICAL EQUIPMENT IN AN EXISTING HOSPITAL BUILDING (FOUNDERS BUILDING) INCLUDING ASSOCIATED PIPING, VALVES, INSULATION AND SUPPORTS AS PER APPROVED PLANS AND PA DOH APPROVALS. *2018 IEBC REVIEW*
- Issued Mar 23, 2026
Alterations · Demo existing pipe and fixtures. Install 9 water closets, 2 urinals, 5 sinks, 3 emergency showers, 6 floor drains & piping.
- Issued Mar 19, 2026
Addition and/or Alteration · Demo lighting and receptacles. Install new lighting, receptacles, utilizing existing circuitry as per 2017 NEC.
- Issued Mar 13, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (21) sprinklers on 5th floor
- Issued Mar 5, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO THE 5TH FLOOR OF THE FOUNDERS BUILDING IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PA DOH APPROVAL. FOR USE AS PREVIOUSLY APPROVED. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. 05
- Issued Mar 3, 2026
Alterations · REPLACE 6 lavs, 6 water closets, 4 bath tubs & 2 showers. **WITHOUT PIPING**
- Issued Feb 27, 2026
Addition and/or Alteration · DEMO/ TEMPORARY LIGHTNG & POWER/ ADD NEW POWER PANELS/ADD NEW BRANCH WIRING/ADD NEW LIGHTING AND LIGHTING CONTROLS as per electrical plans-2017 NEC. AMENDMENT: Install fire alarm as per plans.
- Issued Feb 20, 2026
Addition and/or Alteration · FIRE ALARM: (9) Duct Smoke Detector; (9) Damper module; (9) Rem Test Station & Key switch; (9) Relay. As per 2016 NFPA 72. ELECTRICAL: (2) Connect to existing trough; (2) Enclosed CB: (1) 250/175; 250/200; (3) Integral Panel in AHU-1301; (1) Connect to existing panel LEQ15F 100/3; (2) Connect new pumps to existing MCC (2) 100/3. Disconnect switches: (1) 20/1; (1) 35/1; (1) 40/1; (6) 20/3; (1) 40/3; (1) 60/3. Motor starters: (2) 20/3; (1) 60/3. Motor connections: (3) 20/1; (6) 20/3; (2) 40/3
- Issued Feb 9, 2026
1 units
Addition and/or Alteration · LEVEL I EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR PARTIAL DEMOLITION AND INSTALLATION OF WINDOWS TO AN EXISTING STRUCTURE. AS PER APPROVED PLANS. *********************************SEPARATE PERMITS FOR ANY OTHER WORK. *************************
- Issued Feb 9, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM YUPGRADE TO A PORTION OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Feb 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Feb 5, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF AN EXISTING HOSPITAL. WORK TO INCLUDE STRUCTURAL UPGRADE FOR MEP INSTALLATION AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Feb 4, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
Violations
70 entries
- Violation Oct 28, 2026OPEN
FIRE EXTINGUISHER CONSPICUOUS LOCATION
- Violation Oct 28, 2026OPEN
UNAPPROVED CONDITIONS
- Violation Oct 28, 2026OPEN
EXTENSION CORDS
- Violation Oct 28, 2026OPEN
FIRE RESISTANCE RATED CONSTRUCTION
- Violation Oct 21, 2026OPEN
FIRE EXTINGUISHERS
- Violation Oct 21, 2026OPEN
EXIT SIGN ILLUMINATION
- Violation Oct 21, 2026OPEN
MANUAL FIRE ALARM BOX SIGNS
- Violation Oct 21, 2026OPEN
WET CHEMICAL SYSTEMS
- Violation Oct 21, 2026OPEN
PERIODIC TESTING
- Violation Oct 15, 2026OPEN
UNAPPROVED CONDITIONS
- Violation Oct 15, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 15, 2026OPEN
UNAPPROVED CONDITIONS
- Violation Oct 15, 2026OPEN
SELF- OR AUTOMATIC-CLOSING DOORS
- Violation Oct 15, 2026OPEN
EQUIPMENT ROOMS
- Violation Oct 15, 2026OPEN
UTILITY IDENTIFICATION
- Violation Oct 15, 2026OPEN
UTILITY IDENTIFICATION
- Violation Oct 5, 2026OPEN
WET CHEMICAL SYSTEMS
- Violation Sep 25, 2026OPEN
FACADES
- Violation Sep 17, 2026OPEN
FIRE EXTINGUISHER SIZE & DISTRIBUTION
- Violation Sep 17, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Sep 17, 2026OPEN
FIRE EXTINGUISHERS
- Violation Sep 17, 2026OPEN
RECORD KEEPING
- Violation Sep 17, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Sep 17, 2026OPEN
FIRE EXTINGUISHER UNOBSTRUCTED & UNOBSCURED
- Violation Sep 17, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation Sep 17, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Sep 17, 2026OPEN
HIGH RISE BUILDINGS
- Violation Sep 17, 2026OPEN
FIRE EXTINGUISHERS
- Violation Sep 17, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Sep 17, 2026OPEN
HIGH RISE BUILDINGS
- Violation Sep 2, 2026OPEN
EXIT SIGNS
- Violation Sep 2, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Sep 2, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Sep 2, 2026OPEN
POSTING OF OCCUPANT LOAD
- Violation Sep 2, 2026OPEN
RECORDS
- Violation Sep 2, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Aug 17, 2026OPEN
PRIVATE BRIDGE
- Violation Aug 14, 2026OPEN
FACADES
- Violation Aug 10, 2026OPEN
FACADES
- Violation Aug 4, 2026OPEN
FACADES
- Violation Jul 10, 2026OPEN
PORTABLE HEATING & COOKING EQUIPMENT
- Violation Jul 10, 2026OPEN
INSPECTION, TESTING AND MAINTENANCE
- Violation Jul 10, 2026OPEN
UTILITY IDENTIFICATION
- Violation Jul 10, 2026OPEN
FDC SIGNAGE REQUIRED
- Violation Jun 29, 2026OPEN
PEST ELIMINATION INFESTATION
- Violation Jun 29, 2026OPEN
INTERIOR SURFACES
- Violation Jun 3, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jun 3, 2026OPEN
RELIABILITY
- Violation Jun 3, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jun 3, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jun 3, 2026OPEN
POSTING OF OCCUPANT LOAD
- Violation Jun 3, 2026OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Jun 3, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Jun 3, 2026OPEN
EQUIPMENT ACCESS
- Violation May 16, 2026OPEN
SPECIAL ASSEMBLY OCCUPANCY LICENSE
- Violation May 16, 2026OPEN
OCCUPIED W/O TCO OR CO
- Violation May 7, 2026OPEN
EXTERIOR AREA SANITATION
- Violation Mar 31, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Mar 31, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Mar 31, 2026OPEN
FIRE EXTINGUISHERS
- Violation Feb 4, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Feb 2, 2026OPEN
FACADES
- Violation Jan 23, 2026OPEN
RENTAL LICENSE MULTI FAMILY (R2)
- Violation Jan 14, 2026OPEN
WET CHEMICAL SYSTEMS
- Violation Jan 14, 2026OPEN
PERIODIC TESTING
- Violation Jan 14, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jan 14, 2026OPEN
PERIODIC TESTING
- Violation Oct 16, 2025OPEN
UNAPPROVED CONDITIONS
- Violation Oct 16, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 20, 2025OPEN
PERIODIC TESTING
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 7, 2026.