Entity File · The Public Record
Owner of record
City Of Phila, Dept Of Public Prop
197 permits · 116 violations
- Records on file
- 313
Permits (as owner)
197 entries
- Issued Oct 8, 2026
Addition and/or Alteration · Removal and replacement of existing parking guidance system components with new Automated Parking Guidance System (APGS) to include network equipment, pathways, low voltage circuits and system component devices. Install new Operational Closed Circuit Television (OCCTV) system to include pathways, low voltage circuits and cameras. Expansion of existing electrical distribution system to include (2) 30kVA 480-120/208V transformers, (1) 45kVA 480-120/208V transformer, (2) 60A automatic transfer swi
- Issued Oct 7, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-005081 Provide electrical installation for an existing bank, including interior wiring, lighting, lighting controls, switches, receptacle outlets, and electrical connections to equipment. All work shall be performed in accordance with the 2020 NEC and the approved plans.
- Issued Oct 5, 2026
Addition and/or Alteration · Install temporary lighting and power for skating rink, hospitality tent, Christmas tree and holiday vendor booths.
- Issued Sep 25, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-005081 FOR RELOCATION/REPLACEMENT OF HVAC APPLIANCES AND GRDs AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 24, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE TO EXISTING GROUP B FINANCIAL SERVICES USE & OCCUPANCY AT THE 1ST FLOOR. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
- Issued Sep 24, 2026
Addition and/or Alteration · Furnish and install new electrical panels, control systems, conduit, and wiring to rehabilitate the scum and grease building at the water department plant. Work includes replacement and/or installation of distribution equipment, control components, raceways, and conductors required to restore and upgrade electrical operation of the facility. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued Sep 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITHOUT A CHANGE IN OCCUPANCY CLASSIFICATION TO EXISTING SCUM COLLECTION AND CONCENTRATION FACILITY (BUILDING ID #1480063) AT THE SOUTHEAST WATER POLLUTION CONTROL PLANT, OWNED AND OPERATED BY PHILADELPHIA WATER DEPARTMENT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- Issued Sep 18, 2026
Addition and/or Alteration · ELECTRIC: Install lighting, recepts & low voltage. -2020 NEC. **NO FIRE ALARM ON THIS PERMIT**
- Issued Sep 17, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Sep 17, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO EXISTING HANGER BUILDING TO CREATE ACCESSORY BUSINESS AND STORAGE SPACES TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2021 IEBC*
- Issued Sep 17, 2026
Alterations · Installation shall comply with the 2021 Philadelphia Plumbing Code section 919(Philadelphia Single Stack/venting System) and be listed on plans.
- Issued Sep 14, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-003860
- Issued Sep 8, 2026
New construction, addition, GFA change · New construction of two-story single-family dwelling as per approved plan. Building NTE 38' in height as part of the Affordable program.
- Issued Aug 27, 2026
Alterations · - Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing
- Issued Aug 27, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-003860 FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO INCLUDE THE INSTALLATION OF NEW GRDs WITH ASSOCIATED DUCTWORK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 21, 2026
Addition and/or Alteration · Install service ,switchboard ,EPO, for 2 electric vehicle charging stations and corresponding electrical equipment to an existing parking lot as per 2017 NEC. **electrical permits will be req'd for future chargers **
- Issued Aug 20, 2026
1 units
Addition and/or Alteration · FOR SITEWORK ASSOCIATED WITH INSTALLATION OF ELECTRICAL VEHICLE CHARGING STATIONS AT EXISTING PARKING LOT. **SEPARATE ELECTRICAL PERMIT REQUIRED**
- Issued Aug 19, 2026
1 units
Addition and/or Alteration · FOR THE ERECTION OF AN ADDITION TO AN EXISTING COMMERCIAL TRANSIT STATION (A-3 OCCUPANCY) FOR USE AS STORAGE SPACE (S-2 OCCUPANCY). ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 18, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC ROOF-TOP APPLIANCE PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Aug 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (17) sprinkler heads to accommodate interior alterations
- Issued Aug 13, 2026
EZ Interior Non-Load-Bearing Wall Demo. · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Aug 12, 2026
Addition and/or Alteration · Replace lighting at Terminal A-East & Terminal E with high mast lighting poles. add/extend branch and feeder wiring and distribution equipment . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Aug 11, 2026
Site Clearing or Earth Disturbance ONLY · For the closure and deregulation of the inactive Residuals Lagoon at the Queen Lane Water Treatment Plant per plan.
- Issued Jul 30, 2026
Addition and/or Alteration · New Wiring and Circuits for signage. All work per approved plans NEC 2017
- Issued Jul 24, 2026
1 units
Addition and/or Alteration · FOR A ROOF STRUCTURE REPAIR TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Jul 17, 2026
Signs (Accessory / Non-Accessory) · FOR THE ERECTION OF TWO (2) STATICALLY ILLUMINATED DOUBLE-FACED ACCESSORY PROJECTING SIGNS AND THREE (3) STATICALLY ILLUMINATED ACCESSORY WALL SIGNS. SIZE AND LOCATION AS SHOWN IN PLANS.
- Issued Jul 8, 2026
1 units
Addition and/or Alteration · FOR THE REMOVAL OF EXISTING ROOF-MOUNTED LIGHTING AND INSTALLATION OF NEW LIGH POLES AT GROUND LEVEL. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 7, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 4 gallon Captive Aire kitchen fire suppression system, per UL 300
- Issued Jul 2, 2026
New construction, addition, GFA change · ERECTION OF AN ATTACHED STRUCTURE.(SIZE AND LOCATION AS PER PLANS)
- Issued Jul 1, 2026
New construction, addition, GFA change · Erection of an attached structure. (Size and Location as Shown on Plans)
- Issued Jun 30, 2026
General Earth Disturbance ONLY · SITEWORK ASSOCIATED WATER UTILITY LAGOON REHABILITATION AS PER APPROVED PLANS. *2018 IBC REVIEW*
- Issued Jun 23, 2026
Addition and/or Alteration · Install fire alarm devices on existing fire alarm system. PER APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 17, 2026
New construction, addition, GFA change · FOR THE ERECTION OF TWENTY-SEVEN (27) LIGHT STRUCTURES. SIZE AND LOCATION AS SHOWN IN PLANS.
- Issued Jun 16, 2026
New construction, addition, GFA change · FOR THE ERECTION OF AN ADDITION TO AN EXISTING TRANSIT STATION. SIZE AND LOCATION AS SHOWN IN PLANS. **NO SIGNS APPROVED ON THIS APPLICATION.**
- Issued Jun 12, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-001606
- Issued Jun 4, 2026
Sign · FOR THE REFACING OF EXISTING SIGNS; ONE(1) FLAT WALL SIGN AND ONE (1) PROJECTING SIGN **WORK TO BE COMPLETED PER APPROVED PLANS**
- Issued Jun 2, 2026
General Earth Disturbance ONLY · SITE WORK PERMIT FOR GENERAL EARTH DISTURBANCE ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued May 18, 2026
New construction, addition, GFA change · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY STRUCTURE, FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING, SIZE AND LOCATION AS SHOWN IN THE PLAN.
- Issued May 15, 2026
Addition and/or Alteration · Provide and install an Emergency Responder Radio Coverage System (ERRCS). The system will ensure adequate in-building radio coverage for Philadelphia Fire Department and other designated public safety agencies. Work includes installation of a bi-directional amplifier (BDA), donor and distributed antenna systems, cabling, dedicated existing power supply with battery backup, and supervisory/alarm monitoring. All work will comply with the Philadelphia Fire Code, applicable International Fire Code (
- Issued May 15, 2026
Addition and/or Alteration · Demo Only of Electrical Cabinets/ Electrical Remotes, Conduit, and Wire of AW and F Parking Garage Cell Sites
- Issued May 14, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (41) sprinklers in PHL RAE3
- Issued May 13, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A ONE-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued May 8, 2026
Addition and/or Alteration · Install new conduit, explosion-proof fittings, and wiring to support the installation of a 12,000-gallon underground gasoline storage tank and two (2) fuel dispensers, in accordance with the approved drawings. Work includes all required raceways, conductors, seals, terminations, grounding, and bonding necessary for a complete and code-compliant installation in a hazardous (classified) location. All work shall be performed in accordance with the 2017 NEC and per approved plans.
- Issued May 7, 2026
1 units
Addition and/or Alteration · For exterior work. For ti e replacement of EV chargers. **electrical work to include Removal of five (5) existing electric vehicle charging stations and replacement in kind with five (5) new units. Work includes reuse or replacement of existing wiring and connections as required, and installation of new equipment with proper mounting, terminations, grounding, and bonding. **All work shall be performed in accordance with the 2017 NEC and per approved plans.** All work to be performed per appr
- Issued May 6, 2026
Addition and/or Alteration · Install fire alarm devices and tie in to existing building fire alarm system.-2017 NEC.
- Issued May 5, 2026
Addition and/or Alteration · Replacement of existing BBC and EBBC Switchgear in same location as existing. New lighting, Grounding, and Security cameras in the switchgear yard as per 2017 NEC.
- Issued Apr 30, 2026
1 units
Addition and/or Alteration · FOR LOBBY RENOVATION TO A PORTION OF AN EXISTING STRUCTURE. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Apr 29, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED TWO (2) STORY STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. BLOWER DOOR TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM E 779 OR ASTM E 1827 BY AN APPROVED THIRD PARTY AGENCY.
- Issued Apr 23, 2026
Addition and/or Alteration · Disconnect existing and re-feed (14) new RTU's @ E Concourse PHL. Upgrade Fire Alarm and wire new Duct Detectors and Shut Down Relays . all work per approved plans. MP-2025-001869
- Issued Apr 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (11) sprinklers in PHL B-C Connector space BC/27-AB
- Issued Apr 21, 2026
Addition and/or Alteration · Furnish and install fire alarm for new pretzel and pints space in Terminal A East at PHL Airport as per 2016 NFPA 72.
- Issued Apr 15, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 12 gallon kitchen fire suppression system, per UL 300
- Issued Apr 15, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install 8 gallon kitchen fire suppression system, per UL 300
- Issued Apr 15, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-000245
- Issued Apr 13, 2026
1 units
Addition and/or Alteration · FOR THE REPLACEMENT OF ROOF ASSEMBLY OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 6, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-000245
- Issued Apr 6, 2026
Alterations · Plumbing Permit (Interior) for combo CP-2026-000245
- Issued Mar 25, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING STRUCTURE (B-C Connector, Space BC/27-AB (Lafayette’s)) IN TERMINAL B OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS FOR PARTIAL DEMOLITION AND INTERIOR RENOVATIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED
- Issued Mar 20, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (39) sprinkler heads for Escape Lounge tenant fit-out
- Issued Mar 19, 2026
Alterations · Installation of one (1) dish table, one (1) 3 compartment sink, one (1) 1 compartment prep sink, two (2) hand sinks, six (6) floor sinks, one (1) dump sink, one (1) mop sink, one (1) water closet, one (1) lavatory and one (1) hot water heater with associated piping for all.
- Issued Mar 19, 2026
New Construction · Mechanical / Fuel Gas Permit for combo RP-2025-013120
- Issued Mar 18, 2026
Addition and/or Alteration · Disconnect & remove the existing disconnects and starters from the Mechanical and HVAC equipment. Install new Feeders to the mechanical-supplied disconnects, VFDs, and equipment. Disconnect existing Duct Detectors and install new Duct Detectors on the latest HVAC equipment. Remove existing Lighting fixtures & replace with new Lighting fixtures. All work in accordance with NEC & NFPA. All work Per approved plans
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Interior) for combo RP-2025-013120
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Exterior Building Drainage) for combo RP-2025-013120
- Issued Mar 12, 2026
New construction, addition, GFA change · FOR ADDITIONS TO TERMINALS (D) & (E) AND ASSOCIATED SITE WORK TO AN EXISTING STRUCTURE FOR USE AS PART OF THE PHILADELPHIA INTERNATIONAL AIRPORT; SIZE AND LOCATION AS PER APPLICATION/PLAN.
- Issued Mar 12, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-005309
- Issued Mar 12, 2026
New Construction or Additions · Plumbing Permit (Water Distribution) for combo RP-2025-013120
- Issued Mar 11, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-000612
- Issued Mar 6, 2026
Addition and/or Alteration · Install electrical panels and associated feeders to serve the space. Provide lighting fixtures, branch circuit wiring, and wiring devices including receptacles and switches. Install electrical connections for kitchen equipment and HVAC units. Furnish and install data cabling and communication jacks. All work shall be performed in accordance with the 2017 NEC and per approved plans. Amendment: Install Fire Alarm devices and associated conduit and wiring. Connect to existing building fire alarm
- Issued Mar 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (7) sprinkler heads in space BC29B
- Issued Mar 4, 2026
Addition and/or Alteration · Fitout for new tenant (Sunglass Hut) to space-alteration to existing electrical system, including but not limited to new lighting fixtures to ceiling, display cases
- Issued Mar 4, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TOINCLUDE A TENANT FIT-OUT TO A PORTION OF THE EXISTING AIRPORT TERMINAL. FOR A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 3, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2026-001063
- Issued Mar 3, 2026
1 units
Addition and/or Alteration · FOR AN ALTERATION TO A PORTION OF AN EXISTING STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. **FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Feb 27, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK TO ACCOMMODATE A NEW TENANT AT THE AIRPORT . APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Feb 18, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-005421
- Issued Feb 13, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY CLASSIFICATION. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Feb 12, 2026
Addition and/or Alterations · FOR TA MECHANICAL SYSTEM UPGRADE TO AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Feb 10, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL HEADS THROUGHOUT RENOVATED BATHROOMS (RD5, RB2, RC1, and RF6) AS PER APPROVED PLANS AND IN ACCORDANCE WITH NFPA 13. SEE CP-2023-002079 FOR ASSOCIATED BUILDING PERMIT.
- Issued Feb 10, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (9) sprinkler heads to accommodate alterations to Space BC7
- Issued Feb 9, 2026
Change of Use · Eating and Drinking Establishments - Sit-Down Restaurant
- Issued Feb 9, 2026
Rough-In · Rough-In Permit for FP-2026-000164 Install (125) sprinklers to accommodate renovations to restrooms RD5, RB2, RC1, and RF6; new sprinklers will be tied into existing systems and backflow preventers
- Issued Feb 9, 2026
EZ Roof Covering Replacement · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Feb 6, 2026
1 units
New Construction · FOR THE ERECTION OF AN ATTACHED THREE-STORY STRUCTURE FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR ST
- Issued Feb 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.* NO BUILDIGN ALTERATIONS/NO PARENT PERMIT ASSOCIATED WITH THIS PERMIT *
- Issued Feb 3, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install pre-engineered, wet chemical kitchen fire suppression system into kitchen hood at Paris Baguette. System type: CAS TANK 4/4 (8 gal system).
- Issued Feb 2, 2026
General Earth Disturbance ONLY · FOR SITEWORK AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.
- Issued Jan 31, 2026
Alterations · FOR THE INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. ALL PIPING FOR CONVEYANCE AND SUPPLY FOR COMMERCIAL SPACE SHALL BE METALLIC TO ROOF EXTENSION. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jan 30, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-005960: Installation of EV chargers with readily accessible disconnects Installation of a new switchboard
- Issued Jan 30, 2026
1 units
Addition and/or Alteration · FOR THE INSTALLATION OF ELECTRIC VEHICLE CHARGERS AND CONCRETE EQUIPMENT PADS FOR ALL EQUIPMENTS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 30, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. FOR A NEW TENANT FIT-OUT AT THE AIRPORT. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.**MECHANICAL WORK TO BE PROVIDED PER APPROVED PLANS ** ELLECTRICAL REVIEW TO INCLUDE INSTALLATION OF NEW W
- Issued Jan 30, 2026
Addition and/or Alteration · FOR THE INSTALLATION OF NEW WIRING, TELECOMMUNICATIONS WIRING, EMERGENCY LIGHTING, LIGHTING, JUNCTION BOX, RECEPTACLES AND OUTLETS. Amended 3/13/26 Add Fire Alarm Devices to restaurant space. Wiring to connect to the existing airport system. ALL WORK PER APPROVED PLANS
- Issued Jan 20, 2026
Addition and/or Alterations · TO REMOVE AND REPLACE 40 FT. RADIANT TUBE HEATER AND TIE IT INTO EXISTING GAS LINE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Jan 16, 2026
Addition and/or Alteration · Electrical Permit for combo CP-2025-005745
- Issued Jan 15, 2026
Addition and/or Alteration · RELOCATE POWER, DATA installation. Fire alarm Installation in accordance with NFPA 72 & The Philadelphia Fire code 2018
- Issued Jan 15, 2026
Addition and/or Alteration · Grounding, branch circuits, feeders, circuit breakers, receptacles, panelboards, transformers, safety switches, AC ductless split systems, lighting, lighting controls, smart glass tinting controls, existing fire alarm system to remain, disconnect and reconnect fire alarm pull stations.
- Issued Jan 13, 2026
Addition and/or Alteration · Furnish & Install upgrade to PHL Video Security Surveillance System, network hardware and cable, CCTV cameras, power wire, CAT6, and fiber throughout Terminals D & E as per 2017 NEC.
- Issued Jan 13, 2026
Addition and/or Alteration · Replace existing electrical distribution panel with new 225A, 120/208Y distribution panel. Disconnect and remove wiring to existing HVAC equipment and replace with new branch circuit wiring to replacement equipment. Install branch circuit wiring to new equipment. All branch circuit wiring rated 120V, 240V or 208V up to 60A maximum.
Violations
116 entries
- Unsafe Feb 24, 2025ACTIVE
Unsafe structure designation
- Unsafe Aug 7, 2017ACTIVE
Unsafe structure designation
- Violation Oct 7, 2026OPEN
ALTER INTERIOR PORTION
- Violation Oct 7, 2026OPEN
MASONRY FENCE WALL
- Violation Oct 7, 2026OPEN
NEW STRUCTURE
- Violation Sep 28, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Sep 28, 2026OPEN
RUBBISH & GARBAGE
- Violation Sep 22, 2026OPEN
WORKMANLIKE- BUILDING CODE
- Violation Sep 21, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Sep 21, 2026OPEN
EXTERIOR AREA MOTOR VEHICLE WITHIN THE PROPERTY LINE
- Violation Sep 18, 2026OPEN
EXCAVATION PERMITS
- Violation Sep 18, 2026OPEN
WORK OUTSIDE OF SCOPE
- Violation Sep 18, 2026OPEN
WORK OUTSIDE OF SCOPE
- Violation Sep 17, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Sep 17, 2026OPEN
EXTERIOR AREA SANITATION
- Violation Sep 14, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Sep 5, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Sep 5, 2026OPEN
RUBBISH & GARBAGE
- Violation Sep 1, 2026OPEN
211 S Christopher Columbus Blvd
BENCHMARKING LATE
- Violation Aug 29, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Aug 29, 2026OPEN
RUBBISH & GARBAGE
- Violation Aug 28, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Aug 27, 2026OPEN
611 S Christopher Columbus Blvd
PIERS & WATERFRONT STRUCTURES INSPECTION REQUIRED
- Violation Aug 27, 2026OPEN
811 S Christopher Columbus Blvd
PIERS & WATERFRONT STRUCTURES INSPECTION REQUIRED
- Violation Aug 19, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Aug 18, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Aug 14, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Aug 10, 2026OPEN
611 S Christopher Columbus Blvd
VACANT STRUCTURE LICENSE
- Violation Aug 10, 2026OPEN
611 S Christopher Columbus Blvd
FIRE PROTECTION VACANT BUILDING
- Violation Aug 10, 2026OPEN
611 S Christopher Columbus Blvd
PERIODIC TESTING
- Violation Aug 10, 2026OPEN
611 S Christopher Columbus Blvd
INSPECTION, TESTING & MAINTENANCE
- Violation Aug 10, 2026OPEN
611 S Christopher Columbus Blvd
SUPPRESSION SYSTEM TESTING & MAINTENANCE
- Violation Aug 8, 2026OPEN
RUBBISH & GARBAGE
- Violation Aug 8, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 28, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 22, 2026OPEN
RECORD KEEPING
- Violation Jul 22, 2026OPEN
HIGH-RISE BUILDING
- Violation Jul 22, 2026OPEN
RENTAL LICENSE- HOTEL (R1)
- Violation Jul 22, 2026OPEN
FOOD - LARGE ESTABLISHMENT LICENSE
- Violation Jul 22, 2026OPEN
HIGH RISE BUILDINGS
- Violation Jul 22, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 22, 2026OPEN
COMMERCIAL SYSTEM TEST
- Violation Jul 22, 2026OPEN
HALON SYSTEMS
- Violation Jul 22, 2026OPEN
PERIODIC TESTING
- Violation Jul 22, 2026OPEN
EQUIPMENT ROOMS
- Violation Jul 22, 2026OPEN
FIRE EXTINGUISHERS
- Violation Jul 22, 2026OPEN
EXIT DOORS
- Violation Jul 22, 2026OPEN
FIRE EXTINGUISHER HANGERS & BRACKETS
- Violation Jul 18, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 18, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 17, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 14, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 14, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 14, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 14, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 14, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 13, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 13, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 9, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 9, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 8, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 8, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 7, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jul 2, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 2, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 1, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 1, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jul 1, 2026OPEN
RUBBISH & GARBAGE
- Violation Jul 1, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 30, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 30, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 29, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 29, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 27, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 27, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 17, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 17, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Jun 16, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 16, 2026OPEN
EXTERIOR AREA WEEDS
- Violation Jun 2, 2026OPEN
RUBBISH & GARBAGE
- Violation Jun 2, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 28, 2026OPEN
EXTERIOR AREA WEEDS
- Violation May 28, 2026OPEN
RUBBISH & GARBAGE
- Violation May 27, 2026OPEN
211 S Christopher Columbus Blvd
NEW ELECTRICAL WIRING
- Violation May 8, 2026OPEN
UNAPPROVED ALTERNATIVE MATERIALS
- Violation Apr 7, 2026OPEN
VACANT STRUCTURE & LAND
- Violation Mar 9, 2026OPEN
NEW USE
- Violation Mar 9, 2026OPEN
EXTERIOR AREA SANITATION
- Violation Mar 9, 2026OPEN
NEW USE
- Violation Mar 9, 2026OPEN
EXTERIOR AREA SANITATION
- Violation Nov 10, 2025OPEN
NEW STRUCTURE
- Violation Nov 10, 2025OPEN
PLANS REQUIRED TO COMPLY
- Violation Aug 26, 2025OPEN
VACANT STRUCTURE & LAND
- Violation Aug 26, 2025OPEN
NEW USE
- Violation Aug 26, 2025OPEN
EXTERIOR AREA WEEDS
- Violation Aug 26, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Aug 25, 2025OPEN
EXTERIOR AREA SANITATION
- Violation Aug 5, 2025OPEN
EXTERIOR AREA WEEDS
- Violation May 23, 2025OPEN
EXTERIOR AREA SANITATION
- Violation May 23, 2025OPEN
EXTERIOR AREA WEEDS
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated October 19, 2026.