Entity File · The Public Record
Contractor
Seville Theresa D & Robert
24 permits
- Records on file
- 24
Built (as contractor)
24 entries
- Issued Jun 25, 2026
Addition and/or Alteration · Demo existing Devices and Reinstall, Install 3 Light Fixtures and GFI Receptacle
- Issued Jun 10, 2026
Addition and/or Alteration · Install 4 Speaker/ Strobes & 2 Strobes Only. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued May 5, 2026
Addition and/or Alteration · Install light Fixtures - Exit lights - Emergency lights 1 GFI & 1 Switch All work per approved plans, NEC 2017 ***NO Fire alarm on this Permit****
- Issued Apr 22, 2026
Addition and/or Alteration · Install receptacles, Fixtures, and raceways. PER APPROVED PLANS NEC2017 ***NO FIRE ALARM ON THIS PERMIT.***
- Issued Apr 15, 2026
Addition and/or Alteration · New 400-amp 277/480 Panel - Install VFD's for Chillers 1- 7, Spray Pumps 1 & 2, CWP 1&2 & Pump # 7 - Dedicated Circuit and Receptacles with Heat Trace Cabling as per 2017 NEC.
- Issued Mar 5, 2026
Addition and/or Alteration · Furnish and install a complete fire alarm system, including installation of forty-seven (47) smoke detectors, three (3) duct smoke detectors, forty-one (41) speaker/strobe notification appliances, one (1) magnetic door holder, and five (5) annunciators. Work includes all required fire alarm control equipment, power supplies, wiring, device mounting, terminations, . All work shall be performed in accordance with 2016 NFPA 72, the 2017 NEC, and per approved plans.
- Issued Feb 10, 2026
Addition and/or Alteration · Install 56 duct Detectors - 308 Smoke Detectors - 10 Heat Detectors - 108 Ceiling Strobes - 325 Speaker / Strobes - 11 Wall Strobes - 321 Ceiling Speakers. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Jan 31, 2026
Addition and/or Alteration · Install 2 Door Holder and 1 Relay Module. All work to be done according to the 2017 NEC, 2016 NFPA 72 and per approved plans.
- Issued Dec 24, 2025
Addition and/or Alteration · Install 6 2x2's - 8 High Hats - 1 Under counter light - 4 switches - 8 Receptacles - 150-amp Circuit Breaker . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Dec 23, 2025
Addition and/or Alteration · Install 34 Receptacles - 125 Amp Shunt Trip C B and Enclosure - 150-amp 4 Pole Transfer Switch - Panel EMDP-B & DPP-3 - 2 Mechanical Units .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Dec 23, 2025
Addition and/or Alteration · Install 1 receptacle outlet for each of the 4 bed lifts and 1 receptacle outlet for the automatic door opener. All work to be done according to the 2017 NEC and per approved plans.
- Issued Dec 10, 2025
Addition and/or Alteration · Rework Chillers #1, 2 & 4 with Conduit and Wire - Rework Pumps 8, 9 & 10 with Conduit and Wire - Control Conduit and Wiring for the Same Units - Disconnect and Reconnect EF-4 .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **MP-2025-005087**
- Issued Dec 5, 2025
Addition and/or Alteration · Install 2 Speaker / Strobes - 2 Strobes & Power Supply. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER APPROVED PLANS.
- Issued Nov 20, 2025
Addition and/or Alteration · Install 26 Receptacles - 33 Emergency Outlets - 2 UPS GFI Rec's - Panel RP5TC - 1 Exit - 37 Fixtures - Conduit work for Equipment as per 2017 NEC.
- Issued Nov 15, 2025
Addition and/or Alteration · Install 4 Pull Stations - 8 Duct Detectors - 4 Smokes - 13 Strobes & 11 Speaker/ Strobes as per 2016 NFPA 72.
- Issued Sep 30, 2025
Addition and/or Alteration · Demo Power for Elevators 1,2,3, 4 &5 - Install New Panel P1A and Transformer - Wiring of Sump Pumps and Vapor Light Fixtures- 5 New Disconnects with Relays - Wiring of AHU-1,2,3 &4 - HP 1,2,3 &4 .PER APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT REQ'D**
- Issued Aug 21, 2025
Addition and/or Alteration · Install 108 Fixtures - 5 Exits - 101 Normal Receptacles - 49 Critical Care Receptacles - Raceways and Junction Boxes - 2 Electrical panels with 3 pole 100 amp Breakers in existing Panels for new Feeds - Nurse Call Devices in Exam rooms and Bathrooms . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT IS REQ'D**
- Issued Aug 19, 2025
Addition and/or Alteration · Install 1 Speaker / Strobe , 1 Relocate speaker/strobe, 1 strobe .ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
- Issued Aug 19, 2025
Addition and/or Alteration · INSTALL 60 AMP SUBPANEL AND METER SOCKET. INSTALL 4 LED LIGHTING FOR PARKING LOT. INSTALL TWO DEDICATED CIRCUITS, ONE FOR THE SIGN AND ONE FOR THE PAY KIOSK. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND PER PLANS.
- Issued Jul 28, 2025
Addition and/or Alteration · Install 43 Receptacles, 2 Floor Boxes, 20 Furniture Feeds and Clean and Relamp. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC **NO FIRE ALARM ON THIS PERMIT**
- Issued Jul 24, 2025
Addition and/or Alteration · INSTALL WIRING AND 2 CEILING MOUNTED SPEAKER/STROBES ON THE 17th FLOOR. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Jul 21, 2025
Addition and/or Alteration · Install 16 Speaker Strobes & 12 Strobes as per 2016 NFPA 72.
- Issued Jul 17, 2025
Addition and/or Alteration · Install 2 Ceiling Fire Alarm Speaker/Strobes . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.
- Issued Jul 14, 2025
Addition and/or Alteration · Interior electrical alteration of (7) existing classrooms and new woodshop area. Work to include modifications to existing lighting and will include new light fixtures, power, tele/data. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **SEPARATE FIRE ALARM PERMIT REQ'D**
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated August 1, 2026.