THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

City File · The Public Record

File No. 5500-HAVERFORD-AVE

5500 Haverford Ave

Neighborhood
Haddington
Records on file
8
First filed Aug 8, 2025Last activity May 18, 2026

On the record

Distress signals the city holds against this parcel — back taxes, open code violations, and unsafe designations.

Clear

No open violations or delinquencies on record for this address.

The docket

8 entries

  1. Issued May 18, 2026

    Permit issued — New Construction

    INSTALL 1200 AMP SERVICE WITH GROUNDING. INSTALL LIGHTING, RECEPTACLES, SMOKE/CO ALARMS, FIRE PUMP WIRING, TELECOMMUNICATIONS WIRING, AND PROVIDE POWER TO EQUIPMENT AS PER 2017 NEC. INSTALL FIRE ALARM AS PER 2016 NFPA 72. · contractor: Madden Electric Associates, Inc

  2. Issued Apr 14, 2026

    Permit issued — New Construction

    TO INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH 4" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY AND FIRE SYSTEM TO INCLUDE FIRE PUMP IN ACCORDANCE WITH NFPA 20 AND THE INSTALLATION OF TWO (2) STANDPIPES IN EXIT STAIRWAYS, STANDPIPES TO BE INTERCONNECTED PER NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. · contractor: MK FIRE PROTECTION & SUPPLY, LLC

  3. Issued Apr 3, 2026

    Permit issued — New Construction or Additions

    All sanitary,storm and domestic water piping to a point of 5 feet ouside of building.All fixtures and piping to include 44-WC, 44-Lavatory, 21- bath tubs, 12 SHW, 35 Kitchen Sinks, 33-Washer Boxes, 40-EWH, 1-SP-1, 1-SP-2, 36 FD, 1- Area Drain, 6- Wall Hydrant, 2 Hose bib, 4 Mop receptors, 1-drinking fountain · contractor: BBJ MECHANICAL INC

  4. Issued Mar 12, 2026

    Permit issued — New Construction or Additions

    INSTALL SANITARY AND STORM CT's, FAI's, MD's & 2" WDP. · contractor: CARSO CONSTRUCTION LLC

  5. Issued Mar 10, 2026

    Permit issued — New Construction

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 04/08/2026: TO RELOCATE CONDENSERS FROM SIDE OF THE BUILDING TO THE ROOF PER AMENDED PLANS. · contractor: Total Comfort Solutions

  6. Issued Feb 11, 2026

    Permit issued — New Construction

    200 Amp Temporary Service for construction site. All work to be done according to the 2017 NEC. · contractor: Madden Electric Associates, Inc

  7. Issued Jan 12, 2026

    Permit issued — Excavation

    Site / Utility Permit for CP-2025-001526 · contractor: ATHENA CONTRACTING INC

  8. Issued Aug 8, 2025

    Permit issued — New Construction

    NEW CONSTRUCTION OF A FOUR (4) STORY, FOR USE AS THIRTY THREE (33) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 MINIMUM (EXTERIOR WALL OPENINGS). SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IBC* *FINAL HELICAL PILE DESIGN MUST BE SUBMITTED THROUGH AN AMENDMENT (DEFERRED SUBMISSION)* AMENDMENT 12/28/2025 TO SUBMIT FINAL HELICAL PILE DESIGN. · contractor: Domus, Inc. · 1 units

Nearby on the record

Other addresses in 19139 with recent activity on the public record.

The 19139 dashboard →The Haddington dashboard →Every recent record in 19139

Track this parcel

We'll flag the next deed, permit, or violation on the record here — usually before the neighbors do.

Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file May 18, 2026. Verify independently before relying on it.