Entity File · The Public Record
Company / LLC
Reliable Fire & Mechanical, INC.
128 permits
- Records on file
- 128
Built (as contractor)
128 entries
- Issued Oct 26, 2026
Addition and/or Alterations · INSTALLATION OF ONE (1) UL 710 LISTED COMMERCIAL KITCHEN EXHAUST HOOD WITH SUPPLY/EXHAUST TIE-IN TO ONE (1) RETURN AIR FAN, ONE (1) EXHAUST FAN & ALL ASSOCIATED RETURN/EXHAUST DUCTWORK. *2018 IMC REVIEW* **SEPARATE PERMIT SHALL BE REQUIRED FOR INSTALLATION OF AN APPROVED AUTOMATIC FIRE SUPRESSION SYSTEM**
- Issued Oct 23, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE 2 COMMERCIAL KITCHEN EXHAUST HOOD WITH ASSOCIATED EXHAUST FAN, MAKEUP AIR SYSTEM, AND DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2021 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 22, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 10'-0" hood system.
- Issued Oct 14, 2026
Rough-In · Rough-In Permit for FP-2026-001577 Install a NFPA13 wet sprinkler system according to the designed plan.
- Issued Oct 6, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for an existing 12'-0" hood system
- Issued Oct 1, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 4." DC AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Sep 16, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A 8.5' TYPE I KITCHEN HOOD INSTALLTION. **ALL WORK TO BE COMPLETED PER PLAN ** IF FIELD CONDITIONS VARY, PLEASE CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.** IMC 2021**
- Issued Aug 18, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install wet chemical kitchen fire suppression system for an 18' and a 6' hood
- Issued Aug 10, 2026
Addition and/or Alterations · FOR INSTALLATION OF TWO (2) COMMERCIAL KITCHEN TYPE-1 EXHAUST HOODS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATION.
- Issued Aug 6, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 5'-0" hood
- Issued Aug 5, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (5'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Aug 4, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 14'-0" hood.
- Issued Jul 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (14'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Jul 21, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 10'-0" hood
- Issued Jul 16, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) 10'-0" HOOD FOR A RESTAURANT WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK, ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 15, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 7'-0" hood
- Issued Jul 9, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (6'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Jul 6, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 9'-0" hood system
- Issued Jul 3, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Jul 2, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 16'-0" hood system.
- Issued Jul 2, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 13'-6" hood system
- Issued Jul 1, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 12'-0" hood system.
- Issued Jun 30, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jun 26, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (16'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Jun 18, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 8'-6" hood
- Issued Jun 17, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 12'-0" hood in the 1st floor restaurant
- Issued Jun 15, 2026
Addition and/or Alterations · FOR INSTALLATION OF ONE (1) COMMERCIAL KITCHEN EXHAUST HOOD TYPE-1 PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Jun 12, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) 14'-6" HOOD FOR A RESTAURANT WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** SEPARATE FIRE SUPPRESSION PERMIT REQUIRED FOR FIRE EXTINGUISHING SYSTEM**
- Issued Jun 3, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 12'-0" hood
- Issued May 29, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-002511
- Issued May 29, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF AN NFPA 13R SYSTEM FOR A MULTI-FAMILY DWELLING SERVICED BY A TWO (2) INCH FIRE SERVICE LINE WITH A 2-INCH WILKINS 950 XLT2 BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued May 29, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF 12'-0" TYPE I COMMERCIAL KITCHEN HOOD AND ASSOCIATED DUCTWORK AND FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK.
- Issued May 18, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 12'-0" hood
- Issued May 11, 2026
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued May 10, 2026
Addition and/or Alterations · INSTALLATION OF ONE (1) ETL LISTED COMMERCIAL KITCHEN EXHAUST HOOD WITH SUPPLY/EXHAUST TIE-IN TO ONE (1) RETURN AIR FAN, ONE (1) EXHAUST FAN & ALL ASSOCIATED RETURN/EXHAUST DUCTWORK. **SEPARATE PERMIT SHALL BE REQUIRED FOR INSTALLATION OF AN APPROVED AUTOMATIC FIRE SUPRESSION SYSTEM**
- Issued May 4, 2026
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" WILKINS 950XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Apr 29, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 13'-0" hood and type II 7'-0" hood system.
- Issued Apr 23, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 5'-6" hood system.
- Issued Apr 22, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for an 8'-0" hood
- Issued Apr 20, 2026
Addition and/or Alterations · For the installation of a 13'-0" type 1 hood and a 7'-0" type 2 hood with associated ductwork. Other appliances to be installed in accordance with manufacturer specifications. **All work to be performed per approved plans**
- Issued Apr 20, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-000753: FOR THE INSTALLATION OF ONE (1) 5'-6" TYPE I KITCHEN EXHAUST HOOD FOR A RESTAURANT WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK, ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Apr 14, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (8'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Apr 14, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 8'-6" hood
- Issued Apr 14, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 8'-0" hood
- Issued Apr 10, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (8'-6") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Apr 10, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (8'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Apr 9, 2026
1 units
Addition and/or Alteration · FOR LEVEL I INTERIOR ALTERATIONS ASSOCIATED WITH THE INSTALLATION OF COMMERCIAL KITCHEN HOOD FOR THE CHANGE OF OCCUPANCY TO A RESTAURANT (BUSINESS OCCUPANCY) ON THE FIRST FLOOR. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 28, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 13'-0" hood system.
- Issued Mar 26, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 1/2"-INCH AMES COLT 200 BACKFLOW PREVENTER ASSEMBLY AND TWO (2) STANDPIPE RISERS COMPLYING WITH NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 26, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 1/2"-INCH AMES COLT 200 BACKFLOW PREVENTER ASSEMBLY AND TWO (2) STANDPIPE RISERS COMPLYING WITH NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 26, 2026
New Construction · FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH 2 1/2"-INCH AMES COLT 200 BACKFLOW PREVENTER ASSEMBLY AND TWO (2) STANDPIPE RISERS COMPLYING WITH NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Mar 25, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (13'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Mar 18, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 12'-0" hood
- Issued Mar 9, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical fire suppression system for a 22'-0" hood system
- Issued Mar 6, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A 22' TYPE I KITCHEN HOOD WITH ASSOCIATED DUCT WORK. **WORK TO BE PERFORMED PER APPROVED PLAN.**
- Issued Feb 22, 2026
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" WILKINS 95OXLT2 BACKFLOW PREVENTION ASSEMBLY & UL LISTED TALCO 13-ULV50-R FIRE PUMP COMPLYING WITH NFPA 20 AND TWO (2) STANDPIPE RISERS COMPLYING WITH NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Feb 22, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 11'-0" hood
- Issued Feb 12, 2026
Rough-In · Rough-In Permit for FP-2026-000138 To install a new NFPA-13R wet sprinkler system for a 3 family apartment building.
- Issued Feb 12, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (11'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Feb 12, 2026
Addition and/or Alterations · INSTALLATION OF AN AUTOMATIC FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R WITH A FIRE DEPARTMENT CONNECTION, BACKKFLOW PREVENTION DEVICE AND 2" SERVICE LINE, THROUGHOUT A TWO (2) STORY STRUCTURE. SEPARATE PERMIT REQUIRE FOR ALL PLUMBING WORK
- Issued Feb 6, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 10'-0" hood system.
- Issued Feb 4, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 12'-0" hood
- Issued Feb 3, 2026
Addition and/or Alterations · EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for 10'-0" hood system
- Issued Feb 3, 2026
Addition and/or Alterations · FOR INSTALLATION OF ONE (1) COMMERCIAL KITCHEN EXHAUST HOOD TYPE-1 PER APPROVED PLANS.
- Issued Feb 3, 2026
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 12'-0" hood system.
- Issued Jan 31, 2026
Addition and/or Alterations · FOR INSTALLATION OF A TYPE-1 COMMERCIAL KITCHEN EXHAUST HOOD PER APPROVED PLANS AND MANUFACTURER'S RECOMMENDATIONS.
- Issued Jan 2, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (12'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018
- Issued Jan 2, 2026
Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2025-006387
- Issued Dec 29, 2025
1 units
Addition and/or Alteration · FOR INSTALLATION OF KITCHEN EQUIPMENT AND COMMERCIAL KITCHEN EXHAUST HOOD PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.
- Issued Nov 15, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 9'-0" hood system.
- Issued Nov 13, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for 15'-0" hood
- Issued Nov 6, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for 16'+4' hoods system.
- Issued Nov 6, 2025
Addition and/or Alterations · FOR INSTALLATION OF TYPE-1 COMMERCIAL KITCHEN EXHAUST HOOD AND HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSER PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Nov 6, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 6'-0" hood system.
- Issued Nov 5, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF A TYPE 1 COMMERCIAL KITCHEN HOOD (9'-0") AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
- Issued Nov 3, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) 16'-0" AND ONE (1) 4'-0" TYPE I HOOD WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 29, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 10'-0" hood.
- Issued Oct 29, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 26'-8" hood.
- Issued Oct 25, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE 1 COMMERCIAL KITCHEN EXHAUST HOOD WITH ASSOCIATED EXHAUST FAN, MAKEUP AIR SYSTEM, AND DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Oct 21, 2025
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 10 existing sprinkler heads for the renovation of a restaurant.
- Issued Oct 7, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 16'-0" hood
- Issued Oct 6, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) 16'-0" HOOD FOR A RESTAURANT WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ** SEPARATE FIRE SUPPRESSION PERMIT REQUIRED FOR FIRE EXTINGUISHING SYSTEM**
- Issued Oct 1, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for a 8'-0" hood system.
- Issued Oct 1, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical fire suppression system for a 9'-6" hood system.
- Issued Sep 15, 2025
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 & 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" WILKINS 950XTL2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Sep 15, 2025
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 & 13R THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 2" WILKINS 950XTL2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Sep 11, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for 12'-0", 7'-9", and 7'-9" hood systems.
- Issued Sep 10, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install a wet chemical kitchen fire suppression system for a 12'-0" hood
- Issued Sep 10, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical kitchen fire suppression system for a 6'-0" hood
- Issued Sep 9, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE 1 COMMERCIAL KITCHEN EXHAUST HOOD AT THE 3RD FLOOR WITH ASSOCIATED EXHAUST FAN, MAKEUP AIR SYSTEM, AND DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND MANUFACTURER SPECIFICATIONS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Sep 6, 2025
Addition and/or Alterations · FOR INSTALLATION OF ONE (1) COMMERCIAL KITCHEN EXHAUST HOOD TYPE 1 AND ONE (1) COMMERCIAL KITCHEN EXHAUST HOOD TYPE 2 PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.
- Issued Sep 6, 2025
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2.5" DC AMES 2000SS BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Sep 4, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE I COMMERCIAL KITCHEN HOOD AND ASSOCIATED DUCTWORK AND FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR FIRE SUPPRESSION WORK.
- Issued Sep 3, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITION FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK.
- Issued Sep 3, 2025
Rough-In · Rough-In Permit for FP-2025-001758 To install a new NFPA13 wet sprinkler system for a mixed-use building: 1st floor commercial, 2nd to 4th floor residential.
- Issued Sep 3, 2025
Addition and/or Alterations · EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. To install a wet chemical fire suppression system for (5) hoods. Hood 1. A 35'-0" hood system. Hood 2. A 35'-0" hood system. Hood 3. A 12'-0" hood system. Hood 4. A 16'-0" hood system Hood 5. A 18'-0" hood system.
- Issued Sep 2, 2025
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 2" FIRE SERVICE LINE AND 2." DC WILKINS 950 XLT2 BACKFLOW PREVENTION ASSEMBLY AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
- Issued Aug 30, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF ONE (1) TYPE I COMMERCIAL KITCHEN HOOD (8'-0") AND ASSOCIATED DUCTWORK AND FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR FIRE SUPPRESSION WORK.
- Issued Aug 23, 2025
Addition and/or Alterations · FOR THE INSTALLATION OF FIVE (5) TYPE 1 COMMERCIAL KITCHEN HOOD (12', 16', 18', AND TWO 35' LONG HOODS) AND ASSOCIATED DUCTWORK, FANS AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ELECTRICAL AND FIRE SUPPRESSION WORK. **IMC 2018**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 4, 2026.