Entity File · The Public Record
Company / LLC
Lf Driscoll Company LLC
31 permits
- Records on file
- 31
Built (as contractor)
31 entries
- Issued Jun 22, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE THE REMOVAL OF DOOR AND INSTALLATION OF AUDIO BOOTH AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP AND FIRE SUPPRESSION WORK.
- Issued Jun 12, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RELOCATION OF PHARMACY TO FIFTH FLOOR OF EXISTING HOSPITAL BUILDING (FOUNDERS) AS PER APPROVED PLANS AND PA DOH APPROVAL. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued May 18, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Apr 9, 2026
1 units
Addition and/or Alteration · FOR THE LEGALIZATION/ERECTION OF PERMANENT TENT STRUCTURE WITH MAXIMUM OCCUPANCY OF 300 PERSONS. SEPARATE PERMITS REQUIRED FOR ANY MEP WORK. *AUTOMATIC SMOKE DETECTION SYSTEM REQUIRED AS PER BBS VARIANCE UNDER MI-2026-000319.*
- Issued Mar 12, 2026
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS TO INCLUDE NEW FINISHES, EQUIPMENT, MILLWORK AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK.
- Issued Mar 5, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO THE 5TH FLOOR OF THE FOUNDERS BUILDING IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PA DOH APPROVAL. FOR USE AS PREVIOUSLY APPROVED. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, AND PLUMBING WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. 05
- Issued Mar 4, 2026
New construction, addition, GFA change · FOR THE ERECTION OF A TRELLIS IN THE YARD OF AN EXISTING MEDICAL FACILITY. SIZE AND LOCATION AS SHOWN ON THE APPLICATION/PLAN.
- Issued Mar 4, 2026
General Earth Disturbance ONLY · For an earth disturbance work as per approved plans. **Exterior work only**
- Issued Feb 26, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS ON THE SECOND FLOOR OF AN EXISTING HOSPITAL BUILDING PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. AMENDMENT APPROVED AS OF 07/01/2026: TO REVISE THE STATEMENT OF SPECIAL INSPECTIONS SCHEDULE FORM TO INCLUDE INSPECTION TYPES "FIR
- Issued Feb 5, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF AN EXISTING HOSPITAL. WORK TO INCLUDE STRUCTURAL UPGRADE FOR MEP INSTALLATION AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**
- Issued Feb 2, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTEIOR ALTERATION TO THE LEVEL 8 & 9 OF AN EXISTING STRUCTURE.FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 27, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Jan 19, 2026
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS (REMOVAL AND REPLACEMENT OF TOPPING SLABS AND DRAINS) AT SPECIFIED LOCATIONS THROUGHOUT THE EXISTING GROUP A-5 OUTDOOR BASEBALL STADIUM (CITIZENS BANK PARK) AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jan 16, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Jan 15, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING HOSPITAL. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Jan 13, 2026
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS TO A PORTION OF AN EXISTING HOSPITAL. ** ALL WORK TO BE DONE PER APPROVED PLANS AND DOH APPROVAL.** IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. **SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**
- Issued Dec 23, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ). ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**AMENDED AS OF 4/1/2026 PER APPROVED PLANS**
- Issued Dec 19, 2025
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS AT VARIOUS LOCATIONS ON LEVELS B, A, 3, 4, 6, 7, AND 8 OF AN EXISTING GROUP I-2 (CONDITION 2) HOSPITAL TO PROVIDE CONNECTIONS TO A NEW PATIENT TOWER ADDITION AT 3501 CIVIC CENTER BLVD (SEE CP-2024-000469). EXISTING BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PA DOH APPROVAL. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DES
- Issued Dec 16, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Dec 15, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION. *AMEND 3/2/2026; REVISED FLOOR PLANS PER AMENDED CONSTRUCTION DOCUMENTS*
- Issued Dec 15, 2025
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO OWNER'S SUITE AND RESTROOMS WITHIN AN EXISTING OUTDOOR BASEBALL STADIUM AS PER APPROVED PLANS. *2018 IEBC REVIEW* **SEPARATE PERMIT REQUIRED FOR ANY WORK**
- Issued Dec 2, 2025
New construction, addition, GFA change · For the addition of an AHU and penthouse space used exclusively for mechanical equipment on the roof of an existing hospital, as per the approved plan, size and location as shown on the plan.
- Issued Nov 24, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE PARTIAL DEMO AND REMOVAL OF LAB GASES AND HOOD SYSTEM AND RELOCATE BIOBANK EQUIPMENTTO EXISTING SPACE, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Nov 19, 2025
1 units
Addition and/or Alteration · FOR THE ERECTION OF AN ADDITION TO EXPAND MERCANTILE AND LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, DOORS, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.
- Issued Nov 19, 2025
Foundation · FOR FOUNDATIONS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR STRUCTURE. *NO EXCAVATION GREATER THAN 5FT, OTHERWISE SEPARATE EXCAVATION PERMIT REQUIRED.*
- Issued Oct 21, 2025
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR STRUCTURAL AND NON-STRUCTURAL DEMOLITION WITHIN AN EXISTING SPORTS STADIUM FOR FUTURE ADDITION AS PER APPROVED PLANS. *2018 IEBC REVIEW*
- Issued Oct 9, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY) TO THE 5TH FLOOR LEVEL OF AN EXISTING HOSPITAL FACILITY . ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS AND PA DOH APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **ASBESTOS REMEDIA
- Issued Sep 30, 2025
1 units
Addition and/or Alteration · FOR THE SELECTIVE DEMOLITION OF ABANDONED MECHANICAL EQUIPMENT AND PIPING ON THE 3RD AND 14TH FLOOR AND ON THE PENTHOUSE; AND FOR THE REMOVAL OF ROOF SYSTEM IN FOUNDERS BUILDING AS PER THE APPROVED PLANS AND PER PA DEPARTMENT OF HEALTH APPROVAL. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 13, 2025
1 units
Addition and/or Alteration · FOR A LEVEL II INTERIOR ALTERATIONS (NO CHANGE IN OCCUPANCY ) TO A PORTION OF AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE SLECTIVE PARTITION DEMOLITION AND THE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT AS PER APPROVED PLANS AND DOH APPROVAL. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING FULLY SPRINKLERED** SEPARATE PERMITS REQUIRED FOR ALL OTHER W
- Issued Aug 13, 2025
1 units
Addition and/or Alteration · NEW CONSTRUCTION FIT-OUT OF LEVELS 16-20 OF A NEW HIGH-RISE HOSPITAL BUILDING (SEE PERMIT CP-2024-000469 FOR CORE AND SHELL APPROVAL) AS PER APPROVED PLANS AND PA DOH APPROVALS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jul 25, 2025
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO GROUND FLOOR AND MEZZANINE LEVELS OF AN EXISTING HIGHER EDUCATIONAL FACILITY (WEIGHTMAN HALL) AS PER APPROVED PLANS AND PHC APPROVAL. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP WORK** AMENDMENT APPROVED 4/30/26 AMEND ALTERATIONS PERMIT CP-2025-003651 FOR RESTORATION OF EXTERIOR DOORS IN LIEU OF REPLACEMENT AS PER APPROVED PLANS AND PHC APPROVAL.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.