City File · The Public Record
On the record
Distress signals the city holds against this parcel — back taxes, open code violations, and unsafe designations.
No open violations or delinquencies on record for this address.
The docket
78 entries
- Issued May 14, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-008022 · contractor: JAMES CIERVO
- Issued Apr 22, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-008021 · contractor: JAMES CIERVO
- Issued Apr 22, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-007991 · contractor: JAMES CIERVO
- Issued Mar 27, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-008021 · contractor: JAMES CIERVO
- Issued Mar 26, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-008023 · contractor: JAMES CIERVO
- Issued Mar 25, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-008019 · contractor: JAMES CIERVO
- Issued Mar 25, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-008019 · contractor: JAMES CIERVO
- Issued Mar 25, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-008021 · contractor: JAMES CIERVO
- Issued Mar 23, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-008015 · contractor: JAMES CIERVO
- Issued Mar 23, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-007991 · contractor: JAMES CIERVO
- Issued Mar 23, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-007991 · contractor: JAMES CIERVO
- Issued Mar 23, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-008015 · contractor: JAMES CIERVO
- Issued Mar 19, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-008024 · contractor: JAMES CIERVO
- Issued Mar 19, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-008022 · contractor: JAMES CIERVO
- Issued Mar 19, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-008022 · contractor: JAMES CIERVO
- Issued Mar 19, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-008023 · contractor: JAMES CIERVO
- Issued Feb 25, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-008023 · contractor: JAMES CIERVO
- Issued Feb 24, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-008019 · contractor: JAMES CIERVO
- Issued Feb 24, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-007991 · contractor: V&V Investment Inc
- Issued Feb 24, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-008022 · contractor: V&V Investment Inc
- Issued Feb 24, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-008021 · contractor: V&V Investment Inc
- Issued Feb 24, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-008029 · contractor: V&V Investment Inc
- Issued Feb 24, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-008019 · contractor: V&V Investment Inc
- Issued Feb 20, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-008023 · contractor: V&V Investment Inc
- Issued Feb 9, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: B M CONSULTING SERVICES INC
- Issued Feb 6, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: B M CONSULTING SERVICES INC
- Issued Feb 4, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: B M CONSULTING SERVICES INC
- Issued Feb 4, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: B M CONSULTING SERVICES INC
- Issued Feb 2, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA · contractor: B M CONSULTING SERVICES INC
- Issued Feb 2, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA · contractor: B M CONSULTING SERVICES INC
- Issued Jan 30, 2026
Permit issued — Rough-In
Rough-In Permit for FP-2026-000139 SUPPLY AND INSTALL ALL REQUIRED SPRINKLERS PER NFPA 13R SUPPLY AND INSTALL ALL REQUIRED PIPING, HANGERS AND FITTINGS PER NFPA 13R · contractor: B M CONSULTING SERVICES INC
- Issued Jan 30, 2026
Permit issued — Rough-In
Rough-In Permit for FP-2026-000132 SUPPLY AND INSTALL ALL REQUIRED SPRINKLERS PER NFPA 13R SUPPLY AND INSTALL ALL REQUIRED PIPING, HANGERS AND FITINGS PER NFPA 13R · contractor: B M CONSULTING SERVICES INC
- Issued Jan 30, 2026
Permit issued — Rough-In
Rough-In Permit for FP-2026-000134 SUPPLY AND INSTALL ALL REQUIRED SPRINKLERS PER NFPA 13R SUPPLY AND INSTALL ALL REQUIRED PIPING, HANGERS AND FITTINGS PER NFPA 13R · contractor: B M CONSULTING SERVICES INC
- Issued Jan 30, 2026
Permit issued — Rough-In
Rough-In Permit for FP-2026-000136 SUPPLY AND INSTALL ALL REQUIRED SPRINKLERS PER NFPA 13R SUPPLY AND INSTALL ALL REQUIRED PIPING, HANGERS AND FITTINGS PER NFPA 13R · contractor: B M CONSULTING SERVICES INC
- Issued Jan 30, 2026
Permit issued — Rough-In
Rough-In Permit for FP-2026-000137 SUPPLY AND INSTALL ALL REQUIRED SPINKLERS PER NFPA 13R SUPPLY AND INSTALL ALL REQUIRED PIPING, HANGERS AND FITTINGS PER NFPA 13R · contractor: B M CONSULTING SERVICES INC
- Issued Jan 30, 2026
Permit issued — Rough-In
Rough-In Permit for FP-2026-000133 SUPPLY AND INSTALL ALL REQUIRED SPRINKLERS PER NFPA 13R SUPPLY AND INSTALL ALL REQUIRED BELLS, TAMPERS AND FLOW SWITCHES PER NFPA 13R · contractor: B M CONSULTING SERVICES INC
- Issued Jan 13, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-008015 · contractor: V&V Investment Inc
- Issued Jan 13, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-008015 · contractor: JAMES CIERVO
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008027 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008028 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008015 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008029 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008023 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008021 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008017 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-007991 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008016 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008026 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008024 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008022 · contractor: DOUGHERTY ELECTRIC INC
- Issued Dec 13, 2025
Permit issued — New Construction
Electrical Permit for combo RP-2025-008019 · contractor: DOUGHERTY ELECTRIC INC
- Issued Sep 23, 2025
Permit issued — New Construction
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. COMPLETED BY AN APPROVED PARTY. NO EXCAVATION BELOW 5 FT PROPOSED WITH HELICLE PIERS. · contractor: V&V Investment Inc · 1 units
- Issued Sep 23, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. COMPLETED BY AN APPROVED PARTY. NO EXCAVATION BELOW 5 FT PROPOSED WITH HELICLE PIERS. · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. COMPLETED BY AN APPROVED PARTY. NO EXCAVATION BELOW 5 FT PROPOSED WITH HELICLE PIERS. · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. COMPLETED BY AN APPROVED PARTY. NO EXCAVATION BELOW 5 FT PROPOSED WITH HELICLE PIERS. · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. COMPLETED BY AN APPROVED PARTY. NO EXCAVATION BELOW 5 FT PROPOSED WITH HELICLE PIERS. · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. COMPLETED BY AN APPROVED PARTY. NO EXCAVATION BELOW 5 FT PROPOSED WITH HELICLE PIERS. · contractor: V&V Investment Inc · 1 units
- Issued Sep 19, 2025
Permit issued — New Construction
**AMENDED-PERMIT 6/8/2026 - CHANGES TO PARTITION & EXTERIOR WALL SCHEDULE, INCLUDING NEW NON-BEARING WALL ASSEMBLY TESTED BY INTERTECK IN ACCORDANCE WITH ASTM E119 WITH MATERIALS TO MATCH GP/WA 120-05 DETAIL. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. NO UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE W · contractor: V&V Investment Inc · 1 units
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Issued Jul 24, 2025
Permit issued — New construction, addition, GFA change
For the erection of an attached structure that includes a full basement,a recess balcony at the second floor, a roof deck with a pilot house, and an accessory surface parking space accessed by a shared driveway. Size and location per plans. · contractor: KEVIN O'NEILL
- Recorded Jul 21, 2025
$1.25M
Sold to PURE PROPERTIES CONSTRUCTION & MANAGEMENT LLC
from FOY JAMES TR;DUFF SHAWN TR;ELECTRICAL WORKERS JOINT APPRENTICESHIP AND TRAINING TRUST FUND;ELECTRICAL WORKERS JOINT APPRENTICESHIP REALTY INC · 3 parcels
Nearby on the record
Other addresses in 19148 with recent activity on the public record.
The 19148 dashboard →The Whitman dashboard →Every recent record in 19148 →
Track this parcel
We'll flag the next deed, permit, or violation on the record here — usually before the neighbors do.
Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file May 14, 2026. Verify independently before relying on it.