Entity File · The Public Record
Company / LLC
First Call Demolition LLC
55 permits
- Records on file
- 55
Built (as contractor)
55 entries
- Issued Jun 25, 2026
City Demolition · Sub Demolition Permit for CF-2022-034729. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (2) stucco c/w 3237, 3241 Hartville. Erosion control mat with topsoil and seed. 6' chain link fence across front.
- Issued Jun 4, 2026
Full Demolition · For the complete demolition of the existing attached accessory structure, BIN 1015004. No change to the existing primary structure.
- Issued May 28, 2026
City Demolition · Sub Demolition Permit for CF-2022-060113. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. No stucco. Erosion control mat with topsoil and seed. 4' corral fence across front of property.
- Issued May 20, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE ATTACHED THREE-STORY STRUCTURE BY HAND AND HAND HOLD DEVICES. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN MIN. 8 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.
- Issued May 13, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. **SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.**
- Issued May 11, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE. EXISTING STRUCTURE TO BE DEMOLISHED BY HAND AND HAND-HELD EQUIPMENT ONLY PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2 * NEWLY EXPOSE
- Issued May 11, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE. EXISTING STRUCTURE TO BE DEMOLISHED BY A COMBINATION OF HAND-HELD AND MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POSTING AND NOTICE REQUIRED PER A-303
- Issued Apr 24, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED MASONRY AND WOOD ONE-STORY STRUCTURE BY HAND METHODS AND MECHANICAL METHODS USING SMALL EXCAVATOR ON CONCRETE SLAB SECTION ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. AN
- Issued Apr 23, 2026
City Demolition · Sub Demolition Permit for CF-2026-033161. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No sidewalk. (2) stucco c/w 137, 141 N. Robinson. Install new railing on front porch c/w 137 N. Robinson. Erosion control mat with topsoil and seed. 4' corral fence across front.
- Issued Apr 7, 2026
Minor Demolition · *MAKE SAFE PERMIT** FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY BUILDING TO COMPLY WITH VIOLATION CASE #CF-2026-019669. DEMOLITION TO BE DONE BY HAND/ HAND TOOLS FOR ROOF/ SECOND FLOOR AND MECHANICAL DEMOLITION METHODS FOR REMAINING PORTION OF BUILDING. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE
- Issued Apr 7, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO-STORY STRUCTURE BY MECHANCIAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *A COVERED WALKWAY OR SIDEWALK CL
- Issued Apr 1, 2026
Major Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED FOUR (4) STORY MASONRY STRUCTURE. STRUCTURE TO BE DEMOLISHED BY BOTH HAND AND MECHANICAL. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO THE START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE
- Issued Mar 27, 2026
Full Demolition · FOR COMPLETE DEMOLITION OF AN EXISTING I.D. STRUCTURE.
- Issued Mar 27, 2026
Major Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED ONE-STORY STRUCTURE BY HAND AND MECHANCIAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *A COVERED WALKWAY OR SI
- Issued Mar 19, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED MASONRY AND WOOD THREE-STORY STRUCTURE BY HAND AND MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WO
- Issued Mar 18, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION TWO (2) EXISTING ONE-STORY DETACHED STRUCTURES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS AND WITH MECHANICAL DEMOLITION EQUIPMENT AT THE LOCATIONS SHOWN ON THE DEMOLITION SITE PLAN. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO
- Issued Mar 18, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY WOOD FRAMED STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.
- Issued Mar 16, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING ONE-STORY STRUCTURE. DEMOLITION TO BE DONE BY HAND FOR STRUCTURAL DEMOLITION AND MECHANICAL DEMOLITION FOR CONCRETE SLAB ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED PERMIT. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. DUST CO
- Issued Mar 4, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY STRUCTURE BY HAND AND WITH HAND TOOLS AND WITH MECHANICAL DEMOLITION EQUIPMENT. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION A
- Issued Feb 17, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE. EXISTING STRUCTURE TO BE DEMOLISHED BY HAND-HELD EQUIPMENT ONLY PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2 * NEWLY EXPOSED WALLS TO
- Issued Jan 29, 2026
City Demolition · Sub Demolition Permit for CF-2026-007592. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No stucco. No sidewalk. 1 tree removal. Replace rear fence. Erosion control mat with topsoil and seed. Erosion control mat with topsoil and seed.
- Issued Jan 29, 2026
City Demolition · Sub Demolition Permit for CF-2026-007858. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: No stucco. No sidewalk. 1 tree removal. Replace rear fence. Erosion control mat with topsoil and seed. Erosion control mat with topsoil and seed.
- Issued Jan 27, 2026
Full Demolition · FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURE FOR USE AS A VACANT LOT.
- Issued Jan 27, 2026
Full Demolition · FOR COMPLETE DEMOLITION OF EXISTING STRUCTURE FOR USE AS A VACANT LOT.
- Issued Jan 21, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY ATTACHED MASONRY STRUCTURE. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITI
- Issued Jan 16, 2026
City Demolition · Sub Demolition Permit for CF-2026-004450. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: (1) stucco c/w 2873 N. Lee. 6' chain link fence in rear. Replace concrete block in front of steps. Erosion control mat with topsoil and seed. 4' corral fence around perimeter of property.
- Issued Jan 14, 2026
Minor Demolition · FOR THE COMPLETE DEMOLITION OF ONE EXISTING ATTACHED 3-STORY BUILDING WITH A DORMER BY HAND DEMOLITION ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE.ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY
- Issued Dec 16, 2025
City Demolition · Sub Demolition Permit for 618333. For the complete demolition of a property as part of the City of Philadelphia Demolition Program. Add'l specs: Sheath and insulate c/w 1434 N. Myrtlewood if necessary. (1) stucco c/w 1438 N. Myrtlewood. 4' corral fence across front. Erosion control mat with topsoil and seed.
- Issued Dec 10, 2025
New construction, addition, GFA change · FOR THE PARTIAL DEMOLITION OF AN EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.
- Issued Dec 10, 2025
Addition and/or Alteration · FOR THE DEMOLITION BY HAND OF A CHIMNEY IN FRONT OF AN EXISTING ATTACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN.
- Issued Dec 2, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.
- Issued Nov 24, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING TWO (2) STORY MASONRY ATTACHED STRUCTURE. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION
- Issued Oct 24, 2025
Minor Demolition · MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION CF-2021-096857. FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE. EXISTING STRUCTURES TO BE DEMOLISHED BY HAND-HELD EQUIPMENT ONLY PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 2
- Issued Aug 6, 2025
Major Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE TO RESOLVE CASE FILE CF-2024-129601. EXISTING STRUCTURE TO BE DEMOLISHED BY MECHANICAL AND HAND AND HAND-HELD EQUIPMENT AS PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POST
- Issued Jul 22, 2025
Major Demolition · FOR THE LEGALIZATION OF COMPLETE DEMOLITION (REMOVAL OF MORE THAT 2/3 JOISTS) OF THE EXISTING THREE (3) STORY MASONRY STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY.
- Issued Jul 21, 2025
Minor Demolition · FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY MASONRY AND WOOD STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.