Entity File · The Public Record
Contractor
Charles H Macdonald Electric I
21 permits
- Records on file
- 21
Built (as contractor)
21 entries
- Issued Aug 17, 2026
Addition and/or Alteration · Install fire alarm system as per 2016 NFPA 72. Basement — FA-02 • Installation: o (5) ceiling-mounted strobe lights o (15) ceiling-mounted horn/strobes o (10) wall-mounted horn/strobes • Provide required vertical conduit/homeruns as necessary. • Core drill approximately (12) wall penetrations as required. • Provide 120V power source for PAD/fire alarm equipment as required. 1st Floor Plaza — FA-03 • Installation: o (6) Wall-mounted strobe lights o (2) ceiling-mounted horn/strobes o (17) wall-
- Issued Aug 14, 2026
Addition and/or Alteration · Install new 100 amp panel. Install lighting, lighting switches and controls, receptacles, telecommunications wiring, and power to equipment as per 2017 NEC. Install fire alarm devices as per 2016 NFPA 72.
- Issued Jul 31, 2026
Addition and/or Alteration · Electrical alterations on 1st, 2nd, and 4th floors. Fire alarm device installed in the 4th-floor bathroom; all work per approved plans
- Issued Jul 23, 2026
Addition and/or Alteration · Furnish and install new light fixtures as noted on the electrical drawings. Furnish and install new power devices as noted on electrical drawings. ***NO FIRE ALARM ON THIS PERMIT***
- Issued Jul 17, 2026
Addition and/or Alteration · Perform electrical fit-out associated with renovation and ADA site improvements for the existing Capital One Café tenant space. Work includes providing complete interior electrical distribution, including installation of new wiring, lighting fixtures, switches, lighting control systems, exit signs, and emergency lighting. Scope includes electrical equipment replacement (600 volts or less), and telecommunications wiring infrastructure. Install branch circuits to serve the coffee bar, including
- Issued Jul 16, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-003554
- Issued Jun 15, 2026
Addition and/or Alteration · Installation of a 100amp feed 480 volt from adjacent building ECR to transit garage, to a 45kva transformer 480/208-120 volt mounted in garage. This transformer will feed a 200 amp main breaker panel 30 circuit. Mount (4) blink MQ 200 Fleet chargers located in parking garage 5 feet from entrance. Install (4) 50amp 2pole circuit breakers to feed charger stations. Install submetering for this panel. All work to be done according to the 2017 NEC and per approved plans.
- Issued Apr 30, 2026
Addition and/or Alteration · CMD will install cameras throughout the school.
- Issued Apr 30, 2026
Addition and/or Alteration · INSTALL NEW PANELS, UTILIZING THE EXISTING BACK BOXES AT THE PANEL LOCATIONS A, B, C, D, AND F. A NEW PANEL WITH A NEW BACK BOX AT PANEL LOCATION E. FIELD EVALUATION AND INSPECTION IS REQUIRED.NRTL SHALL PASS/FAIL THE REFURBISHED EQUIPMENT INSTALLATION. PER NEC17 110.21(A)(1) & (A)(2).." A FIELD EVALUATION BODY SHALL CERTIFY THE PANELS. ELECTRICAL CONTRACTOR SHALL UPLOAD THE NRTL CERTIFICATION ***ALL WORK PER APPROVED PLANS***
- Issued Mar 20, 2026
Addition and/or Alteration · Alteration of First Floor Lobby and and 20th floor roof-top patio, to include furnishing and installing: a new power panelboard and transformer per drawings E320, E321, and E600; wiring devices per drawing E301 and E320; and installation of light fixtures and lighting control devices per drawings E301 and E320 as per 2017 NEC. Light fixtures and lighting control devices furnished by the owner.
- Issued Mar 13, 2026
Addition and/or Alteration · Install new electrical wiring to serve the installation of lighting, switches, and a new receptacle in the laundry closet. Relocate one (1) existing duplex receptacle to accommodate the installation of a built-in China closet. All work to be done according to the 2017 NEC and per approved plans.
- Issued Feb 20, 2026
1700-20 Benjamin Franklin Pkwy
Addition and/or Alteration · Installation of light fixtures and receptacles in the lobby and bathrooms 1st floor. All work to be done per plans. 1 Horn and strobe relocated in the lobby, per plans
- Issued Dec 8, 2025
Addition and/or Alteration · Replacement of 24 sconces and 20 chandeliers at existing j-box locations in meeting rooms, like for like, no wiring.
- Issued Oct 28, 2025
Addition and/or Alteration · INSTALL NEW 200 AMP SUBPANEL. INSTALL CONDUIT AND WIRING FROM SUBPANEL TO POWER THE INSTALLATION OF THREE 4 HEAD POLE LIGHTS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Sep 22, 2025
Addition and/or Alteration · Install new transformer sections in Olson Triplex transformer 1500kva cu copper Disconnect temporary transformer from primary. Provide connection to existing distribution via buss connection. Provide new primary conductors to line side of transformer as required into existing switchgear. Test transformer cables etc. Energize new transformer connected to existing switchgear. Provide 750kw temporary generator and cabling and cable generator to separated distribution section and back feed secondary
- Issued Aug 29, 2025
Addition and/or Alteration · Install new light fixtures and new power devices as shown on electrical drawings and as per 2017 NEC. Install new fire alarm devices as shown on fire alarm drawings and as per 2016 NFPA 72.
- Issued Aug 22, 2025
Addition and/or Alteration · MacDonald Electric will furnish and install new light fixtures as shown on drawing E3002.1 MacDonald Electric will furnish and install new power devices as shown on drawing E3002.1 ***NO FIRE ALARM***
- Issued Aug 19, 2025
Addition and/or Alteration · Furnish and install new power devices as shown on the electrical drawings Furnish and install new lighting fixtures and lighting controls as shown on the electrical drawings. Relocate fire alarm devices as required for this project to new locations in room as shown on the drawings. . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Aug 4, 2025
Addition and/or Alteration · REMOVE OLD GENERATOR AND INSTALL 100 KW 480/277 VOLT 3 PHASE GENERATOR IN THE SAME LOCATION. THE EXISTING TRANSFER SWITCH WILL REMAIN. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Aug 1, 2025
Addition and/or Alteration · Fire Alarm system rough in and installation to be tied into existing building fire alarm system as per 2016 NFPA 72.
- Issued Jul 14, 2025
Addition and/or Alteration · New receptacles and data drops within renovated area. Power and data is served from existing sources located in adjacent storage room. New lighting and lighting controls are provided within the renovated area as well. Permit is for telecommunications and wiring for new lighting. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM ON THIS PERMIT** AMENDMENT: Remove restroom portion from scope of work .See approved drawings.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 16, 2026.