Entity File · The Public Record
Company / LLC
Elc Holding Company
32 permits
- Records on file
- 32
Built (as contractor)
32 entries
- Issued Jun 15, 2026
Alterations · Install 2-lavatories; 5- water closets; 8- tub/shower; 2- hose bibs; 2- floor drains to include all necessary piping as per plans
- Issued Jun 11, 2026
Addition and/or Alterations · FOR THE PARTIAL DEMOLITION OF 43 REGISTERS, DIFFUSERS, AND FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 5, 2026
Alterations · Install 3- sinks to include necessary piping as per plans.
- Issued Jun 5, 2026
Addition and/or Alterations · FOR A ECHANICAL SYSTEM UPGRADE TO ACCOMMODATE AN EXISTING STRUCTURE. WORK TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued May 12, 2026
Addition and/or Alterations · FOR INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued May 6, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-002505 FOR THE INSTALLATION OF HVAC APPLIANCES AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 5, 2026
Addition and/or Alterations · FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO RELOCATE GRDs AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-001659 FOR ASSOCIATED BUILDING PERMIT.
- Issued Apr 27, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW HVAC SYSTEMS ASSOCIATED PIPING AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
- Issued Apr 26, 2026
Alterations · Install 1- kitchen sink to include piping as per plans
- Issued Apr 26, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 26, 2026
Alterations · Install 4- new instant water heaters to include all necessary piping ALL WORK PERFOMRED IN STRICT COMPLIANCE WITH 2018 PPC AND EZ PLUMBING STANDARD.
- Issued Mar 29, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Feb 17, 2026
Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh
- Issued Feb 4, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 28, 2026
New Construction or Additions · NEW CONSTRUCTION OF COMMERCIAL SUBSTATION. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE BASE VENTING CCODE. ALL MATERIALS UTILIZED SHALL BE METALLIC. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jan 23, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Jan 5, 2026
Alterations · ALTERATIONS TO EXISTING SERVICE STATION. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS TO BE METALLIC. VENTING TO BE DEISGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jan 5, 2026
Alterations · Install 1- sink (other) ; medical gas lines(other) and piping as per plans ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND PLUMBING EZ STANDARD.
- Issued Jan 5, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-004751
- Issued Dec 27, 2025
New Construction · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, AND ASSOCIATED DUCTWORK AND PIPING AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-005927 FOR ASSOCIATED BUILDING PERMIT.
- Issued Dec 10, 2025
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADE TO ACCOMMODATE AN EXISTING STRUCTURE. ** ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **
- Issued Oct 14, 2025
Alterations · INSTALLATION OF 7 INDIRECT WASTE RECEPTORS IN COMPLIANCE WITH 2018 PPC AND EZ STANDARD.
- Issued Oct 1, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS / DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 29, 2025
Addition and/or Alterations · FOR A MECHANICAL SYSTEM UPGRADES TO ACCOMMODATE AN EISTING STRUCTURE. ** ALL WORK TO BE DONE PER APPROVED PLANS. ** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.**ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK**
- Issued Sep 29, 2025
Addition and/or Alterations · FOR MECHANICAL WORK . ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Sep 19, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF A DUCTLESS SPLIT-SYSTEM APPLIANCE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-003089 FOR ASSOCIATED BUILDING PERMIT.
- Issued Sep 8, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE. ALTERATIONS TO INCLUDE THE RELOCATION OF PARTITION WALLS AND DOORS, THE INSTALLATION OF EXIT SIGNS, AND PROVIDE FINISHES/FURNISHINGS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 21, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2024-003596
- Issued Jul 21, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 21, 2025
Alterations · INTERIOR INSTALLATION OF 2 NEW FIXTURES AND ALL NECESSARY CONVEYANCE PIPING. ALL MATERIALS SHALL BE METALLIC UTILIZING APPROVED JOINING METHODS WITH CODE. VENTING FOR NEW FIXTURE AND ALL DESIGN SHALL BE IN COMPLIANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
- Issued Jul 17, 2025
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-003084
- Issued Jul 10, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS AND DIFFUSERS WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO APPLIANCES ON THIS PERMIT.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.