63
First filed Jul 24, 2025Last activity Jun 15, 2026

On the record

Distress signals the city holds against this parcel — back taxes, open code violations, and unsafe designations.

28 violations on file

  • Violation May 14, 2026OPEN

    PERIODIC TESTING

  • Violation May 14, 2026OPEN

    EXIT SIGNS WHERE REQUIRED

  • Violation May 14, 2026OPEN

    UNAPPROVED CONDITIONS

  • Violation May 14, 2026OPEN

    UTILITY IDENTIFICATION

  • Violation May 14, 2026OPEN

    GROUP B OCCUPANCIES

  • Violation May 14, 2026OPEN

    EXIT DOORS

  • Violation May 14, 2026OPEN

    UTILITY IDENTIFICATION

  • Violation May 14, 2026OPEN

    GENERAL ILLUMINATION

  • Violation May 14, 2026OPEN

    UNAPPROVED CONDITIONS

  • Violation May 14, 2026OPEN

    HAZARD IDENTIFICATION SIGNS

  • Violation May 14, 2026OPEN

    SECURING COMPRESSED CYLINDERS

  • Violation May 13, 2026OPEN

    HAZARD IDENTIFICATION SIGNS

  • Violation May 13, 2026OPEN

    CEILING CLEARANCE

  • Violation May 13, 2026OPEN

    WASTE ACCUMULATION PROHIBITED

  • Violation May 13, 2026OPEN

    FIRE PROTECTION ROOM IDENTIFICATION

  • Violation May 13, 2026OPEN

    UNAPPROVED CONDITIONS

  • Violation May 13, 2026OPEN

    INSPECTION, TESTING & MAINTENANCE

  • Violation May 13, 2026OPEN

    OBSTRUCTIONS

  • Violation May 13, 2026OPEN

    HIGH RISE BUILDINGS

  • Violation May 13, 2026OPEN

    GENERAL ILLUMINATION

  • Violation May 13, 2026OPEN

    PENETRATIONS MAINTAINING PROTECTION

  • Violation May 13, 2026OPEN

    EXIT DOORS

  • Violation May 13, 2026OPEN

    DAMPER CERTIFICATION REPORT

  • Violation May 13, 2026OPEN

    PERIODIC TESTING

  • Violation May 13, 2026OPEN

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

  • Violation May 13, 2026OPEN

    OBSTRUCTIONS

  • Violation May 13, 2026OPEN

    EXIT DOORS

  • Violation May 13, 2026OPEN

    INSPECTION, TESTING & MAINTENANCE

The docket

35 entries

  1. Issued Jun 15, 2026

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: HERMAN GOLDNER CO INC

  2. Issued Jun 8, 2026

    Permit issued — Addition and/or Alteration

    Provide updated electrical panel, wiring devices, lighting. The service panel is 100amps · contractor: PALMAN ELECTRIC INC

  3. Issued Jun 8, 2026

    Permit issued — Alterations

    Install new kitchenette in student lounge · contractor: HERMAN GOLDNER CO INC

  4. Issued May 21, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 9 Sprinkler Heads · contractor: INDEPENDENCE FIRE SPRINKLER COMPANY

  5. Issued May 15, 2026

    Permit issued — Addition and/or Alteration

    FOR LEVEL II ALTERATIONS OF FORMER SUITE TO CREATE A NEW STUDENT RELAXATION SPACE INCLUDING KITCHENETTE AND LOUNGE AT 1ST FLOOR IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ****************************************** · contractor: Enliven Construction LLC · 1 units

  6. Issued Apr 29, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 19 existing heads · contractor: INDEPENDENCE FIRE SPRINKLER COMPANY

  7. Issued Apr 22, 2026

    Permit issued — Addition and/or Alteration

    Install receptacles, Fixtures, and raceways. PER APPROVED PLANS NEC2017 ***NO FIRE ALARM ON THIS PERMIT.*** · contractor: SEVILLE THERESA D & ROBERT

  8. Issued Apr 13, 2026

    Permit issued — EZ Roof Covering Replacement

    **Existing Philadelphia Historic Property** For repair / replacement of roof covering(s) on existing roof(s) in accordance with the attached EZ Permit Re-Roofing Standard. Failure to comply with the attached EZ Permit Re-Roofing Standard shall result in revocation of this permit. FOR THE POSSIBLE PRESENCE OF ASBESTOS . AN ABATEMENT SHALL BE PERFORMED PRIOR TO THE START OF WORK. TJU College Bldg, Roof Area A, remove existing roofing down to existing roof deck, replace in kind new EPDM roof sy

  9. Issued Mar 19, 2026

    Permit issued — Addition and/or Alteration

    FOR THE ERECTION OF AN ADDITION AND LEVEL II ALTERATIONS (PHASE 2) TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION. *2018 IEBC* · contractor: GILBANE BUILDING COMPANY · 1 units

  10. Issued Mar 19, 2026

    Permit issued — Addition and/or Alteration

    Install receptacles, lighting, lighting control, power for HVAC equipment, fire alarm system, empty conduits for data, panels, feeders, Nurse call .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. · contractor: PALMAN ELECTRIC INC

  11. Issued Mar 13, 2026

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW* · contractor: WEST CHESTER MECHANICAL CONTRACTORS INC

  12. Issued Mar 5, 2026

    Permit issued — Addition and/or Alteration

    Furnish and install a complete fire alarm system, including installation of forty-seven (47) smoke detectors, three (3) duct smoke detectors, forty-one (41) speaker/strobe notification appliances, one (1) magnetic door holder, and five (5) annunciators. Work includes all required fire alarm control equipment, power supplies, wiring, device mounting, terminations, . All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC, and per approved plans. · contractor: SEVILLE THERESA D & ROBERT

  13. Issued Feb 20, 2026

    Permit issued — New construction, addition, GFA change

    FOR THE ERECTION OF A SINGLE-STORY ADDITION IN AN EXISTING HOSPITAL, WITH ALL OTHER USES IN THE SAME STRUCTURE AS PREVIOUSLY APPROVED. SIZE AND LOCATION AS SHOWN IN THE PLAN. · contractor: Langan Engineering and Environmental Services, Inc.

  14. Issued Feb 10, 2026

    Permit issued — New Construction or Additions

    Demo and install New plumbing fixtures (1) WC, (2) Lav, (3) Sink, (1) FD, (1) Ice Machine, (2) Wall Boxes, (1) Ejector Pump, · contractor: WEST CHESTER MECHANICAL CONTRACTORS INC

  15. Issued Feb 5, 2026

    Permit issued — Alterations

    Add 1 new Sink · contractor: HERMAN GOLDNER CO INC

  16. Issued Jan 31, 2026

    Permit issued — Addition and/or Alteration

    Install 2 Door Holder and 1 Relay Module. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans. · contractor: SEVILLE THERESA D & ROBERT

  17. Issued Dec 23, 2025

    Permit issued — Addition and/or Alteration

    Install 1 receptacle outlet for each of the 4 bed lifts and 1 receptacle outlet for the automatic door opener. All work to be done according to the 2017 NEC and per approved plans. · contractor: SEVILLE THERESA D & ROBERT

  18. Issued Dec 10, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 165 Heads · contractor: INDEPENDENCE FIRE SPRINKLER COMPANY

  19. Issued Dec 7, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II INTERIOR ALTERATIONS AT THE 1ST FLOOR (PRE-PHASE AND PHASE #1 AS INDICATED ON THE PLANS) WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP I-2 HOSPITAL. EXISTING BUILDING IS SPRINKLERED. ALL WORK TO BE DONE PER PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PHC AND PA DOH APPROVALS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. · contractor: GILBANE BUILDING COMPANY · 1 units

  20. Issued Dec 5, 2025

    Permit issued — Addition and/or Alteration

    Install 2 Speaker / Strobes - 2 Strobes & Power Supply. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS. · contractor: SEVILLE THERESA D & ROBERT

  21. Issued Nov 20, 2025

    Permit issued — Addition and/or Alteration

    Install 26 Receptacles - 33 Emergency Outlets - 2 UPS GFI Rec's - Panel RP5TC - 1 Exit - 37 Fixtures - Conduit work for Equipment as per 2017 NEC. · contractor: SEVILLE THERESA D & ROBERT

  22. Issued Nov 20, 2025

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. DOH APPROVAL UNDER ID # 200801-02 AND DWG INDEX # H-25-0897. · contractor: HERMAN GOLDNER CO INC

  23. Issued Nov 17, 2025

    Permit issued — Alterations

    Add 1 sink 1 floor drain · contractor: HERMAN GOLDNER CO INC

  24. Issued Nov 15, 2025

    Permit issued — Addition and/or Alteration

    Install 4 Pull Stations - 8 Duct Detectors - 4 Smokes - 13 Strobes & 11 Speaker/ Strobes as per 2016 NFPA 72. · contractor: SEVILLE THERESA D & ROBERT

  25. Issued Nov 7, 2025

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF NEW SPRINKLER HEADS IN AN EXISITNG FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 WITH EXISTING BACKFLOW PREVENTION ASSEMBLY, FIRE PUMP, AND STANDPIPES. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: Oliver Sprinkler Co., Inc.

  26. Issued Nov 6, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 45 existing sprinkler heads · contractor: INDEPENDENCE FIRE SPRINKLER COMPANY

  27. Issued Nov 4, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 17 existing sprinkler heads to accommodate wall and ceiling changes · contractor: PREFERRED FIRE PROTECTION INC

  28. Issued Oct 30, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE FOR THE 5 MAIN BRONCH ROOM RELOCATION. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION, THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ****************************************** · contractor: P AGNES INC · 1 units

  29. Issued Oct 29, 2025

    Permit issued — Alterations

    ALTERATIONS TO EXISTIUNG MEDICAL SPACE. INSTALLATION OF DRAINAGE, WASTE, VENT, WATER SUPPLY, AND MEDICAL GAS PIPING FOR ALL ASSOCIATED FIXTURES AND EQUIPMENT. ALL PLUMBING TO NE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. MEDICAL GAS TO BE INSTALLED IN ACCORDANCE WITH NFPA 99 AND PERFORMED BY LISTED ASSE 6010 INSTALLER · contractor: CHADWICK SERVICE COMPANY

  30. Issued Oct 13, 2025

    Permit issued — Addition and/or Alteration

    INSTALL TWO PREACTION SYSTEM FOR SUBSTATION B-10 AND B-13. INSTALL HEAT DETECTORS IN AREA AND CONNECT THE PREACTION SYSTEMS TO THE FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA AND PER PLANS. · contractor: Current Electrical Solutions, Inc.

  31. Issued Sep 16, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL I ALTERATIONS FOR RENOVATIONS TO ELEVATOR LOBBIES ON 8TH AND 10TH FLOOR TO ACCOMODATE BED LIFT STORAGE UNITS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: P AGNES INC · 1 units

  32. Issued Sep 5, 2025

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. · contractor: CHADWICK SERVICE COMPANY

  33. Issued Aug 25, 2025

    Permit issued — Addition and/or Alterations

    FOR MODIFICATION TO EXISTING FIRE SPRINKLER SYSTEM PER APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13. · contractor: PREFERRED FIRE PROTECTION INC

  34. Issued Aug 21, 2025

    Permit issued — Addition and/or Alteration

    Install 108 Fixtures - 5 Exits - 101 Normal Receptacles - 49 Critical Care Receptacles - Raceways and Junction Boxes - 2 Electrical panels with 3 pole 100 amp Breakers in existing Panels for new Feeds - Nurse Call Devices in Exam rooms and Bathrooms . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT IS REQ'D** · contractor: SEVILLE THERESA D & ROBERT

  35. Issued Jul 24, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II INTERIOR ALTERATIONS TO EMERGENCY DEPARTMENT SPACE IN AN EXISTING HOSPITAL. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: GILBANE BUILDING COMPANY · 1 units

Nearby on the record

Other addresses in 19107 with recent activity on the public record.

The 19107 dashboard →The Washington Square West dashboard →Every recent record in 19107

Track this parcel

We'll flag the next deed, permit, or violation on the record here — including any sheriff-sale filing — usually before the neighbors know.

Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file June 15, 2026. Verify independently before relying on it.