- Violation Aug 12, 2026OPEN
WORKMAN LIKE
The docket
85 entries
- Issued Aug 19, 2026
Permit issued — Alterations
Approved plumbing repair work per EZ Permit Standard for Plumbing Seal lateral · contractor: JOSEPH MORETTI
- Issued Aug 17, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006584 · contractor: AL-KAUN CO
- Issued Aug 17, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006586 · contractor: AL-KAUN CO
- Issued Aug 17, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006587 · contractor: AL-KAUN CO
- Issued Aug 17, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006585 · contractor: AL-KAUN CO
- Issued Aug 17, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006583 · contractor: AL-KAUN CO
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006586 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006586 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006584 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006585 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006587 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006587 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006585 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006587 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006584 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006584 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006583 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006585 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006583 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006586 · contractor: PLUMB-TECH LLC
- Issued Jul 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006583 · contractor: PLUMB-TECH LLC
- Issued Jun 2, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 29, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 29, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006587 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006584 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006590 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006589 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006591 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006583 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006586 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006588 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006585 · contractor: Baldwin Electrical Construction LLc
- Issued May 27, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-006592 · contractor: Baldwin Electrical Construction LLc
- Issued May 20, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 20, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 20, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 20, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 18, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 18, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued May 13, 2026
Permit issued — New Construction
FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN A MECHANICAL ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. · contractor: TDK Enterprises Inc. / ARK Protective Services
- Issued Apr 28, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006589 · contractor: AL-KAUN CO
- Issued Apr 28, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006590 · contractor: AL-KAUN CO
- Issued Apr 28, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006591 · contractor: AL-KAUN CO
- Issued Apr 28, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006592 · contractor: AL-KAUN CO
- Issued Apr 28, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-006588 · contractor: AL-KAUN CO
- Issued Apr 8, 2026
Permit issued — New Construction or Additions
Plumbing Permit for combo SP-2026-000102 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006591 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006592 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006588 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006589 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006592 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006589 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006590 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006591 · contractor: PLUMB-TECH LLC
- Issued Apr 7, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006590 · contractor: PLUMB-TECH LLC
- Issued Apr 6, 2026
Permit issued — Sitework with Onsite Utility Services
FOR A SITE WORK AS PER APPROVED PLANS · contractor: PLUMB-TECH LLC
- Issued Jan 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006589 · contractor: PLUMB-TECH LLC
- Issued Jan 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006590 · contractor: PLUMB-TECH LLC
- Issued Jan 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006592 · contractor: PLUMB-TECH LLC
- Issued Jan 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006591 · contractor: PLUMB-TECH LLC
- Issued Jan 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-006588 · contractor: PLUMB-TECH LLC
- Issued Jan 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-006588 · contractor: PLUMB-TECH LLC
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006585 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006592 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006588 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006590 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006586 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006591 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006583 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006584 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006587 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Oct 3, 2025
Permit issued — Excavation
Site / Utility Permit for RP-2025-006589 · contractor: B4 SOLUTIOS LLC · 1 units
- Issued Sep 8, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Sep 8, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Sep 8, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Sep 8, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Sep 8, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Aug 26, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Aug 26, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Aug 26, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Aug 26, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. UNDERPINNING TO BE PERFORMED. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, M · contractor: T9 Homes, LLC · 1 units
- Issued Aug 26, 2025
Permit issued — New Construction
FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN · contractor: T9 Homes, LLC · 1 units
- Issued Aug 4, 2025
Permit issued — Major Demolition
FOR THE COMPLETE DEMOLITION OF A ONE-STORY EXISTING STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HANDHELD DEVICES AND MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. · contractor: E K MULTISERVICE LLC
Nearby on the record
Other addresses in 19148 with recent activity on the public record.
The 19148 dashboard →The East Passyunk dashboard →Every recent record in 19148 →
Track this parcel
We'll flag the next deed, permit, or violation on the record here — including any sheriff-sale filing — usually before the neighbors know.
Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file August 19, 2026. Verify independently before relying on it.