THE INDEX: 64 17 · week of Jun 29permits soft, openings quiet, deal ledger quiet

The Philadelphia Index

Entity File · The Public Record

Company / LLC

Anmar Electrical Contractor INC

27 permits

Records on file
27

Built (as contractor)

27 entries

  1. Issued Jun 17, 2026

    1845 Walnut St

    Addition and/or Alteration · Provide Disconnections, Temporary light and power using on-site power source, Electrical Distribution Panels, Transformer, UPS, etc., Lights, Light Controls, Receptacles, HVAC/Mechanical Power Connections, and Low Voltage J-Box & Stub-Up's as per 2017 NEC. Fire Alarm will be an amendment to this permit. All fire alarm costs are part of this permit application. AMENDMENT: Provide new fire alarm devices and wiring and tie-in to existing system as per 2016 NFPA 72.

  2. Issued Jun 11, 2026

    3301 Solly Ave

    Addition and/or Alteration · Perform partial renovation of a laboratory suite located on the third floor of an educational building. Install one (1) 225-amp subpanel, including associated feeder, overcurrent protection, grounding, bonding, and terminations. Provide complete electrical distribution within the renovated area, including installation of wiring, lighting fixtures, lighting control systems, exit signs, and receptacle outlets. Install branch circuits to provide power for laboratory equipment and applianc

  3. Issued Jun 2, 2026

    615 Chestnut St

    Addition and/or Alteration · Provide miscellaneous safe off of existing circuitry. Provide temp light and power utilizing the existing power source. Rework existing electrical panels. Provide new UPS unit, electrical panels, and ATS unit. - Provide new light fixtures, controls, receptacles, floor boxes and switches. Provide power to HVAC equipment. Empty box and conduit stub-ups only for telecom as per 2017 NEC. Fire alarm work will be filed as an amendment to this permit.

  4. Issued Apr 30, 2026

    1735 Market St

    Addition and/or Alteration · Provide misc. Demolition, Temp. Light & Power from on-site power source, tie-in to Existing Panels, new Lights & Controls, Receptacles, Tele/Data - Empty Box & Stub-Up's, power to HVAC equipment, and empty box and stub-ups for Door Access as per 2017 NEC. AMENDMENT: Provide new fire alarm devices and wiring and tie into the existing system as per 2016 NFPA 72.

  5. Issued Feb 9, 2026

    2929 Arch St

    Addition and/or Alteration · Install disconnections, temporary light and power from on-site power source,. Rewire existing panels, new electric panel, new sub meters, Install light fixtures, lighting controls, switching, receptacles, devices, HVAC power connections, Per plans empty box and conduit stub-ups for telecom/AV/Security, Install new fire alarm devices tied into the existing building Fire alarm system. In accordance with NFPA 2016 & The Philadelphia Fire Code 2018

  6. Issued Jan 31, 2026

    11051 Academy Rd

    Addition and/or Alteration · Provide new 2500 amp service with grounding, feeding (2) 1200 amp service disconnects, electrical distribution system, lights, devices, exterior generator, nurse call system, telecom system, security system, jobsite temporary from on-site power source, and new complete fire alarm system. Provide meter center and load centers for 48 apartment units and associated wiring. All work to be done according to approved drawings, 2017 NEC, and 2016 NFPA-72.

  7. Issued Jan 28, 2026

    2639 S 58th St

    New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is

  8. Issued Jan 28, 2026

    2639 S 58th St

    New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles, site lighting fixtures and temporary light and power. Make final electrical connections at each modular unit. Provide new lights, devices, lighting control, power to HVAC equipment, tele-data wiring, new electrical house panels, access control, CCTV and intercom systems within community center. Within modular units, install new telecom wiring and jacks

  9. Issued Jan 28, 2026

    2639 S 58th St

    New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles, (3) EV Chargers and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment as per 2017 NEC. Provide new fire alarm work within building sprinkler room as shown on shop drawings and 20

  10. Issued Jan 16, 2026

    1835 Market St

    Addition and/or Alteration · Provide misc. demo of existing electrical equipment. Provide temporary light and power utilizing existing on-site power. Provide lighting, receptacles, switches, lighting control system poke-throughs, HVAC equipment power connections, relocation of existing panels, new meters, empty box and conduit stub-ups for telecom, security, and AV as per 2017 NEC. Fire Alarm work is part of this contract and drawings will be filed separately as a separate permit application or amendment to this permit.

  11. Issued Jan 12, 2026

    170 S Independence Mall W

    Addition and/or Alteration · Misc. demo of existing electrical work. Provide temporary light and power utilizing on-site power source. Provide new lights, lighting controls, receptacles, switches, floor outlets, furniture feeds, HVAC equipment power, new breakers in existing panels, new feeders to relocated panelboards, new E-MON D-MON meter, new 30KVA transformer, empty conduit stub-ups for telecom/AV locations, and new fire alarm devices tied-in to existing building system. All work to be done according to the 2017 NEC

  12. Issued Dec 17, 2025

    3601-51 Walnut St

    Addition and/or Alteration · Provide new power and lighting wiring for Grab and Go. Replace lighting throughout as one for one replacement utilizing existing wiring. Add new switch and pendant light in hotel rooms. Add new closet light in hotel rooms. Add new television receptacle in hotel rooms. Remove and Re-use existing device plates throughout. Add new fire alarm devices in Grab and Go, and in various hotel rooms. All work done in accordance APPROVED DRAWINGS -2017 NEC ,2016 NFPA-72.

  13. Issued Dec 17, 2025

    2639 S 58th St

    New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is by the modul

  14. Issued Dec 11, 2025

    1741 Frankford Ave

    Addition and/or Alteration · Provide replacement-in-kind common area light fixtures, apartment light fixtures, apartment GFCI receptacles, range hoods, and device plates. Provide new lighting control wiring and devices; new power to mechanical, fire protection, and plumbing equipment as shown; and new tele-data wiring within each apartment. Install new circuits and breakers in the apartments for heat pumps, 120V smoke detectors, and tele-data network boxes, and tie all new wiring into the existing load centers. Relocate exi

  15. Issued Dec 1, 2025

    2640-48 E Lehigh Ave

    New Construction · Provide new incoming electrical service, panels, load centers, meters, lights, receptacles, switches, lighting control, power to HVAC equipment, appliance connections, telecom wiring throughout, security, intercom and temporary light and power. Provide new fire alarm and two way communication systems. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.

  16. Issued Dec 1, 2025

    3000 Grays Ferry Ave

    New Construction · Provide power for generator. Install lighting, receptacles, site lighting, and power to equipment as per 2017 NEC. ***FIRE ALARM DRAWINGS WILL BE SUBMITTED UNDER A SEPARATE APPLICATION***

  17. Issued Nov 26, 2025

    1717 Arch St

    Addition and/or Alteration · Provide Demolition, Temporary Light & Power utilizing existing power, new circuits tied into existing panels, 1 new electrical panel and feeder, new Light Fixtures & Light Fixture Controls, Electrical Outlets, and Power for HVAC/Mechanical/Plumbing equipment as per 2017 NEC. Provide new Fire Alarm Devices and connect to Existing Fire Alarm System as per 2016 NFPA 72. Empty Box & Conduit for Tele/Data/AV/Security.

  18. Issued Nov 13, 2025

    508-32 Walnut St

    Addition and/or Alteration · Provide new fire alarm devices in existing office spaces Per plans, Mezzanine only In accordance with NFPA 2016 & The Philadelphia Fire Code 2018

  19. Issued Nov 13, 2025

    2301 Market St

    Addition and/or Alteration · INSTALL NEW FIRE ALARM DEVICES AND RELOCATE EXISTING FIRE ALARM DEVICES TO NEW LOCATION. CONNECT ALL DEVICES TO EXISTING FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.

  20. Issued Oct 22, 2025

    3151 Market St

    Addition and/or Alteration · Provide new transformer and panel fed from existing electrical distribution. Provide new branch circuits for exterior signage. Only clouded areas on the drawings are part of this scope of work. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. GP-2025-005950

  21. Issued Oct 17, 2025

    2301 Market St

    Addition and/or Alteration · Provide Disconnections / Demolition, Temporary Lights & Power utilizing existing power, Reuse & Rework Existing Panels. Provide new electrical panels, light fixtures, lighting controls, receptacles, power to HVAC equipment, Empty Box & EMT Conduit Stub-Up for Low Voltage equipment (wiring by others) as per 2017 NEC. Fire alarm work will be under a separate permit.

  22. Issued Oct 15, 2025

    2639 S 58th St

    New Construction · Provide new incoming electrical service to each modular unit existing load center. Provide new building exterior light fixtures, receptacles and site lighting fixtures. Make final electrical connections at each modular unit. Provide site temporary lighting and power. Within modular units, install new telecom wiring and jacks. Make final connections at HVAC equipment. Provide new fire alarm work within building sprinkler room as shown on shop drawings. All other work within modular units is

  23. Issued Sep 19, 2025

    2640-48 E Lehigh Ave

    New Construction · Provide a 320A single-phase 3W temporary service for a construction trailer as per 2017 NEC.

  24. Issued Aug 30, 2025

    2005 Market St

    Addition and/or Alteration · Provide new fire alarm devices and wiring in office space and tie-in to existing system as per 2016 NFPA 72.

  25. Issued Aug 28, 2025

    508-32 Walnut St

    Addition and/or Alteration · Provide Demolition, Temporary Light & Power utilizing existing power source, Tap Existing Panels / Circuits, provide new light fixtures, new Light Controls, New Electrical Receptacles, Power Connections to HVAC/Mechanical Equipment and Empty Boxes & Stub-Up Conduit for Tele/Data/TV. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **Fire Alarm will be issued under a separate application**

  26. Issued Aug 25, 2025

    2760 Martin Luther King Jr Dr

    Addition and/or Alteration · 1.Demo: Existing lighting, devices, & panels. 2- Temp lighting/power. 3- Use existing electrical panels 4- Install new lighting and controls. 5- Install new receptacles. 6- Empty box and string for T/D. 7- Maintain existing Fire Alarm. 8- Provide power for HVAC/Mechanical/Plumbing. INSTALLATION SHALL COMPLY WITH 2017 NEC.

  27. Issued Jul 28, 2025

    2005 Market St

    Addition and/or Alteration · Provide safe-off and disconnections. Provide temporary light and power utilizing existing power source. Provide new lights, switches, receptacles, and power to HVAC equipment utilizing existing panel. Provide empty boxes and conduit stub-ups for telecom and security. Installation shall comply with 2017 NEC.

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.