Entity File · The Public Record
Owner of record
Trustees Of The, Univ Of Pennsylvania
28 permits · 4 violations
- Records on file
- 32
Permits (as owner)
28 entries
- Issued Jun 26, 2026
Alterations · Furnish and install (2) lavatories, (2) water closets, and 2 floor drains for new bathroom. F&I (1) mop sink for new janitors closet. Install (2) sinks, (2) floor drains and equipment plumbing connection for new Café Kiosk.
- Issued Jun 25, 2026
Addition and/or Alteration · Install 6 EV level two chargers Install new panel and transformer Install conduit ,disconnects, and wire ,bollards for mechanical protection to be installed. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Jun 16, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (48) existing sprinkler heads to accommodate interior alterations
- Issued Jun 15, 2026
Addition and/or Alteration · Furnish & Install Lighting Per Plans. Lighting is 1 for 1 Replacement - all existing circuits to be re-utilized. All lighting controls on drawing are existing to remain. No new wiring. Scope of work entails disconnecting existing fixtures and using existing wiring to connect new fixtures. ALL WORK IS TO BE DONE ACORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Jun 4, 2026
Addition and/or Alteration · Furnish & Install Fire Alarm per approved plans
- Issued May 21, 2026
Addition and/or Alteration · Install branch circuits to provide power for receptacle outlets, poke-through devices, lighting fixtures, switches, exit signs, emergency lighting, equipment, appliances, security cameras, and associated devices. All work shall be performed in accordance with the 2017 NEC and per approved plans. (The fire alarm system is not included in the scope of work)
- Issued May 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued May 8, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Apr 21, 2026
Alterations · Demo existing sanitary, vent, and domestic water of existing kitchen in existing auditorium space. Furnish and Install (2) water closets, (2) lavatories, (1) water cooler, and (1) 30 gallon water heater.
- Issued Apr 16, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*
- Issued Mar 24, 2026
Addition and/or Alteration · Furnish & Install Exterior Conduits and Lighting for Site Work as per 2017 NEC.
- Issued Mar 5, 2026
Addition and/or Alteration · FIRE ALARM: (1) AV device. As per NFPA 72. ELECTRICAL: Lighting & controls: (18) fixtures, (16) switches. Branch: (19) receptacles; (1) furniture feed. Nurse call: (3) relocate pull station. T/D pathways: (9) Box & stub to ceiling (All cabling and equipment is by others). As per APPROVED DRAWINGS -2017 NEC.
- Issued Mar 4, 2026
New construction, addition, GFA change · FOR THE ERECTION OF A TRELLIS IN THE YARD OF AN EXISTING MEDICAL FACILITY. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN.
- Issued Mar 4, 2026
General Earth Disturbance ONLY · For an earth disturbance work as per approved plans. **Exterior work only**
- Issued Feb 23, 2026
Addition and/or Alteration · Installation of a complete fire alarm system, including fire alarm control equipment, initiating devices, notification appliances, and all associated wiring. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Feb 10, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) sprinklers on ground floor to accommodate interior alterations
- Issued Feb 5, 2026
Alterations · Add 3 sinks, waste and water piping to existing space.
- Issued Feb 4, 2026
Addition and/or Alterations · FOR THE RELOCATION OF DIFFUSERS AND INSTALLATION OF ONE (1) DIFFUSER WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jan 23, 2026
Addition and/or Alteration · FIRE ALARM: No fire alarm scope. ELECTRICAL: (1) Connect to existing 400/3 circuit breaker in existing panel G-CAM-13W-DPH-IMAG; Adjust trip setting to 150A. (1) connect to existing 150/3 enclosed circuit breaker. (1) connect to Canon PD (power distribution unit). As per 2017 NEC.
- Issued Jan 15, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING HOSPITAL. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Jan 13, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING HOSPITAL. ** ALL WORK TO BE DONE PER APPROVED PLANS AND DOH APPROVAL.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Jan 13, 2026
Addition and/or Alteration · Furnish and install electrical wiring and power for lighting, lighting controls, exit signs, emergency lighting, and receptacle outlets serving the auditorium, closets, control room, offices, catering preparation areas, and food retail spaces. All work to be done according to the 2017 NEC and per approved plans. (FIRE ALARM IS NOT INCLUDED IN THIS PERMIT)
- Issued Jan 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. MK FIRE PROTECTION TO RELOCATE 75 SPRINKLER HEADS
- Issued Dec 15, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. *AMEND 3/2/2026; REVISED FLOOR PLANS PER AMENDED CONSTRUCTION DOCUMENTS*
- Issued Aug 26, 2025
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Jul 24, 2025
Addition and/or Alteration · FIRE ALARM: (1) smoke detector; (3) strobes. As per NFPA 72. ELECTRICAL: Distribution: (4) connect to existing panels/provide new breakers; (1) panel – 100A/60A MCB 42P. Branch: (101) receptacles. Lighting: (50) fixtures; (2) controls. Nurse Call: (2) nurse station; (2) dome light; (3) relocate. T/D pathways: (51) Box & stub to ceiling (All cabling and equipment is by others). Security: (1) card reader. As per APPROVED DRAWINGS-2017NEC,2016 NFPA-72.
- Issued Jul 10, 2025
Alterations · INTERIOR RENOVATION TO EXISITING BUILDING. INSTALLATION OF 5 NEW SINKS AND ALL ASSOCIATED PIPING REQUIRED. MATERIALS SHALL BE 100% METALLIC PIPING WITH APPROVED JOINTS. ALL WORK TO BE PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jul 10, 2025
Alterations · INTERIOR RENOVATIONS TO PEARLMAN CENTER SECOND FLOOR. SCOPE OF WORK TO INCLUDE DEMOLISH AND CAP EXISTING FIXTURES AND DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR NEW FIXTURES LISTED CONNECTING TO EXISTING METALLIC PIPING. ALL MATERIALS UTILIZED SHALL BE METALLIC. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
Violations
4 entries
- Violation May 29, 2026OPEN
FACADES
- Violation Feb 3, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 1, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Oct 1, 2025OPEN
SMOKE CONTROL SYSTEM RECORDS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 16, 2026.