Built (as contractor)
17 entries
- Issued Jun 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 16, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO THE 5TH AND 9TH FLOORS OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 16, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO THE 5TH FLOOR SPACE OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION, COMMON SPACE UPGRADES INCLUDE ELEVATOR LOBBY, COMMON CORRIDOR, AND REMODELING OF RESTROOMS AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 15, 2026
1 units
Addition and/or Alteration · FOR PARTIAL CHANGE OF OCCUPANCY AT 1ST-3RD FLOOR TO GROUP E AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued May 28, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING OFFICE SPACE (SUITE 1400) ON THE 14TH FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Apr 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS INTERIOR ALTERATION TO A PORTION OF THE 4TH & 5TH FLOOR LEVEL OF AND EXISTING STRUCTURE FOR USE AS A BUSINESS OCCUPANCY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **ASBESTOS REMEDIATION REQUIRED PRIOR TO RESUBMISSION**
- Issued Apr 21, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATION TO INCLUDE DEMOLITION AND THE SLAB INFILL OF EXISTING STAIR ON 30TH FLOOR SUITE 3000 TO AN EXISTING STRUCTURE. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. ***********************************SEPARATE PERMITS FOR ANY OTHER WORK. ***********************************************
- Issued Apr 10, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE.**EXTERIOR FACADE REPAIR TO BE INCLUDED** ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Mar 11, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS ON THE 4TH FLOOR OF AN EXISTING R1 OCCUPANCY WITHIN AN EXISTING BUILDING PER APPROVED PLANS AND PHC APPROVAL. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 05/28/2026: TO REVISE THE FLOOR LAYOUT AND TO EXPAND THE WORK AREA T
- Issued Dec 22, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO SPACE #27 TO CREATE TAKE OUT RESTAURANT TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES, FLOORING, STRUCTURAL WORK AS PER APPROVED PLANS. SEPARATE PERMITS REQURIED FOR ANY MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
- Issued Dec 12, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO EXISTING TSA STAFF AREA (GROUP B) LOCATED IN D/E CONNECTOR PRE-SECURITY AREA OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
- Issued Oct 20, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING GROUP B EATING ESTABLISHMENT IN SPACE #C08 WITHIN PHILADELPHIA INTERNATIONAL AIRPORT TERMINAL C. EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK.
- Issued Oct 6, 2025
1 units
Addition and/or Alteration · **AMENDED ON 12/1/2025 TO FIX ADDRESS** FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Sep 23, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO SUITE 3110 IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMO AND THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Sep 19, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING BUSINESS OCCUPANCY ON 31ST FLOOR OF AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 5, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATION TO AN EXISTING SPACE C-2 LOCATED IN TERMINAL C (AIRPORT). ALTERATIONS TO INCLUDE FINISHES/FURNISHINGS UPGRADE. FOR USE AS EATING AND DRINKING ESTABLISHMENTS-TAKE-OUT-RESTAURANT. BUILDING IS FULLY SPRINKLERED. ** ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **MECHAMICAL SYSTEM UPGRADE INCLUDED AS PART OF THE PROJECT** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 16, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE LOCATED AT THE AIRPORT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **NEW MECHANICAL WORK TO BE INCLUDED AS PART OF THE PERMIT**ELECTRICAL WORK TO INCLUDE INSTALLATION OF NEW WIRING, LIGHTING, SWITCHES, EXIT SIGN, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS ACCORDING TO THE 2017 NEC AND PER PLANS.**SEPARATE PERMITS TO BE OBT
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.