Entity File · The Public Record
Company / LLC
Flatiron Building Company
13 permits
- Records on file
- 13
Built (as contractor)
13 entries
- Issued Jun 15, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued May 26, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS (WITH NO CHANGE OF OCCUPANCY) AT BASEMENT OF EXISTING BUILDING. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING.
- Issued May 5, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING HIGHER EDUCATION FACILITY ART GALLERY AS PER APPROVED PLANS. *2018 IEBC REVIEW*
- Issued Mar 4, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS FOR THE INSTALLATION OF NEW MECHANICAL SYSTEM. FOR USE AS PREVIOUSLY APPROVED AS PER APPROVED PLANS.
- Issued Dec 18, 2025
1 units
Addition and/or Alteration · FOR THE ERECTION OF TEMPORARY PARTITION AND EXTERIOR WALL OPENING AS PER APPROVED PLANS.
- Issued Oct 23, 2025
25 units
Addition and/or Alteration · FOR LEVEL I INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE AND OCCUPANCY CLASSIFICATION TO AN EXISTING ONE (1) STORY DETACHED STRUCTURE (BIN #1465606) CONTAINING TWENTY-FIVE (25) DWELLING UNITS (GROUP R-2). BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS WORK AND FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. **SEE MI-2025-006468 FOR BBS VARIANCE FOR SUBSTANTIAL IMPROV
- Issued Oct 23, 2025
18 units
Addition and/or Alteration · LEVEL I ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING EIGHTEEN (18) UNIT BUILDING AS PER APPROVED PLANS AND BBS VARIANCE NO. MI-2025-006476. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Oct 14, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Oct 14, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING COMMERCIAL BUILDING FOR USE AS AN APARTMENT BUILDING (B OCCUPANCY), ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 14, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO BASEMENT LOCKER ROOM AND BREAKROOM IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Sep 29, 2025
1 units
Addition and/or Alteration · FOR THE EXTERIOR BUILDING RESTORATION INCLUDING ROOFING/ MASONRY REPAIRS, WINDOW REPAIR AND REPLACEMENT, REPLACEMENT OF EXISTING FIRE ESCAPE, RECONFIGURATION OF EXISTING ADA RAMP, ROOFTOP EQUIPMENT MECHANICAL SCREEN AND INTERIOR RENOVATIONS INCLUDING STRUCTURAL WORK- INTERIOR FLOOR RE-FRAMING PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 22, 2025
1 units
Addition and/or Alteration · *ASBESTOS ABATEMENT REQUIRED PRIOR START OF WORK.* FOR REPAIRS AND ALTERATIONS TO AN EXISTING EDUCATION AND TRAINING CENTER (B, E, & A-3) INCLUDING FINISHES, ACCESSIBILITY UPGRADES, AND LEVEL 2 ALTERATIONS AS PER APPLICATION/PLANS AND IN ACCORDANCE WITH THE 2018 IEBC. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, MECHANICAL, AND PLUMBING WORK.
- Issued Aug 6, 2025
1 units
Addition and/or Alteration · FOR A LEVEL I INTERIOR ALTERATIONS TO AN EXISTING LABORATORY SPACE (LAB #310B). BUILDING IS BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.