THE INDEX: 84 78 · week of Aug 24permits quiet, openings quiet, deal ledger running hot

The Philadelphia Index

Entity File · The Public Record

Company / LLC

T9 Homes LLC

1 property · $2M acquired · 94 permits · 1 violation

Records on file
96
Acquired
$2M

Acquired

1 entry

  1. Recorded Aug 6, 2025

    $2M

    1601 S 9th St

    from TONKINS TAWANA

Permits (as owner)

84 entries

  1. Issued Aug 19, 2026

    1601 S 9th St

    Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing Seal lateral

  2. Issued Aug 17, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006584

  3. Issued Aug 17, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006586

  4. Issued Aug 17, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006587

  5. Issued Aug 17, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006585

  6. Issued Aug 17, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006583

  7. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006586

  8. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006586

  9. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006584

  10. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006585

  11. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006587

  12. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006587

  13. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006585

  14. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006587

  15. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006584

  16. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006584

  17. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006583

  18. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006585

  19. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006583

  20. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006586

  21. Issued Jul 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006583

  22. Issued Jun 2, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  23. Issued May 29, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  24. Issued May 29, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK

  25. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006587

  26. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006584

  27. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006590

  28. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006589

  29. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006591

  30. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006583

  31. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006586

  32. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006588

  33. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006585

  34. Issued May 27, 2026

    1601 S 9th St

    New Construction · Electrical Permit for combo RP-2025-006592

  35. Issued May 20, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  36. Issued May 20, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  37. Issued May 20, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  38. Issued May 20, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  39. Issued May 18, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  40. Issued May 18, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN FIRE-PUMP ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  41. Issued May 13, 2026

    1601 S 9th St

    New Construction · FOR THE INSTALLATION OF AN NFPA 13R FIRE SUPRESSION SYSTEM SERVICED BY A TWO (2) INCH FIRE SERVICE LINE CONNECTED TO 2" PRIVATE MAIN WITH A TALCO FIRE PUMP AND 2" WILKINS 950 XLTDA BACK FLOW PREVENTER ASSEMBLY LOCATED WITHIN A MECHANICAL ROOM IN UNIT 6 AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.

  42. Issued Apr 28, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006589

  43. Issued Apr 28, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006590

  44. Issued Apr 28, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006591

  45. Issued Apr 28, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006592

  46. Issued Apr 28, 2026

    1601 S 9th St

    New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-006588

  47. Issued Apr 8, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit for combo SP-2026-000102

  48. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006591

  49. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006592

  50. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006588

  51. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006589

  52. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006592

  53. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006589

  54. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006590

  55. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-006591

  56. Issued Apr 7, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006590

  57. Issued Apr 6, 2026

    1601 S 9th St

    Sitework with Onsite Utility Services · FOR A SITE WORK AS PER APPROVED PLANS

  58. Issued Jan 21, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006589

  59. Issued Jan 21, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006590

  60. Issued Jan 21, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006592

  61. Issued Jan 21, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006591

  62. Issued Jan 21, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-006588

  63. Issued Jan 21, 2026

    1601 S 9th St

    New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-006588

  64. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006585

  65. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006592

  66. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006588

  67. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006590

  68. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006586

  69. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006591

  70. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006583

  71. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006584

  72. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006587

  73. Issued Oct 3, 2025

    1 units

    1601 S 9th St

    Excavation · Site / Utility Permit for RP-2025-006589

  74. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  75. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  76. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  77. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  78. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  79. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  80. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  81. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  82. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. UNDERPINNING TO BE PERFORMED. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, M

  83. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  84. Issued Aug 4, 2025

    1601 S 9th St

    Major Demolition · FOR THE COMPLETE DEMOLITION OF A ONE-STORY EXISTING STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HANDHELD DEVICES AND MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK.

Built (as contractor)

10 entries

  1. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  2. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  3. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  4. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  5. Issued Sep 8, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  6. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. UNDERPINNING TO BE PERFORMED. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, M

  7. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  8. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  9. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

  10. Issued Aug 26, 2025

    1 units

    1601 S 9th St

    New Construction · FOR THE ERECTION OF A FOUR (4) STORY ATTACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT AND ROOF DECK ACCESSED BY FOURTH-FLOOR FRONT. FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3) WITH REAR INTERIOR PARKING GARAGE (TWO (2 SPACES WITH EV CHARGING). BUILDING TO BE FULLY SPRINKLERED WITH A MINIMUM OF A NFPA 13R AUTOMATIC SPRINKLER SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBIN

Violations

1 entry

  1. Violation Aug 12, 2026OPEN

    1601 S 9th St

    WORKMAN LIKE

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 17, 2026.