- Issued May 13, 2026
Minor Demolition · COMPLETE DEMOLITION OF AN EXISTING DETACHED ONE-STORY, CONCRETE, MASONRY AND WOOD COMMERCIAL BUILDING BY HAND & MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE
- Issued May 1, 2026
5 units
New Construction · NEW CONSTRUCTION OF A THREE (3) STORY BUILDING WITH CELLAR, INTERIOR MEZZANINES AND PRIVATE ROOF DECK WITH PILOT HOUSE FOR USE AS FIVE (5) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE A STANDPIPE SYSTEM PER NFPA 14. SEE PERMIT SP-2026-000136 FOR ASSOCIATED EXCAVATION WORK AND ADJACENT PROPERTY PROTECTIONS. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Mar 31, 2026
Excavation · FOR THE EXCAVATION AND UNDERPINNING TO THE ABUTTING STRUCTURE ASSOCIATED WITH THE NEW CONSTRUCTION. ALL WORK TO BE DONE PER THE APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF WORK. SEPARATE PERMITS REQURIED FOR ALL OTHER WORK. ***********PROTECTION OF ADJACENT STRUCTURES TO BE MAINTAINED DURING EXCAVATION ACTIVITY. SCOPE INCLUDES SPECIAL INSPECTIONS OF STRUCTURAL STABILITY OF ADJACENT STRUCTURES IN ACCORDANCE WITH B-1704.6.4. **********************
- Issued Feb 10, 2026
20 units
New Construction · NEW CONSTRUCTION OF A FOUR (4) STORY BUILDING WITH CELLAR AND COMMON ROOF DECK WITH PILOT HOUSE ACCESS FOR USE AS A SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY) AND TWENTY (20) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. SEE PERMIT SP-2025-001287 FOR ASSOCIATED EXCAVATION WORK. *2018 IBC REVIEW* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
- Issued Jan 21, 2026
Excavation · FOR EXCAVATION AND UNDERPINNING ONLY PER APPROVED PLANS. SEPARATE PEMRITS REQUIRED FOR MEP WORK.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.