Entity File · The Public Record
Company / LLC
P Agnes INC
13 permits
- Records on file
- 13
Built (as contractor)
13 entries
- Issued Jun 29, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Jun 9, 2026
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE CLASSROOM SPACE AND EVENT ASSEMBLY SPACE WITHIN THE BASEMENT AND FIRST FLOOR OF AN EXISTING BUILDING AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued May 14, 2026
1 units
Addition and/or Alteration · LEVEL I EXTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR THE REPLACEMENT OF A DOOR FOR AN EXISTING UTILITY BUILDING AS PER APPROVED PLANS. *2018 IEBC REVIEW*
- Issued Apr 8, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE TRENCHING FOR UTILITIES, NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK*
- Issued Apr 8, 2026
1 units
Addition and/or Alteration · FOR LEVEL 1 INTERIOR ALTERATIONS THROUGHOUT AND STRUCTURAL ALTERATIONS TO ERECT A CATWALK AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL, ELECTRICAL, AND PLUMBING WORK. NO CHANGE TO EXISTING GROUP A-1 OCCUPANCY (UNIVERSITY OF PENNSYLVANIA IRVINE AUDITORIUM).
- Issued Mar 3, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS FOR RENOVATIONS TO EXISTING SECOND FLOOR LAB SPACES PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Dec 10, 2025
1 units
Addition and/or Alteration · FOR RENOVATION TO EXISTING HOLDING ROOM AND BSL SUPPORT ROOM ON THE SECOND FLOOR OF ONE UCITY SQUARE PER APPROVED PLANS. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 30, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO AN EXISTING STRUCTURE FOR THE 5 MAIN BRONCH ROOM RELOCATION. ALTERATIONS TO INCLUDE PARTIAL DEMOLITION, THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
- Issued Sep 19, 2025
1 units
Addition and/or Alteration · FOR INTERIOR ALTERATIONS TO TOILET ROOMS ON THE SECOND FLOOR OF EXISTING UNIVERSITY BUILDING (SCHATTNER BUILDING) PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 17, 2025
Foundation · INSTALLATION OF FOUNDATIONS FOR A PROPOSED SCULPTURE INSTALLATION AS PER APPROVED PLANS. *2018 IBC REVIEW* AMENDMENT 3/11/26 TO CHANGE DPRC-SI
- Issued Sep 16, 2025
1 units
Addition and/or Alteration · FOR LEVEL I ALTERATIONS FOR RENOVATIONS TO ELEVATOR LOBBIES ON 8TH AND 10TH FLOOR TO ACCOMODATE BED LIFT STORAGE UNITS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Aug 25, 2025
1 units
Addition and/or Alteration · LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING UNIVERSITY SAFETY SERVICES BUILDING AS PER APPROVED PLANS. EXISTING BUILDING SPRINKLERED. *2018 IEBC REVIEW* **SEPARATE PERMITS REQUIRED FOR ANY MEP OR FIRE SUPPRESSION WORK**
- Issued Aug 6, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO GROUND FLOOR SPACE G05 IN AN EXISTING STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. ***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.