Entity File · The Public Record
Company / LLC
Baldwin Electrical Construction LLC
158 permits
- Records on file
- 158
Built (as contractor)
158 entries
- Issued Jun 16, 2026
New Construction · Install a new 600-amp, single-phase electrical service with a six (6) gang meter module, including service conductors, meter sockets, main disconnecting means, and proper grounding and bonding. Install one (1) 100-amp subpanel for the house and one (1) 125-amp subpanel for each of the five (5) dwelling units, including all required feeders, overcurrent protection, grounding, and terminations. Provide complete electrical distribution throughout the five (5) apartments and common areas, includ
- Issued Jun 16, 2026
Addition and/or Alteration · Install 400a, 1ph, 120/240v main service with grounding and 4-gang meter module. Install all new wiring throughout 3 apartments and common area. Install low voltage wiring for TV as per 2017 NEC. Install fire alarm system as per plans and 2016 NFPA 72.
- Issued Jun 16, 2026
New Construction · Install 400a, 1 ph main service with 4 gang meter module. Install all wiring throughout 3 apartments and common areas. Install fire alarm system as per plans. Install low voltage wiring for cable tv. ALL WORK PER APPROVED PLANS
- Issued Jun 15, 2026
New Construction · Install 400a, 5 gang meter bank, Install all wiring throughout 4 apartments and common areas. Install fire alarm system as per plans. Install low volt wiring for cable tv as per 2017 NEC and 2016 NFPA 72.
- Issued Jun 4, 2026
New Construction · Install(2) 1000 amp, 120/208v 3phase meter banks for 94 apartments, Install 600a, 3ph, 120/208v house service, install fire pump service. Install all wiring throughout 94 apartments and common areas. Install Rath system (rescue assistance system)as per plans. Install 120v smoke alarms. Install low voltage wiring for tv. Install 200a, 1ph temporary construction service with lighting & gfci on each floor .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT
- Issued May 5, 2026
New Construction · install 200a, 1ph, 120/240v main service. Install all wiring throughout single family., Install recessed lighting throughout, Install low voltage wiring for tv
- Issued May 5, 2026
New Construction · install 200a, 1ph, 120/240v main service. Install all wiring throughout single family., Install recessed lighting throughout, Install low voltage wiring for tv
- Issued May 5, 2026
New Construction · install 200a, 1ph 120/240v main service. Install all wiring throughout new construction Single dwelling home. Install recessed lighting. Install low voltage wiring for tv.
- Issued May 5, 2026
New Construction · install 200a, 1ph, 120/240v main service. Install all wiring throughout single family., Install recessed lighting throughout, Install low voltage wiring for tv
- Issued May 1, 2026
New Construction · Install 400a 1ph, 120/240v main service with 5 gang meter module. Install all new wiring throughout 4 apartments and common areas. Install fire alarm system as per plans. Install cable tv wiring all work per approved plans
- Issued Apr 30, 2026
Addition and/or Alteration · Install a new 200-amp electrical service to the church, including meter socket, main circuit breaker panel, service conductors, and proper grounding and bonding. Provide complete electrical distribution throughout the building, including installation of wiring, lighting fixtures, switches, exit signs, emergency lighting, and receptacle outlets. Furnish and install a fire alarm system, including control equipment, initiating devices, notification appliances, wiring, All work shall be perform
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 31, 2026
New Construction · Install 200amp, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout new construction home. Install low wiring for cable tv
- Issued Mar 12, 2026
New Construction · Install 400a, 1ph-120/240v main service- Install 4 gang meter bank with breakers, install all new wiring throughout 3 apartments & common hallways. Install fire alarm system as per plans, Install low voltage wiring for tv. All work per plans NEC 2017, NFPA 72 2016, & The Philadelphia Fire Code 2018.
- Issued Mar 5, 2026
New Construction · Electrical Permit for combo RP-2025-012677
- Issued Mar 5, 2026
New Construction · Electrical Permit for combo RP-2025-012676
- Issued Mar 5, 2026
New Construction · Electrical Permit for combo RP-2025-012679
- Issued Mar 5, 2026
New Construction · Electrical Permit for combo RP-2025-012678
- Issued Mar 4, 2026
New Construction · Electrical Permit for combo RP-2025-010886 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction plans.
- Issued Feb 25, 2026
Addition and/or Alteration · Install 1000-amp 120/240v main service. Install 13-gang meter bank with 1000-amp main & 13 meters. Install all wiring throughout 12 apartments & common hallways. Install all wiring as per plans. Install low voltage for tv/internet. Install fire alarm system as per plans as per 2016 NFPA 72.
- Issued Feb 25, 2026
New Construction · Install 1200a 3ph, (26) Meter module, Install 1200a 3ph, (29) Meter module, Install (2) 400a 3ph service for commercial spaces, Install 400a House service, Install all wiring throughout 55 apartments, commercial spaces and common areas. Install addressable fire alarm system as per plans, Install Rath System, Install cable tv wiring Per NFPA72 2016 & the Philadelphia Fire Code 2018 **ELECTRICAL PERMIT REQ'D FOR FITOUT OF COMMERCIAL SPACES -A SERVICE CALC WAS NOT SUPPLIED FOR COMMERCIAL SPACES
- Issued Feb 11, 2026
New Construction · Electrical Permit for combo RP-2025-009724
- Issued Feb 11, 2026
Addition and/or Alteration · Main service existing-. Install all new wiring and lighting throughout. CUT & FISH wiring in existing walls. Install cable tv wiring
- Issued Feb 11, 2026
New Construction · Electrical Permit for combo RP-2025-009723
- Issued Jan 23, 2026
New Construction · Install 200a, 1ph, 120/240v main service with 40 circuit main breaker panel. Install all wiring & lighting throughout SFD. Install 120v smokes *& co detectors throughout. Install cable tv wiring
- Issued Jan 8, 2026
New Construction · Install 200a 1ph, 120/240v main service. Install 40 circuit MB panel. Install all wiring & lighting throughout SFD. Install 120v smokes/co det. Install low voltage wiring for tv.
- Issued Dec 29, 2025
Addition and/or Alteration · INSTALL 1000 AMP ELECTRICAL SERVICE AND 21 METERS WITH PROPER GROUNDING AND BONDING. INSTALL TWO 600 AMP SUBPANELS FOR HOUSE, ONE 400 AMP SUBPANEL FOR TENANT SPACE, ONE 400 AMP SUBPANEL FOR FIRE PUMP, ONE 200 AMP SUBPANEL FOR EACH OF THE 6 DWELLING UNITS AND ONE 150 AMP SUBPANEL FOR EACH OF THE 12 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES EMERGENCY LIGHTING, EXIT SIGNS, TELECOMMUNICATION WIRING AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM
- Issued Dec 23, 2025
New Construction · Electrical Permit for combo RP-2025-010278
- Issued Dec 23, 2025
New Construction · Electrical Permit for combo RP-2025-010277
- Issued Dec 23, 2025
New Construction · Electrical Permit for combo RP-2025-010276
- Issued Dec 8, 2025
New Construction · Install 200a, 1ph 120/240v main service, Install 2 gang meter socket with SER cables, 30 circuit MLO panels,. Install ground as per code
- Issued Dec 2, 2025
New Construction · Install 1200 amp, 3-phase meter bank with 37 meters. Install 1200 amp, 3-phase meter bank with 36 meters. Install 400 amp, 3-phase CT cabinet for house. Install all wiring throughout 73 apartments and common areas. Install low voltage wiring for tv as per 2017 NEC. Install RATH system. Install addressable fire alarm system as per 2016 NFPA 72.
- Issued Nov 18, 2025
500 N Christopher Columbus Blvd
New Construction · Install 1600a, 3ph 60gang meter module, Install 1200a 3ph 37 gang meter module, Install 600a ct serviced for house, install Fire pump ct service. Install all wiring throughout 97 apartments and common areas. Install addressable fire alarm system throughout, install rath system (RAS/AOR), install wiring for tv. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE. -NOTED:HORIZONTAL EXITS INSTALLED IN LIEU OF STAND-BY POWER.
- Issued Nov 7, 2025
New Construction · Install 200a, 1 ph 120/240v main service with 40 circuit main breaker panel. Install all wiring throughout SFD. Install all lighting and power. Install 120v smokes & co det as per code. Install tv wiring
- Issued Nov 3, 2025
New Construction · Install 600a, 1ph, 120/240v main service with 8 gang meter module., Install all wiring throughout 7 apartments and common areas. Install fire alarm system throughout as per plans. Install low voltage for tv. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 17, 2026.