THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

City File · The Public Record

File No. 2326-N-16TH-ST

2326 N 16th St

Neighborhood
Stanton
Records on file
7
First filed Sep 15, 2025Last activity Jun 9, 2026

On the record

Distress signals the city holds against this parcel — back taxes, open code violations, and unsafe designations.

Clear

No open violations or delinquencies on record for this address.

The docket

7 entries

  1. Issued Jun 9, 2026

    Permit issued — New Construction

    INSTALL 400 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN, INSTALL A FIRE ALARM ALL WORK PER APPROVED PLANS NEC 2017. · contractor: City Lights electric llc

  2. Issued May 30, 2026

    Permit issued — New Construction

    FOR THE INSTALLATION OF A 2-INCH FIRE SERVICE LINE FOR AN AUTOMATIC FIRE SUPPRESSION SPRINKLER SYSTEM WITH A BACKFLOW PREVENTION ASSEMBLY IN ACCORDANCE WITH NFPA 13R. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. · contractor: Michael J Mccullough jr

  3. Issued May 4, 2026

    Permit issued — New Construction

    FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. · contractor: Oris-Hvac Inc

  4. Issued Apr 21, 2026

    Permit issued — New Construction or Additions

    Installing 1" Water Service, 5" Curb Trap, 4" Mai Drain, 4" Fresh air inlet Installing 29 Fixtures 3 HWH 7 Lavs 7 Toilets 3 KS 3 Washers 6 Shower/tubs · contractor: THOMAS UHL

  5. Issued Oct 30, 2025

    Permit issued — Excavation

    Site / Utility Permit for CP-2025-005092 · contractor: Campos Enterprises LLC

  6. Issued Oct 30, 2025

    Permit issued — New Construction

    NEW CONSTRUCTION OF A THREE (3) STORY, THREE (3) FAMILY DWELLING WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK. *2018 IBC REVIEW* · contractor: City Lights electric llc · 3 units

  7. Issued Sep 15, 2025

    Permit issued — New construction, addition, GFA change

    APPLICATION IS FOR A NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH A ROOF DECK AND A ROOF ACCESS STRUCTURE (SIZE AND LOCATION AS SHOWN ON PLANS/APPLICATION) · contractor: KCA Design Associates LLC

Nearby on the record

Other addresses in 19132 with recent activity on the public record.

The 19132 dashboard →The Stanton dashboard →Every recent record in 19132

Track this parcel

We'll flag the next deed, permit, or violation on the record here — usually before the neighbors do.

Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file June 9, 2026. Verify independently before relying on it.