Entity File · The Public Record
Company / LLC
City Lights Electric LLC
1 property · $1.05M acquired · 203 permits
- Records on file
- 204
- Acquired
- $1.05M
Acquired
1 entry
Permits (as owner)
5 entries
- Issued Oct 15, 2025
Addition and/or Alteration · Install 400-amp service with grounding as per plan. Install lighting, receptacles, emergency/exit lighting, and wire HVAC equipment as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72. Rough and trim as per 2017 NEC.
- Issued Oct 14, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES NOT CONNECTED VIA DUCTWORK; INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 3, 2025
Alterations · Change Plumbing Fixture, for 4 WC, 4 Lav, 1 Urinal, 1 Kitchen sink, 6 Roof Drains and 1 Water Heater FIXTURES ONLY. NO PIPING
- Issued Sep 17, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE RECONDITION EXISTING SLAB, PATCH AND REPLACE DRYWALL, REPAIR AND REPLACE WINDOWS AS REQURIED, UPDATE BATHROOM, NEW ROOF AND EXTERIOR FACADE. PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ****************************************** 04/14/26 AMENDM
Built (as contractor)
198 entries
- Issued Jul 7, 2026
New Construction · INSTALL 400 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL. WIRING THROUGHOUT. INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN AS PER 2017 NEC. WIRE AND TRIM OUT THE ENTIRE FIRE ALARM SYSTEM AS PER 2016 NFPA 72.
- Issued Jun 30, 2026
New Construction · : INSTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTAMENTS AND LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD WIRE SMOKE ALARMS,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGNS INSTALL ENTIRE FIRE ALARM SYSTEM .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 27, 2026
Addition and/or Alteration · NEW 200A SERVICE ROUGH AND TRIM OUT THROUGH OUT AS PER NEC
- Issued Jun 27, 2026
New Construction · : INSTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR APARTMENTS HOUSE PANEL PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD WIRE SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGN PER NEC 2017 INSTALL FIRE ALARM SYSTEM . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 22, 2026
New Construction · INSTALL 400 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN, INSTALL A FIRE ALARM ALL WORK PER APPROVED PLANS NEC 2017.
- Issued Jun 18, 2026
Addition and/or Alteration · - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; IN
- Issued Jun 16, 2026
Addition and/or Alteration · INSTALL MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 2 APARTMENTS, VACANT COMMERCIAL SPACE, AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGNS. INSTALL FIRE ALARM SYSTEM, ALL WORK PER APPROVED PLANS **ELECTRICAL PERMIT REQ'D FOR FITOUT OF COMMERCIAL SPACES -A SERVICE CALC WAS NOT SUPPLIED FOR COMMERCIAL SPACES (VACANT CALC ONLY) A NEW SERVICE CALC WILL BE NEEDED FOR FUTURE USES**
- Issued Jun 15, 2026
Addition and/or Alteration · NEW 200A SERVICE ROUGH AND TRIM OUT THROUGH OUT AS PER 2017 NEC
- Issued Jun 11, 2026
Addition and/or Alteration · Tenant fit out Rough and trim out the dedicated circuit and general receptacles as per plan Rough and trim out all geral lighting and decorative lighting as per plan Rough and trim out all exit sign /emergency lighting as per plan Existing service to be used All work to be done as per NEC 2017 No fire alarm included on this proposal
- Issued Jun 9, 2026
New Construction · INSTALL 400 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN, INSTALL A FIRE ALARM ALL WORK PER APPROVED PLANS NEC 2017.
- Issued Jun 5, 2026
New Construction · INSTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD-WIRED SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGN . INSTALL COMPLETE FIRE ALARM SYSTEM . ALL WORK IS TO BE DONE ACCCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 2, 2026
New Construction · INTALL MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 4 APARTMENTS,SHELL COMMERCIAL SPACE ,AND LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD-WIRED SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGNS, FIRE ALARM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. **FUTURE ELECTRICAL PERMT REQ'D FOR FITOUT**
- Issued Jun 2, 2026
New Construction · INSTALL 400 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN, INSTALL A FIRE ALARM ALL WORK PER APPROVED PLANS NEC 2017.
- Issued Jun 2, 2026
New Construction · : INSTALL MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 DWELLINGS AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT INSTALLATION OF A FIRE ALARM SIGN PER NEC 2017. ALL WORK PER APPROVED PLANS
- Issued Jun 2, 2026
New Construction · INSTALL 400 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL. WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARD-WIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN, INSTALL A FIRE ALARM ALL WORK PER APPROVED PLANS NEC 2017.
- Issued May 29, 2026
New Construction · INSTALL 1600 AMP MAIN SERVICE EQUIPMENT WITH GROUNDING AND SUB FEEDERS FOR 30 APARTMENTS AND LANDLORD PANEL. WIRE THROUGHOUT. INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARDWIRED SMOKE ALARMS, EMERGENCY LIGHTING, AND EXIT SIGNS AS PER 2017 NEC. INSTALL NEW FIRE ALARM SYSTEM AND AREA OF REFUGE & ELEVATOR LANDING COMMUNICATION SYSTEM AS PER 2016 NFPA 72.
- Issued May 29, 2026
Addition and/or Alteration · Interior wiring only for total (17) apartments AND NORTH CORRIDOR LIGHTING. WIRING THROUGHOUT. INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, HARDWIRE SMOKE ALARMS, GROUNDING SYSTEM, EMERGENCY LIGHTING, AND EXIT SIGN PER 2017 NEC. DEMO SCOPE: REMOVE EXISTING (PANEL D) 400A, REMOVE ALL CONDUIT AND WIRE BACK TO SOURCE. No fire alarm on this permit
- Issued May 21, 2026
Addition and/or Alteration · CANOPY HETAERS AND LIGHTING . PROVIDE ALL REQUIRED 120V AND 208V POWER FOR BRANCH BOXES, CONTROL PANELS, ETC FOR A COMPLETE INSTALLATION
- Issued May 21, 2026
Addition and/or Alteration · Rough/adjust general receptacles on 3rd fl addition Provide and install new recessed on 3rd fl addition
- Issued May 6, 2026
New Construction · Install 400 amp service, Interior wiring of 3 dwelling units, and common areas. Install fire alarm, all work Per approve plans
- Issued Apr 22, 2026
New Construction · Installation of 600-amp service and associated wiring for three dwelling units, as well as wiring for vacant commercial spaces and common areas. Installation of fire alarm throughout. ALL WORK PER APPROVED PLANS NEC 2017 **ELECTRICAL PERMIT REQ'D FOR FITOUT OF COMMERCIAL SPACES -A SERVICE CALC WAS NOT SUPPLIED FOR COMMERCIAL SPACES (VACANT CALC ONLY) A NEW SERVICE CALC WILL BE NEEDED FOR FUTURE USES**
- Issued Apr 22, 2026
New Construction · Scope of Work: INSTALL 2500 AMP MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 46 APARTMENTS WITH 1ST FLOOR PARKING SPACE, SHELL COMMERCIAL SPACE, AND LANDLORD PANEL. WIRING THROUGHOUT. INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, 120 VOLT SMOKE/CO ALARMS, GROUNDING SYSTEM, EXIT/EMERGENCY LIGHTING, WIRE FIRE PUMP AND JOCKEY PUMP AS PER NEC 2017. Rough and trim out the entire fire alarm system/Area refuge system as per 2016 NFPA 72.
- Issued Apr 16, 2026
New Construction · INTALL 400A MAIN SERVICE EQUIPMENT (to be directly buried under at least 2" of concrete and positioned in rear of property)AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD WIRE SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGNS AND EMERGENCY LIGHTING , NEW FIRE ALARM SYSTEM . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Apr 15, 2026
New Construction · Electrical Permit for combo RP-2025-007684 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Apr 15, 2026
New Construction · Electrical Permit for combo RP-2025-007676 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Apr 10, 2026
New Construction · Install Receptacles • Provide and install general-use receptacles as required by NEC code and reduced per plan. • Provide wiring, boxes, devices, supports, and terminations. B. Appliances (Provided by Others) • Provide dedicated circuit / breaker / branch line for each appliance provided by others. • Make all necessary electrical connections including whips, terminations, and final testing (as applicable). • Coordinate exact requirements based on appliance cut sheets/nameplates. C. Service Pan
- Issued Apr 3, 2026
New Construction · Install a 1000-amp electrical service and a 14-meter pack with proper grounding and bonding. Install one 125-amp subpanel for the house, one 150-amp subpanel for each of the three dwelling units, and one 100-amp subpanel for each of the ten dwelling units. Install wiring, lighting, switches, exit signs, emergency lighting, and receptacle outlets. Install interconnected smoke and CO alarms. Install a fire alarm system. All work shall be performed in accordance with the 2017 NEC, the 2016 NFPA 72,
- Issued Apr 2, 2026
New Construction · INTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTAMENTS ,LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD WIRE SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGN PER NEC 2017 Install the entire fire alarm system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Mar 26, 2026
New Construction · : INSTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS AND LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD WIRE SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGNS EXIT SIGNS AND EMERGENCY LIGHTING ,NEW FIRE ALARM SYSTEM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Mar 25, 2026
Addition and/or Alteration · 200a main service upgrade for two dwelling units and house panel
- Issued Mar 23, 2026
New Construction · Install 6000 amp main service equipment with grounding and sub feeders for 124 apartments, landlord panels and future commercial spaces per single line diagram E6.11. Wiring throughout. Install lighting, emergency/exit lighting, outlets, switches, hard-wired smoke alarms, and provide power for passenger elevators s per 2017 NEC.
- Issued Mar 16, 2026
New Construction · INTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTAMENTS ,LANDLOARD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD-WIRED SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGN . Install complete fire alarm .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Mar 10, 2026
New Construction · INSTALL MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS ,LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,SMOKE ALARMS,GROUNDING SYSTEM,FIRE ALARM, EMERGENCY LIGHTING AND EXIT SIGN PER APPROVED DRAWINGS-NEC 2017 , 16 NFPA-72.
- Issued Mar 10, 2026
New Construction · INSTALL 400A MAIN SERVICE EQUIPMENT AND SUB FEEDERS FOR 3 APARTMENTS ,LANDLORD PANEL.WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES,OUTLETS,SWITCHES,HARD-WIRED SMOKE ALARMS ,GROUNDING SYSTEM,EMERGENCY LIGHTING AND EXIT SIGNS .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Feb 19, 2026
New Construction · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Feb 19, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-008841
- Issued Feb 19, 2026
New Construction · INSTALLATION OF HVAC SYSTEM FOR NEW CONSTRUCTION MIXED USE BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*
- Issued Feb 11, 2026
New Construction · Installation of 400 amp service Interior wiring of 3 dwellings Installation a Fire alarm in accordance with NFPA 72 2016 & The Philadelphia Fire code 2018
- Issued Dec 30, 2025
New Construction · Electrical Permit for combo RP-2025-007688 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 30, 2025
New Construction · Electrical Permit for combo RP-2025-007690 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 30, 2025
New Construction · Electrical Permit for combo RP-2025-007710 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 28, 2025
2 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13R) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Dec 28, 2025
2 units
New Construction · FOR UNDERPINNING AND FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS TWO-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. *****************SEPARATE PERMITS FOR ELECTRICAL, PLUMBING, AND FIRE-SUPPRESSION WORK. ************************************
- Issued Dec 28, 2025
2 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS A TWO (2) -FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Dec 22, 2025
New Construction · Electrical Permit for combo RP-2025-007711 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 22, 2025
New Construction · Electrical Permit for combo RP-2025-007714 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 22, 2025
New Construction · Electrical Permit for combo RP-2025-007712 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 22, 2025
New Construction · Electrical Permit for combo RP-2025-007718 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction and site plans.
- Issued Dec 18, 2025
3 units
New Construction · FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS THREE (3) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC**
- Issued Dec 15, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-010363
- Issued Dec 15, 2025
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-010362
- Issued Dec 15, 2025
1 units
New Construction · SEPERATE PERMIT REQUIRED FOR ADJACENT PROPERTY- As per Monitoring plan- The contractor shall install 2” flame-retardant foam under 2” flame-retardant wood plank, topped with flame-retardant plywood, secured against wind, and extending > 12 feet from the edge of the new building. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN EXCAVATION PERMIT AND GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING A
- Issued Dec 12, 2025
New Construction · Install main service equipment for 75 HP FIRE PUMP AND JOCKEY PUMP AS PER SINGLE LINE DIAGRAM E 6.11 AND grounding as per 2017 NEC.
- Issued Dec 12, 2025
3 units
New Construction · FOR NEW CONSTRUCTION OF AN ATTACHED BUILDING WITH CELLAR, ROOF DECK AND ROOF-DECK ACCESS STRUCTURE. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
- Issued Dec 12, 2025
New Construction · Install 400 amp service with grounding, (4) 125 amp panels, (1) 100 amp house panel, lighting, receptacles, 120V smoke/CO alarms, and power to equipment as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72 and 2018 Philadelphia Fire Code.
- Issued Dec 11, 2025
2 units
New Construction · As per preconstruction survey- Adjacent properties Chimneys to be relocated and or extended under a separate permit. ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO-FAMILY DWELLING HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. UNDERPINNING ON THIS PERMIT. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE T
- Issued Dec 10, 2025
2 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND PILOT HOUSE. STRUCTURE FOR USE AS TWO (2) DWELLING UNITS. SPRINKLERED THROUGHOUT PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR PLUMBING, MECHANICAL, ELECTRICAL AND FIRE SUPPRESSION. A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC.
- Issued Dec 10, 2025
2 units
New Construction · FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK ACCESS STRUCTURE. FOR USE AS A TWO-FAMILY HOUSEHOLD LIVING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED PER NFPA13R. **SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC
- Issued Dec 9, 2025
Addition and/or Alteration · Installation of 400-amp service Wiring of four units. Installation of Fire Alarm in accordance with NFPA 72 2016 & The Philadelphia Fire Code 2018
- Issued Dec 9, 2025
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED STRUCTURE TO INCLUDE A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. DETAILS AS SHOWN IN PLANS.
- Issued Dec 9, 2025
New Construction · Installation 400 amp service Wiring of 4 dwelling units Installation of fire alarm in accordance with NFPA 72, 2016 & The Philadelphia Fire Code 2018.
- Issued Dec 9, 2025
Addition and/or Alteration · INSTALL 200A SERVICE WIRING THROUGH OUT, INSTALL LIGHT FIXTURES, SWITCHES, RECEPTACLES AND HARD WIRE SMOKE ALARM, GROUNDING AS PER 2017 NEC
- Issued Dec 9, 2025
1 units
New Construction · Erection of an attached structure 3-story single family residence w/ cellar, pilot house & roof deck. Details as per attached plans.
- Issued Dec 2, 2025
New Construction · Install 300 amp service with grounding. Install (3) 125 amp panels, (1) 60 amp house panel, lighting, receptacles, exit/emergency lighting, smoke/CO alarms, and power to equipment as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- Issued Dec 1, 2025
1 units
New Construction · ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
- Issued Dec 1, 2025
3 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR, PRIVATE ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Nov 25, 2025
3 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR, PRIVATE ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR USE AS A THREE (3) FAMILY DWELLING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Nov 21, 2025
New Construction · INSTALL 400 AMP ELECTRICAL SERVICE AND 5 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 100 AMP SUBPANELS FOR HOUSE AND ONE 125 AMP SUBPANELS FOR EACH OF THE 4 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES, LIGHTING CONTROLS, TELECOMMUNICATION WIRING AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Nov 21, 2025
New Construction · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.