THE INDEX: 84 78 · week of Aug 24permits quiet, openings quiet, deal ledger running hot

The Philadelphia Index

Entity File · The Public Record

Company / LLC

Tracey Mechanical INC

21 permits

Records on file
21

Built (as contractor)

21 entries

  1. Issued Aug 24, 2026

    2301 S Broad St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  2. Issued Aug 18, 2026

    2301 S Broad St

    Alterations · Approved plumbing work associated with an (Addition or Alteration) per EZ Permit Standard for Plumbing

  3. Issued Aug 14, 2026

    1 Citizens Bank Way

    Addition and/or Alterations · **2021 IMC REVIEW** FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  4. Issued Aug 14, 2026

    8350 Enterprise Ave

    Alterations · Approved plumbing repair work per EZ Permit Standard for Plumbing. SEAL (1) 5" LATERAL.

  5. Issued Aug 4, 2026

    201 N 21st St

    Alterations · For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 sh

  6. Issued Jul 29, 2026

    302-12 N 13th St

    Alterations · Plumbing Permit (Interior) for combo CP-2026-004487

  7. Issued Jul 29, 2026

    302-12 N 13th St

    Addition and/or Alterations · Mechanical / Fuel Gas Permit for combo CP-2026-004487

  8. Issued Jun 29, 2026

    240 S Broad St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  9. Issued Jun 23, 2026

    3939 Conshohocken Ave

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. **WORK INCLUDES NEW COOLING TOWER, BOILERS, AND HYDRONIC PIPING**

  10. Issued Jun 10, 2026

    238 E Wyoming Ave

    Alterations · INSTALL OF NEW BOOSTER PUMP AND BACKFLOW PREVENTER

  11. Issued Apr 9, 2026

    1301-25 Chestnut St

    Alterations · CONVERSTION OF OFFICE BUILDING TO 622 UNIT APARTMENT BUILDING ON 6TH THROUGH TWELTH FLOORS. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  12. Issued Mar 18, 2026

    1301-25 Chestnut St

    Alterations · ALTERATIONS TO EXISTING ASSEMBLY SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS

  13. Issued Feb 24, 2026

    200 W Washington Sq

    Addition and/or Alterations · FOR INSTALLATION OF HVAC EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS.

  14. Issued Feb 18, 2026

    200 W Washington Sq

    Alterations · Furnish and install new domestic hot/ cold, sanitary piping for (2) sinks. also (1) drinking fountain.

  15. Issued Feb 11, 2026

    3600 Chestnut St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  16. Issued Feb 10, 2026

    200 W Washington Sq

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*

  17. Issued Jan 28, 2026

    200 W Washington Sq

    Alterations · AMEND PERMIT 1/30/2026 TO CORRECT ADDRESS. Furnish an install (2) new sinks. and (1) drinking fountain

  18. Issued Oct 2, 2025

    1650 Market St

    Addition and/or Alterations · FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  19. Issued Sep 23, 2025

    22-34 S 17th St

    Addition and/or Alterations · FOR THE INSTALLATION OF HVAC APPLIANCES, GRDs, EXHAUST FANS, AND ASSOCIATED DUCTWORK THROUGHOUT OFFICES AT THE 5TH, 6TH, 9TH, 10TH, 11TH, AND 12TH FLOORS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2025-003879 FOR ASSOCIATED BUILDING PERMIT.

  20. Issued Jul 31, 2025

    2275 Bridge St

    Alterations · furnish and install new domestic supply lines, sanitary, waste, vent piping to bathroom fixtures including (1) safety eyewash. also new natural gas line to lab tables.

  21. Issued Jul 23, 2025

    714 Market St

    Alterations · Renovation of existing bathroom in a temp real estate office space. new domestic water , sanitary, waste, vent piping to 7 new fixtures.

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 18, 2026.