- Violation Jul 10, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Jul 10, 2025OPEN
RECORDS
- Violation Jul 10, 2025OPEN
HIGH-RISE BUILDING
The docket
25 entries
- Issued Oct 22, 2026
Permit issued — Addition and/or Alterations
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (33) SPRINKLER HEADS ON THE 2nd & 4th FLOOR · contractor: A & S SPRINKLER CO INC
- Issued Oct 22, 2026
Permit issued — Addition and/or Alterations
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (146) SPRINKLER HEADS, PER NFPA 13 · contractor: A & S SPRINKLER CO INC
- Issued Oct 20, 2026
Permit issued — Addition and/or Alterations
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. THIS APPLICATION WAS REVIEWED UNDER THE 2021 IMC. · contractor: HUNTER MECHANICAL INC
- Issued Oct 20, 2026
Permit issued — Addition and/or Alterations
FOR AN ALTERATION TO AN EXISTING MECHANICAL SYSTEM TO ACCOMMODATE THE 12TH FLOOR OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **IMC 2021** · contractor: LOR-MAR MECHANICAL SERVICES LLC
- Issued Oct 9, 2026
Permit issued — Addition and/or Alteration
Install fire alarm devices as per approved drawings NEC 2017 NFPA 2016 · contractor: HATZEL & BUEHLER INC
- Issued Oct 8, 2026
Permit issued — Alterations
- Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing · contractor: TKELLY INC
- Issued Oct 7, 2026
Permit issued — Addition and/or Alteration
FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO THE LEVEL 4 & 5 OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK** · contractor: STRUCTURE TONE LLC · 1 units
- Issued Sep 28, 2026
Permit issued — Addition and/or Alteration
Furnish and install fire alarm as per approved plans NEC 2020 NFPA 2019 · contractor: SHORELINE ELECTRIC INC
- Issued Sep 17, 2026
Permit issued — Addition and/or Alterations
FOR THE INSTALLATION OF NEW SPRINKLER HEADS WITHIN AN EXISTING FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT SUITE 102 WITH EXISTING FIRE SERVICE AND BACKFLOW PREVENTION ASSEMBLY. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: Oliver Sprinkler Co., Inc.
- Issued Sep 15, 2026
Permit issued — Addition and/or Alteration
FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF THE 2ND AND 4TH FLOOR LEVEL OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2021**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK** · contractor: TOTAL CONSTRUCTION INC · 3 units
- Issued Sep 11, 2026
Permit issued — Alterations
- Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing. · contractor: TKELLY INC
- Issued Sep 9, 2026
Permit issued — Addition and/or Alteration
Furnish and Install 43 duplex, 15 quad outlets, 6 USB outlets, 7 wall furniture feeds, 4 floor cores, 22 ring and string, 1 hot water heater, 1 AC unit, 24 L1.6, 4 L2.15, 6 L2.20, 2 L3, 2 L4.6, 1 L4.38, 2 L5, 9 L6, 1 L7, 1 L8, 6 L9, 12 ceiling motions, 17 wall motions, relocate existing panel to new location per drawing. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **Fire Alarm to be on separate permit** · contractor: SHORELINE ELECTRIC INC
- Issued Sep 2, 2026
Permit issued — Addition and/or Alterations
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. · contractor: LOR-MAR MECHANICAL SERVICES LLC
- Issued Aug 17, 2026
Permit issued — Alterations
Furnish and install (12) new plumbing fixtures, (1) grease trap, (1) water heater, (1) water closet, (1) lavatory, (1) mop receptor, (2) hand sinks, (1) kitchen sink, (2) floor sinks, (1) sewage ejector and (1) floor drain, with piping, as per plans. · contractor: TKELLY INC
- Issued Jul 16, 2026
Permit issued — Addition and/or Alteration
Install power, receptacles, lighting as per approved drawings -2017 nec. **NO FIRE ALARM ON THIS PERMIT** -NOTED: TAMPER RESISTANT RECEPTS AS SHOWN ON DRAWINGS- · contractor: HATZEL & BUEHLER INC
- Issued Jul 15, 2026
Permit issued — Addition and/or Alterations
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: LOR-MAR MECHANICAL SERVICES LLC
- Issued Jun 30, 2026
Permit issued — Addition and/or Alterations
EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (23) sprinklers in Suite 610 to accommodate interior alterations · contractor: Oliver Sprinkler Co., Inc.
- Issued Jun 11, 2026
Permit issued — Addition and/or Alteration
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING 12TH FLOOR OFFICE SPACE (SUITE 1200) IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2021 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** · contractor: TOTAL CONSTRUCTION INC · 1 units
- Issued Jun 8, 2026
Permit issued — Addition and/or Alteration
FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. · contractor: TORINO INC · 1 units
- Issued May 28, 2026
Permit issued — Addition and/or Alteration
Furnish and install 25 duplex, 13 quads, 5 GFI, 1 floor core, 15 L-1, 5 L-2, 8 L-3, 5 L-4, 2 L-5, 3 exit signs, 4 emergency heads and 10 wall motions Install 1 100 amp panel as per 2017 NEC. Install fire alarm devices as per drawings and 2016 NFPA 72. · contractor: SHORELINE ELECTRIC INC
- Issued May 27, 2026
Permit issued — Alterations
Furnish and install (1) kitchen sink, connecting to existing piping. · contractor: TKELLY INC
- Issued Apr 16, 2026
Permit issued — Addition and/or Alteration
Furnish and install fire alarm as per drawings, 2 duplex, 2 GFI's, 4 dedicated, 2 wall feeds, 2 floor cores, 1 L-1, 2 L-2, 5 L-3, 27 feet of L-4, 2 exits and 3 ceiling motions . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. · contractor: SHORELINE ELECTRIC INC
- Issued Apr 15, 2026
Permit issued — Addition and/or Alteration
FOR LEVEL II ALTERATIONS TO AN EXISTING 6TH FLOOR TENANT SPACE (610). ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. FOR USE AS A PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. *******************************SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **************************************** · contractor: TORINO INC · 1 units
- Issued Jan 7, 2026
Permit issued — Addition and/or Alteration
FOR A LEVEL II ALTERATIONS TO EXISTING TENANT SPACES ON THE 2RD & 12TH FLOOR LEVEL OF AN EXISTING STRUCTURE. BUILDING IS FULLY SPRINKLERED. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.** · contractor: TORINO INC · 2 units
- Issued Nov 24, 2025
Permit issued — EZ Interior Non-Load-Bearing Wall Demo.
EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of fou
Nearby on the record
Other addresses in 19106 with recent activity on the public record.
The 19106 dashboard →The Old City dashboard →Every recent record in 19106 →
Track this parcel
We'll flag the next deed, permit, or violation on the record here — including any sheriff-sale filing — usually before the neighbors know.
Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file October 22, 2026. Verify independently before relying on it.