THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

ZIP File · The Public Record

Philadelphia metro

ZIP 19109

ZIP 19109: 8 permits in the last 12 months.

Neighborhoods Washington Square West

The numbers · last 12 months

Permits
8
New units
0
New licenses
0
Median sale
$0
Deal $ volume
$0
Violations
0
Tax-delinquent
0

Permit & deal figures cover the last 12 months; violations and tax delinquencies are the current standing. Business-license counts match the ZIP inside the licensed address (licenses carry no ZIP field of their own).

Recent permits

8 entries

Newest building permits — new construction, additions and alterations.

  1. Issued Jul 7, 2026

    123 S Broad St

    Alterations · Provide above and below floor DWV for gang bathrooms and three coffee pantries. New domestic water lines and water heaters.

  2. Issued Jun 23, 2026

    123 S Broad St

    Addition and/or Alteration · Provide and Install Data Cabling

  3. Issued May 21, 2026

    123 S Broad St

    Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (177) SPRINKLER HEADS, PER NFPA 13

  4. Issued May 19, 2026

    123 S Broad St

    Addition and/or Alteration · Tenant fit-out to include demo, installation of lighting fixtures/local controls; branch power including receptacles and poke-thrus; mechanical hook-ups; and distribution ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. AMENDMENT: Install fire alarm system per approved plans.

  5. Issued May 13, 2026

    123 S Broad St

    Rough-In · Rough-In Permit for EP-2026-004225 Tenant fit-out to include demo, installation of lighting fixtures/local controls; branch power including receptacles and poke-thrus; mechanical hook-ups; and service distribution per submitted stamped drawings. NOTE: This Permit will be amended at a later date to include contracted Fire Alarm scope once Siemens engineers complete project FA drawings.

  6. Issued Apr 23, 2026

    1 units

    123 S Broad St

    Addition and/or Alteration · FOR LEVEL II ALTERATIONS INTERIOR ALTERATION TO A PORTION OF THE 4TH & 5TH FLOOR LEVEL OF AND EXISTING STRUCTURE FOR USE AS A BUSINESS OCCUPANCY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **ASBESTOS REMEDIATION REQUIRED PRIOR TO RESUBMISSION**

  7. Issued Feb 12, 2026

    123 S Broad St

    Addition and/or Alteration · Exterior work only. Install receptacles, lighting, lighting control, power feeds. All work to be done according to the 2017 NEC and per approved plans.

  8. Issued Jan 9, 2026

    1 units

    123 S Broad St

    Addition and/or Alteration · FOR STRUCTURAL MODIFICATION TO INCREASE LOAD CAPACITY FOR INSTALLATION OF NEW EQUIPMENT.

Get the weekly pulse for 19109

Every deal, permit, and filing on this ground — one email a week, before the neighbors know.

Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies), keyed on the ZIP recorded with each parcel in our weekly ingest. Verify independently before relying on any figure.
Last generated July 15, 2026.