Entity File · The Public Record
Owner of record
Washington Square West Pr
54 permits · 20 violations
- Records on file
- 74
Permits (as owner)
54 entries
- Issued Nov 2, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Oct 29, 2026
Addition and/or Alteration · • Replace all interior lighting in existing locations with LED fixtures. Provide emergency lighting as needed. • Provide GFCIS to meet code requirements. • Replace exhaust fans or provide new ones as indicated. At bathrooms provide continuous run with boost for tenant use. • Replace and/or add including smoke and CO alarms. • Power to be provided as needed for access control intercoms (to be replaced by security vendor). • Replace all outlets and switches as well as cover plates throughout bui
- Issued Oct 29, 2026
Addition and/or Alteration · • Replace all interior lighting in existing locations with LED fixtures. Provide emergency lighting as needed. • Provide GFCIS to meet code requirements. • Replace exhaust fans or provide new ones as indicated. At bathrooms provide continuous run with boost for tenant use. • Replace all outlets and switches as well as cover plates throughout buildings. Provide grounding as needed. • Replacement of common-area and exterior lighting, including emergency egress lighting and exit signage. Installat
- Issued Oct 29, 2026
Addition and/or Alteration · • Replace all interior lighting in existing locations with LED fixtures. Provide emergency lighting as needed. • Provide GFCIS to meet code requirements. • Replace exhaust fans or provide new ones as indicated. At bathrooms provide continuous run with boost for tenant use. • Replace all outlets and switches as well as cover plates throughout buildings. Provide grounding as needed. • Replacement of common-area and exterior lighting, including emergency egress lighting and exit signage. Installat
- Issued Oct 20, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Oct 16, 2026
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **IMC 2021**
- Issued Oct 16, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Oct 12, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Oct 8, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 7, 2026
Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Sep 30, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 30, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 30, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing.
- Issued Sep 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE REPLACEMENT OF FINISHES, FURNISHINGS, AND APPLIANCES. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ASBESTOS ABATEMENT REQUIRED PRIOR TO THE START OF WORK.
- Issued Sep 15, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Sep 15, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Sep 15, 2026
Alterations · Replace domestic water heater and hot water storage tanks in kind. Repair/replace existing drain pans and expansion tanks for tank-type water heaters where needed. Add drain pans and expansion tanks where missing. • Replace all plumbing fixtures including but not limited to sinks, toilets, tubs/showers. Provide new valves at tubs/showers. Provide 3 piece surrounds. • Remove all remaining garbage disposals. • Replace shutoff valves throughout buildings.• Hydro jet sewer lines to ensure they are
- Issued Sep 14, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing-
- Issued Sep 14, 2026
Addition and/or Alterations · **2021 IMC REVIEW** FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Sep 14, 2026
Addition and/or Alterations · TO REPLACE EXISTING HVAC SYSTEMS IN KIND, FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK AND INSTALLATION OF APPLIANCES NOT CONNECTED VIA DUCTWORK AND OTHER ASSOCIATED MECHANICAL WORK PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Sep 4, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, A DEHUMIDIFIER, GRDs, EXHAUST FANS, AND DOMESTIC KITCHEN HOODS WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC AND PHC APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. SEE CP-2026-002884 FOR ASSOCIATED BUILDING PERMIT.
- Issued Sep 4, 2026
Addition and/or Alterations · FOR ALTERATIONS TO THE EXISTING HVAC SYSTEMS THROUGHOUT THE BUILDING TO INCLUDE THE REPLACEMENT OF APPLIANCES, GRDs, EXHAUST FANS, DOMESTIC KITCHEN HOODS, AND DEHUMIDIFIERS AND CLEANING/REPLACEMENT OF EXHAUST DUCTS TO ROOF/EXTERIOR WALL VENTS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC AND PHC APPROVAL. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-002774 FOR ASSOCIATED BUILDING PERMIT.
- Issued Sep 3, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 25, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Aug 25, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Aug 19, 2026
6 units
Addition and/or Alteration · FOR A LEVEL III INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING NOT SPRINKLERED** ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK**SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Aug 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, EXHAUST FANS, AND DOMESTIC KITCHEN HOODS WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: No work to fr
- Issued Aug 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, EXHAUST FANS, AND DOMESTIC KITCHEN HOODS WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: No work to fr
- Issued Aug 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, EXHAUST FANS, AND DOMESTIC KITCHEN HOODS WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: No work to fr
- Issued Aug 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, EXHAUST FANS, AND DOMESTIC KITCHEN HOODS WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC AND PHILADELPHIA HISTORICAL COMMISSION APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Aug 13, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 12, 2026
9 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS INCLUDING EXTERIOR ROOF WORK TO AN EXISTING R2 OCCUPANCY (9 DWELLING UNITS) WITHIN AN EXISTING BUILDING (239-241 S 13TH ST). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 10, 2026
3 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS INCLUDING EXTERIOR WORK TO THE ROOF TO AN EXISTING R2 OCCUPANCY (3 DWELLING UNITS) PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 10, 2026
3 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING R2 OCCUPANCY (3 DWELLING UNITS) PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 10, 2026
2 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO THE RESIDENTIAL PORTION OF AN EXISTING STRUCTURE. **EXTERIOR WORK TO BE INCLUDED IN THE REVIEW.** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. ** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Aug 10, 2026
Addition and/or Alterations · **2021 IMC REVIEW**FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: No work to front facade as part of this permit; no
- Issued Aug 7, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Aug 6, 2026
2 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE REPLACEMENT OF FINISHES, FURNISHINGS, AND DOORS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 6, 2026
6 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Aug 3, 2026
3 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Aug 3, 2026
3 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESIDENTIAL APARTMENT BUILDING WITH THREE (3) DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE
- Issued Jul 29, 2026
4 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE TO EXISTING GROUP R-2 FOUR (4) FAMILY DWELLING OCCUPANCY. BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK.
- Issued Jul 27, 2026
3 units
Addition and/or Alteration · FOR LEVEL I INTERIOR ALTERATIONS INCLUDING THE EXTERIOR ROOF WORK TO AN EXISTING R2 OCCUPANCY (3 DWELLING UNITS) IN AN EXISTING ATTACHED BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 27, 2026
6 units
Addition and/or Alteration · FOR LEVEL I INTERIOR ALTERATIONS INCLUDING THE EXTERIOR ROOF WORK AND STRUCTURAL WORK IN THE REAR PORTION OF BASEMENT & INFILL OF WINDOW OPENINGS IN THE SIDE EXTERIOR WALL TO AN EXISTING ATTACHED BUILDING FOR THE EXISTING USE OF R2 (6 UNITS) OCCUPANCY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 27, 2026
9 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS INCLUDING EXTERIOR ROOF WORK TO AN EXISTING R2 OCCUPANCY (9 DWELLING UNITS) WITHIN AN EXISTING BUILDING (239-241 S 13TH ST). ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 20, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING COMMERCIAL BUILDING FOR USE AS AN APARTMENT BUILDING WITH SEVEN (7) DWELLING UNITS (R-2 OCCUPANCY), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL FROM THE
- Issued Jul 20, 2026
5 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESIDENTIAL APARTMENT BUILDING WITH FIVE (5) DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE I
- Issued Jul 20, 2026
4 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESIDENTIAL APARTMENT BUILDING WITH FOUR (4) DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE I
- Issued Jul 16, 2026
3 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESIDENTIAL APARTMENT BUILDING WITH THREE (3) DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE
- Issued Jun 16, 2026
3 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESIDENTIAL APARTMENT BUILDING W/THREE (3) UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE IN A MANNER
- Issued Jun 12, 2026
3 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING RESIDENTIAL APARTMENT BUILDING WITH THREE (3) DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** NO CERTIFICATE OF OCCUPANCY REQUIRED FOR THIS WORK. ALTERATIONS SHALL BE DONE
Violations
20 entries
- Violation Sep 14, 2026OPEN
PERIODIC TESTING
- Violation Sep 14, 2026OPEN
RENTAL LICENSE- ONE & TWO FAMILY (R3)
- Violation Sep 14, 2026OPEN
RENTAL LICENSE MULTI FAMILY (R2)
- Violation Sep 8, 2026OPEN
PERIODIC TESTING
- Violation Sep 4, 2026OPEN
HIGH-RISE BUILDING
- Violation Apr 29, 2026OPEN
HIGH RISE BUILDINGS
- Violation Apr 29, 2026OPEN
UTILITY IDENTIFICATION
- Violation Apr 29, 2026OPEN
FIRE PROTECTION ROOM IDENTIFICATION
- Violation Apr 29, 2026OPEN
HAZARD IDENTIFICATION SIGNS
- Violation Apr 29, 2026OPEN
WASTE ACCUMULATION PROHIBITED
- Violation Apr 29, 2026OPEN
CEILING CLEARANCE
- Violation Apr 29, 2026OPEN
FDC INSPECTION, TESTING & MAINTENANCE
- Violation Apr 3, 2026OPEN
EXIT SIGNS WHERE REQUIRED
- Violation Apr 3, 2026OPEN
EXTERIOR STRUCTURE WINDOWS, SKYLIGHTS DOOR FRAMES
- Violation Apr 3, 2026OPEN
MEANS OF EGRESS DOOR OPERATION & LOCKS
- Violation Apr 3, 2026OPEN
WORKING SPACE & CLEARANCE
- Violation Aug 21, 2025OPEN
INTERIOR SURFACES
- Violation Aug 21, 2025OPEN
RENTAL LICENSE MULTI FAMILY (R2)
- Violation Jan 28, 2025OPEN
FACADES
- Violation Dec 9, 2024OPEN
RENTAL LICENSE MULTI FAMILY (R2)
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 7, 2026.