Haines & Kibblehouse INC
9 permits
- Records on file
- 9
Built (as contractor)
9 entries
- Issued Jul 8, 2026
1 units
Addition and/or Alteration · FOR THE REMOVAL OF EXISTING ROOF-MOUNTED LIGHTING AND INSTALLATION OF NEW LIGH POLES AT GROUND LEVEL. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 2, 2026
General Earth Disturbance ONLY · SITE WORK PERMIT FOR GENERAL EARTH DISTURBANCE ONLY PER APPROVED PLAN. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Feb 25, 2026
Sitework with Onsite Utility Services · FOR THE INSTALLATION OF UNDERGROUND UTILITIES AND RELATED APPURTENANCES AS NOTED ON THE APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *See Flood Protection Form- Project Summary (FP-PS)" Dated 6-502025 for Floodplain Requirements.
- Issued Feb 24, 2026
1 units
Addition and/or Alteration · FOR THE INTERIOR DEMOLITION THROUGHOUT AN EXISTING STRUCTURE. FOR USE AS PREVIOUSLY APPROVED. AS PER APPROVED PLANS. ********************************SEPARATE PERMIT FOR ANY OTHER WORK. ****************************
- Issued Dec 3, 2025
Excavation · FOR EXCAVATION OF ELEVATOR PIT USING PERSCRIPTIVE SHORING MEASURES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
- Issued Oct 30, 2025
Major Demolition · FOR COMPLETE DEMOLITION OF EXISTING STRUCTURES. EXISTING STRUCTURES TO BE DEMOLISHED BY MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. * A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. * 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2 * NEWLY EXPOSED WALLS TO BE TR
- Issued Sep 10, 2025
Sitework with Onsite Utility Services · SITEWORK ASSOCIATED WITH NEW UTILITY WORK AND BASINS AS PER APPROVED PLANS. *2018 IBC REVIEW* **SEPARATE PERMIT REQUIRED FOR PLUMBING WORK**
- Issued Aug 11, 2025
Major Demolition · FOR THE COMPLETE DEMOLITION OF AN EXISTING DETACHED 3-STORY STRUCTURE BY MECHANICAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. IF FIELD CONDITIONS VARY CONTACT
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.