27 permits
- Records on file
- 27
Built (as contractor)
27 entries
- Issued Jun 12, 2026
Addition and/or Alteration · Replacing hot water heaters and some devices as per 2017 NEC.
- Issued Apr 21, 2026
Addition and/or Alteration · INSTALL LIGHTING, WIRING, LIGHTING CONTROLS, RECEPTACLE OUTLETS AND TELECOMMUNICATION WIRING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS. Amendment: Install fire alarm system according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Apr 15, 2026
Addition and/or Alteration · Perform alterations to the elevator lobby, corridors, and restroom areas. Work includes installation and/or modification of electrical wiring, lighting fixtures, lighting control systems, exit signs, and emergency lighting. Furnish and install fire alarm devices, including all required wiring, terminations, and connections to the existing fire alarm system. All work shall be performed in accordance with the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Apr 8, 2026
Addition and/or Alteration · Install 1200 amp MDP from existing 4000 amp main switchboard. Install (1) 600 amp MCB panel, (1) 600 amp MLO panel, (2) 150 MCB panels, (1) 150 amp MLO panel, and (1) 100 amp MCB panel. Install lighting, switches, receptacles, telecommunications wiring, exit/emergency lighting, and provide power to equipment as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72. AMENDMENT: Install telecommunications and security wiring as per 2017 NEC.
- Issued Apr 6, 2026
Addition and/or Alteration · Installation of Lighting, devices, receptacles, and fire alarm all work per approved plans. NEC 2017
- Issued Mar 12, 2026
Addition and/or Alteration · Install wiring, lighting, lighting controls, receptacle outlets and fire alarm system. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Feb 10, 2026
Addition and/or Alteration · Installing 2 4MW generators .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Dec 30, 2025
Addition and/or Alteration · Provide new Electrical & Tele/Data Services to new Kiosk. All work to be done according to the 2017 NEC and per approved plans.
- Issued Dec 10, 2025
Addition and/or Alteration · Furnish and install Temporary Power and lighting
- Issued Nov 3, 2025
Addition and/or Alteration · Teledata comms, 250' longest run Plenum
- Issued Oct 30, 2025
Addition and/or Alteration · Install lighting, receptacles, and exit signs as per 2017 NEC. AMENDMENT: Install fire alarm system as per 2016 NFPA 72.
- Issued Oct 27, 2025
Addition and/or Alteration · Data network, longest run 250' plenum.
- Issued Oct 20, 2025
Addition and/or Alteration · Install lighting, switches, lighting controls, tele/data wiring, and power as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- Issued Oct 15, 2025
Addition and/or Alteration · Lighting, control, Branch wiring for 1st floor and basement Per Plans Fire alarm Device Installation on first floor Per plans In accordance with NFPA 72 2016 Philadelphia fire code 2018
- Issued Oct 13, 2025
Addition and/or Alteration · INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Oct 2, 2025
Addition and/or Alteration · Replace one set of feeder cable ,adjust breaker setting ,Site Lighting, Interior wiring, Fire alarm, Panels, lighting . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS -2017 NEC ,2016 NFPA-72. AMENDMENT: Install LED SCREEN TEMP POWER . INSTALL POWER FOR NEW LED SCREEN -2017 NEC.
- Issued Sep 22, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, LIGHTING CONTROLS, EXIT SIGNS, EMERGENCY LIGHTING AND RECEPTACLES. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Sep 15, 2025
Addition and/or Alteration · Install new 100 amp panel, lighting, and branch circuit wiring as per 2017 NEC. ***NO FIRE ALARM***
- Issued Aug 18, 2025
Addition and/or Alteration · Install fire alarm according to approved drawings-2017 nec,2016 nfpa-72.
- Issued Jul 24, 2025
Addition and/or Alteration · Install lighting, receptacles, lighting controls, pull strings for tele/data, AV, and security systems, (1) 100 amp 480/277V panel, (1) 120/208V panel, and power to equipment as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
- Issued Jul 22, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, LIGHTING CONTROLS AND 4 DEDICATED BRANCH CIRCUIT FOR THE EXHAUST FAN, CIRCULATING PUMP, DRINKING FOUNTAIN AND WATER HEATER. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Jul 18, 2025
Addition and/or Alteration · INSTALL WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLET. INSTALL DEDICATED BRANCH CIRCUITS FOR EQUIPMENT. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Jul 16, 2025
Addition and/or Alteration · Install the following as per 2017 NEC: 1) (1) new light fixture. 2) (2) New motion sensors. 3) (1) Power wire only grinder pump. 4) (2) power wire HWH. Using existing circuit. 5) (1) new HWH. 6) (2) GFCI’s Install the following as per 2016 NFPA 72: 1- Fire alarm device, strobe
- Issued Jul 11, 2025
Addition and/or Alteration · Install new 800 amp service with grounding, 800 amp MDP, lighting, receptacles, telecommunications wiring, panels and feeders, lighting controls, and provide power to equipment as per 2017 NEC. Install fire alarm as per 2016 NFPA 72.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.