ZIP 19112: 78 permits, $245.07M in deals, 10 tax-delinquent parcels in the last 12 months.
Neighborhoods Navy Yard, Sharswood, Industrial
The numbers · last 12 months
- Permits
- 78
- New units
- 1
- New licenses
- 0
- Median sale
- $52M
- Deal $ volume
- $245.07M
- Violations
- 42
- Tax-delinquent
- 10
Permit & deal figures cover the last 12 months; violations and tax delinquencies are the current standing. Business-license counts match the ZIP inside the licensed address (licenses carry no ZIP field of their own).
Notable transfers
6 entries
The biggest recorded deeds on the public record in this ZIP, largest first.
- Recorded Jan 6, 2026
$52M
to NIECGORSKI JOEL TR;FOLEY RICHARD TR;ROBINSON JOHN TR;EASTERN ATLANTIC STATES REGIONAL COUNCIL OF CARPENTERS · 3 parcels
- Recorded Jul 23, 2025
$6.08M
to Commonwealth Charter Academy Charter School · 2 parcels
Recent permits
12 entries
Newest building permits — new construction, additions and alterations.
- Issued Jul 8, 2026
Addition and/or Alteration · Provide and install 462 Cat6a plenum cables at 175' average on 4th floor. Provide and install 28 Cat6a plenum cables at 150' average on 1st floor. All cabling will be installed per current NEC. No rescue systems work.
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (68) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 1, 2026
1 units
Addition and/or Alteration · FOR FITOUT OF 2ND AND 3RD FLOORS AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Jun 30, 2026
Addition and/or Alteration · Replace light fixtures, install new lighting controls, install new duplex receptacles, relocate furniture feeds, install floor boxes, rough in raceways for low-voltage cabling. All work per approved plans ***NO FIRE ALARM ON THIS PERMIT; SEPARATE PERMIT REQUIRED***
- Issued Jun 29, 2026
Addition and/or Alterations · FOR AN ALTERATION TO AN EXISTING NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13THROUGHOUT . WORK TO INCLUDE THE INSTALLATION OF NEW SPRINKLER HEADS TO BE TIED INTO THE EXISTING SYSTEM AS PER APPROVED PLANS. **ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. **
- Issued Jun 22, 2026
Addition and/or Alteration · Connect (1) new sign to existing sign circuit. No new wiring or building permit involved. GP-2026-000771
- Issued Jun 11, 2026
Major Demolition · COMPLETE DEMOLITION OF AN EXISTING DETACHED ONE STORY, MASONRY, CONCRETE AND STEEL INDUSTRIAL STRUCTURE BY MECHANICAL METHODS. FLOOR SLAB TO REMAIN AS PROPOSED, SEPARATE PERMIT REQUIRED WITH PWD STORMWATER APPROVAL IF SLAB TO BE REMOVED. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. SPECIAL INSPECTIONS TO BE PERFORMED BY PENNONI ASSOCIATES, INC.
- Issued Jun 5, 2026
Addition and/or Alterations · FOR A ECHANICAL SYSTEM UPGRADE TO ACCOMMODATE AN EXISTING STRUCTURE. WORK TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Jun 5, 2026
Alterations · Install 3- sinks to include necessary piping as per plans.
On the record — distress
Back taxes, sheriff-sale filings, and open code violations tied to parcels in 19112.
Tax-delinquent parcels
$544,447 owed
- 1 yr owed
$208,357
- 4 yrs owed
$151,898
- 4 yrs owed
$148,601
- 17 yrs owed
$11,831
- 11 yrs owed
$9,607
- 20 yrs owed
$4,547
- 20 yrs owed
$4,420
- 11 yrs owed
$2,145
- 10 yrs owed
$1,829
- 7 yrs owed
$1,210
Code violations & unsafe structures
- Violation Mar 2, 2026OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Mar 2, 2026OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Jan 12, 2026OPEN
BENCHMARKING LATE
- Violation Nov 12, 2025OPEN
PERIODIC TESTING
- Violation Nov 12, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Nov 12, 2025OPEN
PERIODIC TESTING
- Violation Nov 12, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Nov 12, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Nov 12, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Nov 12, 2025OPEN
INSPECTION, TESTING & MAINTENANCE
- Violation Nov 12, 2025OPEN
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Nov 12, 2025OPEN
PERIODIC TESTING
Get the weekly pulse for 19112
Every deal, permit, and filing on this ground — one email a week, before the neighbors know.
Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies), keyed on the ZIP recorded with each parcel in our weekly ingest. Verify independently before relying on any figure.
Last generated July 15, 2026.