Permits (as owner)

11 entries

  1. Issued Oct 12, 2026

    3300-20 Walnut St

    Addition and/or Alteration · Installation of new light fixtures & controls. Installation of new receptacles, devices and wiremold. Installation of heat trace. Installation of 2 buck boost transformers. Remove & relocate fire alarm devices. All work completed per sealed electrical and fire alarm drawings. All work performed per NEC 2020 and 2019 NFPA 72.

  2. Issued Sep 18, 2026

    3300-20 Walnut St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. THIS APPLICATION WAS REVIEWED UNDER THE 2021 IMC.

  3. Issued Jul 21, 2026

    3300-20 Walnut St

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (11) sprinkler heads to accommodate interior alterations

  4. Issued Jun 16, 2026

    3300-20 Walnut St

    Addition and/or Alteration · Install new light fixtures & controls. Install new receptacles. Remove & relocate existing fire alarm as shown on drawings. Installation shall comply with 2017 NEC and 2016 NFPA 72.

  5. Issued Jun 3, 2026

    3300-20 Walnut St

    Addition and/or Alterations · FOR A MECHANICAL ALTERATION TO ACCOMMODATE A PORTION OF THE SECOND FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  6. Issued May 19, 2026

    3300-20 Walnut St

    Alterations · ALTERATIONS TO RESTROOMS IN SCHOOL. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS Provide labor and materials to extend form existing sanitary and domestic water as shown on drawings. Furnish and install (7) wash closets,

  7. Issued Apr 9, 2026

    1 units

    3300-20 Walnut St

    Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING EDUCATIONAL BUILDING, ALTERATIONS TO INCLUDE THE ERECTION OF FALL PROTECTION MEASURES ON THE ROOF. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  8. Issued Apr 7, 2026

    1 units

    3300-20 Walnut St

    Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO SECOND FLOOR TOILET ROOMS WITHIN AN EXISTING HIGHER EDUCATIONAL FACILITY (MOORE SCHOOL - D-2) AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**

  9. Issued Mar 16, 2026

    3300-20 Walnut St

    Addition and/or Alteration · Demo abandoned Motor Control center. Power new Mechanical Equipment (air compressor, dryer, electronic drain). ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.

  10. Issued Mar 3, 2026

    3300-20 Walnut St

    Alterations · Demo air compressor and pipe. Install owner supplied air compressor and pipe.

  11. Issued Feb 16, 2026

    1 units

    3300-20 Walnut St

    Addition and/or Alteration · FOR CONCRETE REPAIRS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.

Violations

5 entries

  1. Violation Nov 12, 2026OPEN

    3300-20 Walnut St

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

  2. Violation Nov 12, 2026OPEN

    3300-20 Walnut St

    PERIODIC TESTING

  3. Violation Nov 12, 2026OPEN

    3300-20 Walnut St

    PENETRATIONS MAINTAINING PROTECTION

  4. Violation Nov 12, 2026OPEN

    3300-20 Walnut St

    FIRE EXTINGUISHER HANGERS & BRACKETS

  5. Violation Feb 25, 2026OPEN

    3300-20 Walnut St

    FACADES

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 23, 2026.