THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

City File · The Public Record

File No. 8500-ESSINGTON-AVE

8500 Essington Ave

Neighborhood
Airport
Records on file
138
First filed May 8, 2025Last activity Jul 8, 2026

On the record

Distress signals the city holds against this parcel — back taxes, open code violations, and unsafe designations.

5 violations on file

  • Violation May 8, 2026OPEN

    UNAPPROVED ALTERNATIVE MATERIALS

  • Violation May 8, 2025OPEN

    HIGH-RISE BUILDING

  • Violation May 8, 2025OPEN

    RENTAL LICENSE- HOTEL (R1)

  • Violation May 8, 2025OPEN

    FOOD - LARGE ESTABLISHMENT LICENSE

  • Violation May 8, 2025OPEN

    SUPPRESSION SYSTEM TESTING & MAINTENANCE

The docket

133 entries

  1. Issued Jul 8, 2026

    Permit issued — Addition and/or Alteration

    FOR THE REMOVAL OF EXISTING ROOF-MOUNTED LIGHTING AND INSTALLATION OF NEW LIGH POLES AT GROUND LEVEL. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: HAINES & KIBBLEHOUSE INC · 1 units

  2. Issued Jun 23, 2026

    Permit issued — Addition and/or Alteration

    Install fire alarm devices on existing fire alarm system. PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. · contractor: WHITEMARSH ELECTRICAL CONSTRUCION INC

  3. Issued Jun 17, 2026

    Permit issued — New construction, addition, GFA change

    FOR THE ERECTION OF TWENTY-SEVEN (27) LIGHT STRUCTURES. SIZE AND LOCATION AS SHOWN IN PLANS. · contractor: ATKINSREALIS USA INC

  4. Issued Jun 4, 2026

    Permit issued — Sign

    FOR THE REFACING OF EXISTING SIGNS; ONE(1) FLAT WALL SIGN AND ONE (1) PROJECTING SIGN **WORK TO BE COMPLETED PER APPROVED PLANS**

  5. Issued Jun 2, 2026

    Permit issued — General Earth Disturbance ONLY

    SITE WORK PERMIT FOR GENERAL EARTH DISTURBANCE ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK. · contractor: HAINES & KIBBLEHOUSE INC

  6. May 26, 2026 · license

    License — MRG Philadelphia II LLC (Penn's Landing)

    Food Establishment, Retail Permanent Location

  7. May 21, 2026 · license

    License — The Grove/M2 JV, LLC (Dos Toros)

    Food Preparing and Serving

  8. Issued May 15, 2026

    Permit issued — Addition and/or Alteration

    Demo Only of Electrical Cabinets/ Electrical Remotes, Conduit, and Wire of AW and F Parking Garage Cell Sites · contractor: EAGLE I ELECTRIC INC

  9. Issued May 14, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (41) sprinklers in PHL RAE3 · contractor: Oliver Sprinkler Co., Inc.

  10. Issued May 8, 2026

    Permit issued — Addition and/or Alteration

    Install new conduit, explosion-proof fittings, and wiring to support the installation of a 12,000-gallon underground gasoline storage tank and two (2) fuel dispensers, in accordance with the approved drawings. Work includes all required raceways, conductors, seals, terminations, grounding, and bonding necessary for a complete and code-compliant installation in a hazardous (classified) location. All work shall be performed in accordance with the 2017 NEC and per approved plans. · contractor: VICTOR ELECTRO INC

  11. May 7, 2026 · license

    License — MRG Philadelphia II, LLC (Starbucks)

    Food Preparing and Serving

  12. Issued May 6, 2026

    Permit issued — Addition and/or Alteration

    Install fire alarm devices and tie in to existing building fire alarm system.-2017 NEC. · contractor: GOLDSMITH ASSOCIATES INC

  13. Issued May 5, 2026

    Permit issued — Addition and/or Alteration

    Replacement of existing BBC and EBBC Switchgear in same location as existing. New lighting, Grounding, and Security cameras in the switchgear yard as per 2017 NEC. · contractor: PHILIPS BROTHERS ELECTRICAL

  14. Issued Apr 30, 2026

    Permit issued — Addition and/or Alteration

    FOR LOBBY RENOVATION TO A PORTION OF AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.** · contractor: LEOPARDO COMPANIES INC · 1 units

  15. Issued Apr 23, 2026

    Permit issued — Addition and/or Alteration

    Disconnect existing and re-feed (14) new RTU's @ E Concourse PHL. Upgrade Fire Alarm and wire new Duct Detectors and Shut Down Relays . all work per approved plans. MP-2025-001869 · contractor: EAGLE I ELECTRIC INC

  16. Apr 22, 2026 · license

    License — The Grove/M2 JV, LLC (Pretzels & Pints)

    Food Preparing and Serving (30+ SEATS)

  17. Issued Apr 21, 2026

    Permit issued — Addition and/or Alteration

    Furnish and install fire alarm for new pretzel and pints space in Terminal A East at PHL Airport as per 2016 NFPA 72. · contractor: EAGLE I ELECTRIC INC

  18. Issued Apr 21, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (11) sprinklers in PHL B-C Connector space BC/27-AB · contractor: Oliver Sprinkler Co., Inc.

  19. Issued Apr 15, 2026

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2026-000245 · contractor: WHITEMARSH ELECTRICAL CONSTRUCION INC

  20. Issued Apr 15, 2026

    Permit issued — Addition and/or Alterations

    EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 8 gallon kitchen fire suppression system, per UL 300 · contractor: Joseph F Spaeder

  21. Issued Apr 15, 2026

    Permit issued — Addition and/or Alterations

    EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 12 gallon kitchen fire suppression system, per UL 300 · contractor: Joseph F Spaeder

  22. Issued Apr 6, 2026

    Permit issued — Alterations

    Plumbing Permit (Interior) for combo CP-2026-000245 · contractor: DWD MECHANICAL CONTRACTOR INC

  23. Issued Apr 6, 2026

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2026-000245 · contractor: DWD MECHANICAL CONTRACTOR INC

  24. Issued Mar 25, 2026

    Permit issued — Addition and/or Alteration

    LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING STRUCTURE (B-C Connector, Space BC/27-AB (Lafayette’s)) IN TERMINAL B OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS FOR PARTIAL DEMOLITION AND INTERIOR RENOVATIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED · contractor: RUSS KELLY & ASSOCIATES, INC. · 1 units

  25. Issued Mar 20, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (39) sprinkler heads for Escape Lounge tenant fit-out · contractor: Oliver Sprinkler Co., Inc.

  26. Issued Mar 19, 2026

    Permit issued — Alterations

    Installation of one (1) dish table, one (1) 3 compartment sink, one (1) 1 compartment prep sink, two (2) hand sinks, six (6) floor sinks, one (1) dump sink, one (1) mop sink, one (1) water closet, one (1) lavatory and one (1) hot water heater with associated piping for all. · contractor: MWI Mechanical, Inc.

  27. Issued Mar 18, 2026

    Permit issued — Addition and/or Alteration

    Disconnect & remove the existing disconnects and starters from the Mechanical and HVAC equipment. Install new Feeders to the mechanical-supplied disconnects, VFDs, and equipment. Disconnect existing Duct Detectors and install new Duct Detectors on the latest HVAC equipment. Remove existing Lighting fixtures & replace with new Lighting fixtures. All work in accordance with NEC & NFPA. All work Per approved plans · contractor: Carr and Duff LLC

  28. Issued Mar 12, 2026

    Permit issued — New construction, addition, GFA change

    FOR ADDITIONS TO TERMINALS (D) & (E) AND ASSOCIATED SITE WORK TO AN EXISTING STRUCTURE FOR USE AS PART OF THE PHILADELPHIA INTERNATIONAL AIRPORT; SIZE AND LOCATION AS PER APPLICATION/PLAN. · contractor: AECOM TECHNICAL SERVICES INC

  29. Issued Mar 11, 2026

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2026-000612 · contractor: MWI Mechanical, Inc.

  30. Mar 9, 2026 · license

    License — American Airlines, Inc.

    Food Preparing and Serving (30+ SEATS)

  31. Issued Mar 6, 2026

    Permit issued — Addition and/or Alteration

    Install electrical panels and associated feeders to serve the space. Provide lighting fixtures, branch circuit wiring, and wiring devices including receptacles and switches. Install electrical connections for kitchen equipment and HVAC units. Furnish and install data cabling and communication jacks. All work shall be performed in accordance with the 2017 NEC and per approved plans. Amendment: Install Fire Alarm devices and associated conduit and wiring. Connect to existing building fire alarm · contractor: GOLDSMITH ASSOCIATES INC

  32. Issued Mar 6, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (7) sprinkler heads in space BC29B · contractor: Oliver Sprinkler Co., Inc.

  33. Issued Mar 4, 2026

    Permit issued — Addition and/or Alteration

    Fitout for new tenant (Sunglass Hut) to space-alteration to existing electrical system, including but not limited to new lighting fixtures to ceiling, display cases · contractor: GOLDSMITH ASSOCIATES INC

  34. Issued Mar 4, 2026

    Permit issued — Addition and/or Alteration

    FOR A LEVEL II INTERIOR ALTERATIONS TOINCLUDE A TENANT FIT-OUT TO A PORTION OF THE EXISTING AIRPORT TERMINAL. FOR A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: EINSTEIN CONSTRUCTION GROUP LLC · 1 units

  35. Issued Mar 3, 2026

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2026-001063 · contractor: EAGLE I ELECTRIC INC

  36. Issued Mar 3, 2026

    Permit issued — Addition and/or Alteration

    FOR AN ALTERATION TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.** · contractor: EAGLE I ELECTRIC INC · 1 units

  37. Issued Feb 27, 2026

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK TO ACCOMMODATE A NEW TENANT AT THE AIRPORT . APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ** · contractor: DWD MECHANICAL CONTRACTOR INC

  38. Issued Feb 18, 2026

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-005421 · contractor: H&W MECHANICAL SERVICES LLC

  39. Issued Feb 13, 2026

    Permit issued — Addition and/or Alteration

    FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY CLASSIFICATION. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK. · contractor: VRH CONSTRUCTION CORP. · 1 units

  40. Issued Feb 12, 2026

    Permit issued — Addition and/or Alterations

    FOR TA MECHANICAL SYSTEM UPGRADE TO AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ** · contractor: DOLAN MECHANICAL INC

  41. Issued Feb 10, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (9) sprinkler heads to accommodate alterations to Space BC7 · contractor: Oliver Sprinkler Co., Inc.

  42. Issued Feb 10, 2026

    Permit issued — Addition and/or Alterations

    FOR ALTERATIONS TO AN EXISTING AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL HEADS THROUGHOUT RENOVATED BATHROOMS (RD5, RB2, RC1, and RF6) AS PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13. SEE CP-2023-002079 FOR ASSOCIATED BUILDING PERMIT. · contractor: Oliver Sprinkler Co., Inc.

  43. Issued Feb 9, 2026

    Permit issued — Change of Use

    Eating and Drinking Establishments - Sit-Down Restaurant · contractor: Nicholas Antico

  44. Issued Feb 9, 2026

    Permit issued — Rough-In

    Rough-In Permit for FP-2026-000164 Install (125) sprinklers to accommodate renovations to restrooms RD5, RB2, RC1, and RF6; new sprinklers will be tied into existing systems and backflow preventers · contractor: Oliver Sprinkler Co., Inc.

  45. Issued Feb 6, 2026

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.* NO BUILDIGN ALTERATIONS/NO PARENT PERMIT ASSOCIATED WITH THIS PERMIT * · contractor: Surety Mechanical Services Inc

  46. Issued Feb 3, 2026

    Permit issued — Addition and/or Alterations

    EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install pre-engineered, wet chemical kitchen fire suppression system into kitchen hood at Paris Baguette. System type: CAS TANK 4/4 (8 gal system). · contractor: ATLANTIC FIRE EQUIPMENT CO INC

  47. Issued Jan 31, 2026

    Permit issued — Alterations

    FOR THE INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPING FOR CONVEYANCE AND SUPPLY FOR COMMERCIAL SPACE SHALL BE METALLIC TO ROOF EXTENSION. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. · contractor: MWI Mechanical, Inc.

  48. Issued Jan 30, 2026

    Permit issued — Addition and/or Alteration

    FOR A LEVEL II INERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. FOR A NEW TENANT FIT-OUT AT THE AIRPORT. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**MECHANICAL WORK TO BE PROVIDED PER APPROVED PLANS ** ELLECTRICAL REVIEW TO INCLUDE INSTALLATION OF NEW W · contractor: INTECH CONSTRUCTION LLC · 1 units

  49. Issued Jan 30, 2026

    Permit issued — Addition and/or Alteration

    FOR THE INSTALLATION OF NEW WIRING, TELECOMMUNICATIONS WIRING, EMERGENCY LIGHTING, LIGHTING, JUNCTION BOX, RECEPTACLES AND OUTLETS. Amended 3/13/26 Add Fire Alarm Devices to restaurant space. Wiring to connect to the existing airport system. ALL WORK PER APPROVED PLANS · contractor: GOLDSMITH ASSOCIATES INC

  50. Issued Jan 20, 2026

    Permit issued — Addition and/or Alterations

    TO REMOVE AND REPLACE 40 FT. RADIANT TUBE HEATER AND TIE IT INTO EXISTING GAS LINE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. · contractor: R. BROOKS MECHANICAL HEATING AND AIR CONDITIONING, LLC

  51. Issued Jan 15, 2026

    Permit issued — Addition and/or Alteration

    RELOCATE POWER, DATA installation. Fire alarm Installation in accordance with NFPA 72 & The Philadelphia Fire code 2018 · contractor: ARMOUR & SONS ELECTRIC INC

  52. Issued Jan 15, 2026

    Permit issued — Addition and/or Alteration

    Grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, AC ductless split systems, lighting, lighting controls, smart glass tinting controls, existing fire alarm system to remain, disconnect and reconnect fire alarm pull stations. · contractor: MULHERN ELECTRIC CO., INC.

  53. Issued Jan 13, 2026

    Permit issued — Addition and/or Alteration

    Furnish & Install upgrade to PHL Video Security Surveillance System, network hardware and cable, CCTV cameras, power wire, CAT6, and fiber throughout Terminals D & E as per 2017 NEC. · contractor: EAGLE I ELECTRIC INC

  54. Issued Jan 13, 2026

    Permit issued — Addition and/or Alteration

    Replace existing electrical distribution panel with new 225A, 120/208Y distribution panel. Disconnect and remove wiring to existing HVAC equipment and replace with new branch circuit wiring to replacement equipment. Install branch circuit wiring to new equipment. All branch circuit wiring rated 120V, 240V or 208V up to 60A maximum. · contractor: E J ELECTRIC INC

  55. Issued Jan 12, 2026

    Permit issued — Addition and/or Alteration

    FOR LEVEL II INTERIOR ALTERATIONS TO EXISTING BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: J & J 2000 INC · 1 units

  56. Issued Jan 8, 2026

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (70) sprinklers to accommodate interior alterations · contractor: Oliver Sprinkler Co., Inc.

  57. Issued Jan 8, 2026

    Permit issued — Addition and/or Alteration

    INSTALL A DAMAGE DETECTION CAMERA SYSTEM AT BOTH THE CUSTOMER EXIT AND CUSTOMER ENTRANCE. THE SYSTEM CONSISTS OF AN ARCH WITH CAMERAS AND LIGHTS TO DETECT THE PRESENCE OF DAMAGE AND RELAY THE IMAGES TO HERTZ PERSONNEL. INSTALL RECEPTACLES, ETHERNET WIRING, AND PROVIDE POWER TO UV EYES AS PER 2017 NEC. SERVICE IS EXISTING. · contractor: LANE-VALENTE INDUSTRIES INC.

  58. Issued Jan 5, 2026

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-003902 · contractor: EAGLE I ELECTRIC INC

  59. Issued Dec 31, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (33) sprinklers to accommodate alterations to space AE-01 · contractor: Oliver Sprinkler Co., Inc.

  60. Issued Dec 30, 2025

    Permit issued — Addition and/or Alteration

    Provide new Electrical & Tele/Data Services to new Kiosk. All work to be done according to the 2017 NEC and per approved plans. · contractor: J.W. Carrigan

  61. Issued Dec 30, 2025

    Permit issued — Addition and/or Alteration

    Fire Alarm modifications for a Paris Baguette store in Philadelphia International Airport terminal C space 8. PER APPROVED DRAWINGS. · contractor: EAGLE I ELECTRIC INC

  62. Issued Dec 15, 2025

    Permit issued — Alterations

    Plumbing Permit (Interior) for combo CP-2025-003902 · contractor: MWI Mechanical, Inc.

  63. Issued Dec 15, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-003902 · contractor: MWI Mechanical, Inc.

  64. Issued Dec 12, 2025

    Permit issued — Addition and/or Alteration

    FOR A TENANT FIT-OUT TO AN EXISTING SPACE (SPACE AE-01) FOR A NEW VENDOR AT THE AIRPORT. ALTERATIONS TO INCLUDE THE SELECTIVE DEMOLITION OF EXISTING PARTITIONS AND THE NEW ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. MECHANICAL UPGRADE TO BE INCLUDED AS PART OF THE SCOPE OF WORK. PL · contractor: RUSS KELLY & ASSOCIATES, INC. · 1 units

  65. Issued Dec 12, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO EXISTING TSA STAFF AREA (GROUP B) LOCATED IN D/E CONNECTOR PRE-SECURITY AREA OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. · contractor: D LAURO & RODGERS INC · 1 units

  66. Issued Dec 2, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-003812 · contractor: MWI Mechanical, Inc.

  67. Issued Nov 19, 2025

    Permit issued — EZ Roof Covering Replacement

    EZ PERMIT RE-ROOFING- For the Installation of New Roof Coverings on Exiting Roofs as per attached standard. Deviations from these standards require submission of construction and site plans.

  68. Issued Nov 13, 2025

    Permit issued — Rough-In

    Rough-In Permit for EP-2025-010738 Grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, AC ductless split systems, lighting, lighting controls, smart glass tinting controls, existing fire alarm system to remain, disconnect and reconnect fire alarm pull stations. · contractor: MULHERN ELECTRIC CO., INC.

  69. Issued Nov 11, 2025

    Permit issued — Alterations

    domestic water piping with 1 water heater Sanitary piping with 2-grease traps,1-trench drain,19 floor sinks 9 floor drains and 1 hand sink · contractor: MWI Mechanical, Inc.

  70. Issued Nov 3, 2025

    Permit issued — Addition and/or Alteration

    THE MODIFICATION OF THE FIRE ALARM SYSTEM IN THE TENANT SPACE. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS. · contractor: EAGLE I ELECTRIC INC

  71. Issued Oct 30, 2025

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF TWO (2) TYPE I COMMERCIAL KITCHEN HOODS AND NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION. AMENDMENT 4/25/26 TO INCLUDE GAS PIPING. · contractor: H&W MECHANICAL SERVICES LLC

  72. Issued Oct 30, 2025

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-003811 amendment :Add fire alarm devices . · contractor: GOLDSMITH ASSOCIATES INC

  73. Oct 29, 2025 · license

    License — USO of PA & Southern NJ

    Food Preparing and Serving

  74. Oct 28, 2025 · license

    License — OLYMPIC SUPPLY INC

    Food Establishment, Retail Permanent Location

  75. Issued Oct 27, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (10) existing sprinkler heads for alterations to Starbucks, Terminal C, Space C-12-B · contractor: Oliver Sprinkler Co., Inc.

  76. Issued Oct 27, 2025

    Permit issued — Alterations

    Installation of the following fixtures with associated piping: · contractor: MWI Mechanical, Inc.

  77. Issued Oct 27, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-003811 · contractor: MWI Mechanical, Inc.

  78. Issued Oct 27, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (27) sprinklers to accommodate interior alterations to BC Connector space BC-17 A/B · contractor: Oliver Sprinkler Co., Inc.

  79. Issued Oct 24, 2025

    Permit issued — Addition and/or Alteration

    Installation of new 100 amp MLO panel, lighting and fixtures, outlets, receptacles, CCTV's, TV's, speakers, wireless access points, kiosks, and data rack with associated wiring and telecommunications wiring as per 2017 NEC. ***NOT APPROVED FOR THE INSTALLATION OF FIRE ALARM*** AMENDMENT: Install fire alarm devices on an existing fire alarm system as per 2016 NFPA 72. · contractor: GOLDSMITH ASSOCIATES INC

  80. Issued Oct 22, 2025

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-003814 · contractor: EAGLE I ELECTRIC INC

  81. Issued Oct 21, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (18) sprinklers to accommodate interior alterations to space C08 · contractor: Oliver Sprinkler Co., Inc.

  82. Issued Oct 21, 2025

    Permit issued — Addition and/or Alteration

    Electric panels, general lighting, emergency lighting, lighting controls, receptacles, Kitchen and HVAC equipment power wiring. Fire alarm system (conduit pathways for security, data, audio, video. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2018 PHILA FIRE CODE. · contractor: PALMAN ELECTRIC INC

  83. Issued Oct 20, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-003814 For the installation of fuel gas piping, GRDs and associated ductwork, and one (1) Type 1 commercial kitchen hood exhaust system as per approved plans and in accordance with 2018 IMC. Separate permits to be obtained for all other work. · contractor: PARADIGM MECHANICAL LLC

  84. Issued Oct 20, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP B EATING ESTABLISHMENT IN SPACE #C08 WITHIN PHILADELPHIA INTERNATIONAL AIRPORT TERMINAL C. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. · contractor: D LAURO & RODGERS INC · 1 units

  85. Issued Oct 20, 2025

    Permit issued — Addition and/or Alteration

    FOR INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE CONCRETE REPAIR. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: Quinn Construction, Inc. · 1 units

  86. Issued Oct 20, 2025

    Permit issued — Alterations

    Plumbing Permit (Interior) for combo CP-2025-003814 · contractor: Churchville Mechanical Inc

  87. Issued Oct 16, 2025

    Permit issued — Addition and/or Alteration

    LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING COFFEE SHOP IN SPACE C-12-B OF TERMINAL C OF AN EXISTING AIRPORT AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** · contractor: EINSTEIN CONSTRUCTION GROUP LLC · 1 units

  88. Issued Oct 14, 2025

    Permit issued — Addition and/or Alteration

    FOR THE REPLACEMENT OF CURTAIN WALL AT TERMINAL D-E AND ASSOCIATED CONNECTOR BRIDGES AS PER APPROVED PLANS. SPEARATE PERMITS REQUIRED FOR OTHER WORK. *2018 IBC* · contractor: DANIEL J. KEATING COMPANY · 1 units

  89. Issued Oct 13, 2025

    Permit issued — Addition and/or Alteration

    Upgrade and install electric lighting: recessed downlights, cylindrical downlight LED, linear direct/indirect LED as per 2017 NEC. · contractor: GREENTECH ENERGY SERVICES

  90. Issued Oct 8, 2025

    Permit issued — Addition and/or Alteration

    REPLACING THE MUFIDS MONITORS WITH NEW MONITORS AS PER 2017 NEC AND PER PLANS.. · contractor: ARMOUR & SONS ELECTRIC INC

  91. Issued Oct 7, 2025

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-003215 · contractor: EAGLE I ELECTRIC INC

  92. Issued Oct 7, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-003215 · contractor: KASER MECHANICAL LLC

  93. Issued Oct 7, 2025

    Permit issued — Addition and/or Alteration

    FOR A ROOF SYSTEM UPGRADE TO HOUSE NEW MECHANICAL EQUIPMENT PER APPROVED PLANS.**. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018** ELECTRICAL WORK TO INCLUDE THE INSTALLATION OF WIRING FOR REPLACEMENT AND ADDITION OF HVAC UNITS IN 13 TELECOM ROOMS THROUGHOUT. **ELECTRICAL AMENDMENT :ELECTRICAL DRAWINGS HAVE BEEN UPDATED TO REFLECT ONLY ROOMS BT2050, AT2029, AC1085, ET1072, DT1072, AND CC1008 WHICH ARE LOCA · contractor: KASER MECHANICAL LLC · 19 units

  94. Issued Sep 29, 2025

    Permit issued — Addition and/or Alterations

    FOR THE REMOVAL AND REPLACEMENT OF TWENTY-ONE (21) HVAC RTUs AT PHILADELPHIA INTERNATIONAL AIRPORT TERMINALS D AND E BAGGAGE CLAIM AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. · contractor: DOLAN MECHANICAL INC

  95. Issued Sep 24, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-001091 · contractor: ERNEST D MENOLD INC

  96. Issued Sep 23, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (46) sprinklers to accommodate alterations to Delta Sky Club · contractor: Oliver Sprinkler Co., Inc.

  97. Issued Sep 22, 2025

    Permit issued — Addition and/or Alteration

    FOR CHANGE OF OCCUPANCY AT SPACE E9 AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. · contractor: PENN ACOUSTICS INC · 1 units

  98. Issued Sep 22, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (15) sprinkler heads to accommodate alterations to space C-2, Insomnia Cookies · contractor: Oliver Sprinkler Co., Inc.

  99. Issued Sep 19, 2025

    Permit issued — Addition and/or Alteration

    Electrical panels, transformer & feeders, wiring devices, lights, HVAC & Kitchen equipment wiring, security system devices and wiring, communication devices & wiring. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC AMENDMENT: Install fire alarm. · contractor: GOLDSMITH ASSOCIATES INC

  100. Issued Sep 16, 2025

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-001091 · contractor: EAGLE I ELECTRIC INC

  101. Issued Sep 12, 2025

    Permit issued — Alterations

    Plumbing Permit (Interior) for combo CP-2025-001091 · contractor: Churchville Mechanical Inc

  102. Issued Sep 12, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (18) existing sprinkler heads to accommodate interior alterations to tenant space BC-3 · contractor: Oliver Sprinkler Co., Inc.

  103. Issued Sep 10, 2025

    Permit issued — Alterations

    Furnish and Install: Required Sanitary and Domestic Water Piping 5 Toilets 5 Lavatories 1 Floor Drain 1 Mop Receptor 1 Trap Primer 1 Domestic Recirc Pump 1 Electric Water Heater · contractor: DWD MECHANICAL CONTRACTOR INC

  104. Issued Sep 8, 2025

    Permit issued — General Earth Disturbance ONLY

    FOR A EARTH DISTURBANCE PERMIT PER APPROVED PLANS. · contractor: C ABBONIZIO CONTRACTORS INC

  105. Issued Sep 5, 2025

    Permit issued — Signs (Accessory / Non-Accessory)

    FOR THE INSTALLATION OF 123 DIRECTIONAL SIGNS. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS. · contractor: HDR ENGINEERING INC

  106. Issued Sep 5, 2025

    Permit issued — Addition and/or Alteration

    FOR A LEVEL II INTERIOR ALTERATION TO AN EXISTING SPACE C-2 LOCATED IN TERMINAL C (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. FOR USE AS EATING AND DRINKING ESTABLISHMENTS-TAKE-OUT-RESTAURANT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHAMICAL SYSTEM UPGRADE INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: D LAURO & RODGERS INC · 1 units

  107. Issued Aug 25, 2025

    Permit issued — Addition and/or Alteration

    Replacement of existing substations with new electrical substations in various electrical substations at Philadelphia Airport. Utilizing existing service feeders to new transformers, switchboards, panelboards, disconnect switches, and circuit breakers as per 2017 NEC. · contractor: EAGLE I ELECTRIC INC

  108. Issued Aug 22, 2025

    Permit issued — Addition and/or Alteration

    LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING RETAIL SPACE (SPACE BC-17 A/B) FOR NEW TENANT WITHIN EXISTING AIRPORT BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK** · contractor: EINSTEIN CONSTRUCTION GROUP LLC · 1 units

  109. Aug 21, 2025 · license

    License — Jackmont of Philadelphia, LLC (Middle Child)

    Food Preparing and Serving (30+ SEATS)

  110. Issued Aug 19, 2025

    Permit issued — Change of Use

    Eating and Drinking Establishments - Take-Out Restaurant; Eating and Drinking Establishments - Sit-Down Restaurant · contractor: Nicholas Antico

  111. Issued Aug 12, 2025

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. · contractor: DWD MECHANICAL CONTRACTOR INC

  112. Issued Aug 11, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS AN ASSEMBLY OCCUPANCY (A-2 RESTAURANT), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: VRH CONSTRUCTION CORP. · 1 units

  113. Issued Aug 11, 2025

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-003643 · contractor: EAGLE I ELECTRIC INC

  114. Issued Aug 8, 2025

    Permit issued — Alterations

    Plumbing Permit (Interior) for combo CP-2025-003643 · contractor: DWD MECHANICAL CONTRACTOR INC

  115. Issued Aug 6, 2025

    Permit issued — Addition and/or Alterations

    FOR THE INSTALLATION OF DUCTWORK AND REGISTER/DIFFUSER AS PER APPROVED PLANS. · contractor: PARADIGM MECHANICAL LLC

  116. Issued Aug 5, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (2) sprinkler heads for interior alterations in Cibo wine bar · contractor: Oliver Sprinkler Co., Inc.

  117. Issued Aug 5, 2025

    Permit issued — Addition and/or Alteration

    Replacement of 21 existing rooftop air-handling units at D-Ticketing and C-D Connector bridge, D-Hammerhead, and E-F Connector bridge, and replacement of existing equipment support at PHL International Airport. Project includes hydronic piping, controls, and structural support. · contractor: Surety Mechanical Services Inc · 21 units

  118. Issued Aug 5, 2025

    Permit issued — Addition and/or Alteration

    FOR ALTERATIONS TO THE PHILADELPHIA INTERNATIONAL AIRPORT ASSOCIATED WITH THE INSTALLATION/REPLACEMENT OF MECHANICAL AND PLUMBING SYSTEMS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** ASBESTOS REMEDIATION REQUIRED ** · contractor: Surety Mechanical Services Inc · 28 units

  119. Issued Aug 1, 2025

    Permit issued — Addition and/or Alteration

    FOR ALTERATIONS TO THE PHILADELPHIA INTERNATIONAL AIRPORT ASSOCIATED WITH THE INSTALLATION/REPLACEMENT OF UTILITY WORK FOR PHL-TERMINAL AE, SPACE AE01. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. · contractor: RUSS KELLY & ASSOCIATES, INC. · 1 units

  120. Issued Aug 1, 2025

    Permit issued — Addition and/or Alteration

    Removal and replacement of twenty-six (26) rooftop air handling units (RTUs) on the roof of the B/C Baggage Claim Building as well as four (4) chilled water pumps, two (2) heat exchangers, two (2) fan coil units, two (2) hot water supply pumps, two (2) unit heaters, and two (2) glycol circulation pumps in Mechanical Room #11 serving the hydronic system for the RTUs, including associated ancillary devices, power, and controls in Mechanical Room #11; BAS for all equipment, related and required ele · contractor: WESCOTT ELECTRIC COMPANY

  121. Issued Jul 31, 2025

    Permit issued — Addition and/or Alteration

    Electrical Permit for combo CP-2025-003466 - Installation of electrical and telecommunication wiring and devices with in a single tenant place not exceeding 2000 sqft. · contractor: GOLDSMITH ASSOCIATES INC

  122. Issued Jul 29, 2025

    Permit issued — Addition and/or Alteration

    INSTALL FIRE ALARM SYSTEM ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS. · contractor: EAGLE I ELECTRIC INC

  123. Issued Jul 25, 2025

    Permit issued — Change of Use

    Retail Sales - Food, Beverages, and Groceries; Retail Sales - Consumer Goods · contractor: Nicholas Antico

  124. Issued Jul 24, 2025

    Permit issued — Addition and/or Alteration

    Utilize existing core drills and provide a new floor box as shown on sheet E-003 Detail 5 "configuration B1". Provide (2) 1" conduits to the new floor box "A". Relocate existing power and date circuits shown. Provide a new floor box to match "configuration A" as shown on sheet E-003 Detail 4. Extend the existing power and data circuits to the new device. Provide new data cabling if the existing is short in length. Extend circuit "B-D/E-22A"-14,16 to the propsed L6-30R in configuration "A". Prepa · contractor: Lonnelectric LLC

  125. Issued Jul 23, 2025

    Permit issued — EZ Interior Non-Load-Bearing Wall Demo.

    EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Structural alteration or repair is expressly PROHIBITED under this permit. Prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of fou

  126. Issued Jul 18, 2025

    Permit issued — Addition and/or Alteration

    INSTALL WIRING, LIGHTING, SWITCHES, EXIT SIGN, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS. AMENDMENT: Add fire alarm devices and connect to existing building system.(On Site Travel Essentials) · contractor: GOLDSMITH ASSOCIATES INC

  127. Issued Jul 18, 2025

    Permit issued — Addition and/or Alterations

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (31) sprinkler heads, to accommodate interior alterations to BC Connector-Space BC01 · contractor: Oliver Sprinkler Co., Inc.

  128. Issued Jul 17, 2025

    Permit issued — Addition and/or Alterations

    Mechanical / Fuel Gas Permit for combo CP-2025-003084 · contractor: ELC HOLDING COMPANY

  129. Issued Jul 17, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC* · contractor: RUSS KELLY & ASSOCIATES, INC. · 1 units

  130. Issued Jul 16, 2025

    Permit issued — Addition and/or Alteration

    FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE LOCATED AT THE AIRPORT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **NEW MECHANICAL WORK TO BE INCLUDED AS PART OF THE PERMIT**ELECTRICAL WORK TO INCLUDE INSTALLATION OF NEW WIRING, LIGHTING, SWITCHES, EXIT SIGN, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS.**SEPARATE PERMITS TO BE OBT · contractor: D LAURO & RODGERS INC · 1 units

  131. Issued Jul 14, 2025

    Permit issued — Addition and/or Alteration

    Remove and replace existing roof top units and associated fire alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. · contractor: WESCOTT ELECTRIC COMPANY

  132. Jul 14, 2025 · license

    License — OTG MANAGEMENT PHL B, LLC (GERMANTOWN BIERGARTEN)

    Food Preparing and Serving (30+ SEATS)

  133. Issued Jul 10, 2025

    Permit issued — Change of Use

    Retail Sales - Consumer Goods · contractor: KENNETH J ACQUAVIVA

Nearby on the record

Other addresses in 19153 with recent activity on the public record.

The 19153 dashboard →The Airport dashboard →Every recent record in 19153

Track this parcel

We'll flag the next deed, permit, or violation on the record here — including any sheriff-sale filing — usually before the neighbors know.

Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file July 8, 2026. Verify independently before relying on it.