Entity File · The Public Record
Contractor
Zito Cologero
9 permits
- Records on file
- 9
Built (as contractor)
9 entries
- Issued Oct 27, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. MULTI FAMILY - EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES. For the replacement of 2 HVAC SYSTEMS . Unit 1 Installation of 60k BTU gas furnace, 92 % efficiency with 2 Ton coil and condenser. Unit 2
- Issued Oct 20, 2026
2 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A TWO-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2021 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. B
- Issued Oct 20, 2026
2 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A TWO-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2021 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. B
- Issued Oct 20, 2026
2 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION FOR USE AS A TWO-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2021 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. B
- Issued Oct 2, 2026
Addition and/or Alteration · FOR INTERIOR ALTERATIONS TO AN EXISTING TWO-FAMILY STRUCTURE AS PER APPROVED PLAN. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
- Issued Jun 16, 2026
Addition and/or Alteration · Interior renovations and for the rear addition to an existing single family attached structure. detail as shown in the plan.
- Issued May 1, 2026
3 units
Addition and/or Alteration · **LEVEL 3 ALTERATIONS, ADDITION & CHANGE OF OCCUPANCY** FOR THE ERECTION OF AN ADDITION AT THE REAR OF AN EXISTING RESIDENTIAL STRUCTURE FOR USE AS AN APARTMENT WITH THREE (3) DWELLING UNITS (R-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTH
- Issued Feb 4, 2026
Addition and/or Alterations · FOR A KITCHEN HOOD INSTALLTAION AS PER APPPROVED PLANS AND MANUFACTURER'S SPECIFICATION.
- Issued Jan 14, 2026
1 units
Addition and/or Alteration · PHASE II CONSTRUCTION WORK: FOR LEVEL II INTERIOR ALTERATIONS AT THE SECOND FLOOR FOR THE USE OF ASSEMBLY (A2) OCCUPANCY (SIT- DOWN RESTAURANT/ NIGHT CLUB) IN AN EXISTING BUILDING. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK. SEE CP-2023-000223 FOR THE PHASE I CONSTRUCTION WORK AT THE BASEMENT AND FIRST FLOOR.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 2, 2026.