Rafter Electric, INC
20 permits
- Records on file
- 20
Built (as contractor)
20 entries
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 2 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 2 hydration stations to electricity (replace in kind).
- Issued Jul 6, 2026
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Mar 19, 2026
Addition and/or Alteration · Provide new circuit breakers in panels XPD-MT2 and XPD-MT3. Provide power to receptacles, signage, junction boxes, and power to equipment as per 2017 NEC. All devices and cover plates noted to be relocated shall be replaced with new.
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 2 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 29, 2025
Addition and/or Alteration · Connect 1 hydration stations to electricity (replace in kind).
- Issued Oct 24, 2025
New Construction · INSTALL TEMPORARY ON SITE POWER SOURCE AND CONNECT WIRING TO TRAILER. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
- Issued Oct 16, 2025
Addition and/or Alteration · Connect 2 (two) hydration station(s) to electricity (replace in kind).
- Issued Oct 16, 2025
Addition and/or Alteration · Connect 1 (one) hydration station(s) to electricity (replace in kind).
- Issued Oct 16, 2025
Addition and/or Alteration · Installation of (1) GFCI receptacle.
- Issued Oct 14, 2025
Addition and/or Alteration · Install all lighting and receptacles according to APPROVED DRAWINGS-2017 NEC.
- Issued Jul 26, 2025
Addition and/or Alteration · 1. Install BA control panel w/ associated modules and power supply(supplied by others) 2.Install owner supplied cable to each device per drawing. 3. Terminate in new BA panel in electric closet. 4. Install and terminate all field devices per drawing. Devices supplied by others. 5. Collaborate with Academy Fire and CVS TSS to verify functionality of all new devices. 6. All existing devices shall be removed upon completion of new system. No equipment will be removed until the new system is fully
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.