THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

City File · The Public Record

File No. 650-FAIRMOUNT-AVE-APT-I5

650 Fairmount Ave Apt I5

Records on file
5
First filed Jan 16, 2026Last activity Jun 12, 2026

On the record

Distress signals the city holds against this parcel — back taxes, open code violations, and unsafe designations.

Clear

No open violations or delinquencies on record for this address.

The docket

5 entries

  1. Issued Jun 12, 2026

    Permit issued — New Construction

    INSTALL New Panels, METER BANK, New switches, new wiring , new devices ,110V interconnected smoke/Co alarms ,fire alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC,2016 NFPA-72. · contractor: Arber Sulaj

  2. Issued May 22, 2026

    Permit issued — New Construction

    Install new service ,New meters, panels ,outlets , switches and lights ,smoke/Co alarms ,em.lighting ,fire alarm throughout per APPROVED DRAWINGS-2017 NEC . · contractor: Arber Sulaj

  3. Issued May 15, 2026

    Permit issued — New Construction

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: Bedri Allaraj

  4. Issued May 13, 2026

    Permit issued — New Construction

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: Bedri Allaraj

  5. Issued Jan 16, 2026

    Permit issued — New Construction

    Install new electrical services, meters, and circuit breaker panels with proper grounding and bonding. Install generators with automatic transfer switches (ATS) to provide emergency power. Provide feeders and subpanels to serve commercial spaces, common areas, electric vehicle chargers, and dwelling units. Install lighting, switches, lighting controls, exit signs, emergency lighting, receptacle outlets, and telecommunication wiring. Install smoke and carbon monoxide alarms. Install a complete fi · contractor: Arber Sulaj

Track this parcel

We'll flag the next deed, permit, or violation on the record here — usually before the neighbors do.

Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file June 12, 2026. Verify independently before relying on it.