Entity File · The Public Record
Company / LLC
Russ Kelly & Associates, INC.
7 permits
- Records on file
- 7
Built (as contractor)
7 entries
- Issued Jun 24, 2026
1 units
Addition and/or Alteration · FOR LEVEL II INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE FOR USE AS MERCANTILE OCCUPANCY (SPACE #B1414) WITHIN PHILADELPHIA 30TH STREET TRAIN STATION. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/ FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Mar 25, 2026
1 units
Addition and/or Alteration · LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING STRUCTURE (B-C Connector, Space BC/27-AB (Lafayette’s)) IN TERMINAL B OF THE PHILADELPHIA INTERNATIONAL AIRPORT. ALTERATIONS FOR PARTIAL DEMOLITION AND INTERIOR RENOVATIONS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED
- Issued Dec 29, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS WITH NO CHANGE OF OCCUPANCY. PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
- Issued Dec 16, 2025
1 units
Addition and/or Alteration · INTERIOR ALTERATION TO TWO ROOMS ON L05 OF AN EXISTING STRUCTURE AND CHANGE THE USE OF THEM TO WALK-IN CLOSET AND ACCESSORY STORAGE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**
- Issued Dec 12, 2025
1 units
Addition and/or Alteration · FOR A TENANT FIT-OUT TO AN EXISTING SPACE (SPACE AE-01) FOR A NEW VENDOR AT THE AIRPORT. ALTERATIONS TO INCLUDE THE SELECTIVE DEMOLITION OF EXISTING PARTITIONS AND THE NEW ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. MECHANICAL UPGRADE TO BE INCLUDED AS PART OF THE SCOPE OF WORK. PL
- Issued Aug 1, 2025
1 units
Addition and/or Alteration · FOR ALTERATIONS TO THE PHILADELPHIA INTERNATIONAL AIRPORT ASSOCIATED WITH THE INSTALLATION/REPLACEMENT OF UTILITY WORK FOR PHL-TERMINAL AE, SPACE AE01. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
- Issued Jul 17, 2025
1 units
Addition and/or Alteration · FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. *2018 IEBC*
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.