Owner of record: Kostik Melissa
The docket
88 entries
- Issued Jun 12, 2026
Permit issued — New Construction or Additions
Plumbing Permit for combo SP-2026-000688 · contractor: JOSEPH D CRINITI
- Issued Jun 11, 2026
Permit issued — Sitework with Onsite Utility Services
SITWEORK ASSOCIATED WITH UTILITY INSTALLATION FOR PROPOSED RESIDENTIAL DEVELOPMENT AS PER APPROVED PLANS. *2018 IBC REVIEW* · contractor: AG National Development Inc
- Issued May 22, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012515 · contractor: Refail Tota
- Issued May 22, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012516 · contractor: Refail Tota
- Issued May 22, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012521 · contractor: Refail Tota
- Issued May 22, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012514 · contractor: Refail Tota
- Issued May 22, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012522 · contractor: Refail Tota
- Issued May 22, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012517 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 22, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012517 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012514 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012516 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012517 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012511 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012511 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012515 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012513 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012514 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012512 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012515 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012514 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012516 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012515 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012518 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012513 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012518 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012512 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012513 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012518 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012512 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012511 · contractor: OK PLUMBING LLC
- Issued May 21, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012516 · contractor: OK PLUMBING LLC
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012517 · contractor: Refail Tota
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012520 · contractor: CALLISTO ENERGY MANAGEMENT CORPORATION
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012511 · contractor: Refail Tota
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012522 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012518 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012519 · contractor: CALLISTO ENERGY MANAGEMENT CORPORATION
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012519 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012516 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012515 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012521 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012518 · contractor: Refail Tota
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012514 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012513 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012520 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012512 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012512 · contractor: Refail Tota
- Issued May 12, 2026
Permit issued — New Construction
Mechanical / Fuel Gas Permit for combo RP-2025-012513 · contractor: Refail Tota
- Issued May 12, 2026
Permit issued — New Construction
Electrical Permit for combo RP-2025-012511 · contractor: XCELLCABLE INSTALLATION INC
- Issued May 12, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012517 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012520 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012521 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012521 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012522 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012522 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012521 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012520 · contractor: OK PLUMBING LLC
- Issued Apr 29, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012522 · contractor: OK PLUMBING LLC
- Issued Apr 28, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012519 · contractor: OK PLUMBING LLC
- Issued Apr 28, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Interior) for combo RP-2025-012519 · contractor: OK PLUMBING LLC
- Issued Apr 28, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Exterior Building Drainage) for combo RP-2025-012519 · contractor: OK PLUMBING LLC
- Issued Apr 28, 2026
Permit issued — New Construction or Additions
Plumbing Permit (Water Distribution) for combo RP-2025-012520 · contractor: OK PLUMBING LLC
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012516 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012514 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012515 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012517 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012519 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012520 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012522 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012513 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012518 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012511 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012512 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Apr 1, 2026
Permit issued — Excavation
Site / Utility Permit for RP-2025-012521 · contractor: J D FEDELE CONSTRUCTION DEMOLITION INC · 1 units
- Issued Feb 2, 2026
Permit issued — Addition and/or Alteration
Installation of 100 AMP Service Only temp power outside for construction work · contractor: XCELLCABLE INSTALLATION INC
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 21, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 20, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 20, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
- Issued Jan 20, 2026
Permit issued — New Construction
FOR THE ERECTION OF A TWO (2) STORY DETACHED STRUCTURE OF TYPE V-B CONSTRUCTION WITH PARTIAL BASEMENT, ONE (1) INTERIOR PARKING SPACE, AND ONE (1) EXTERIOR SURFACE PARKING. FOR USE AS A SINGLE-FAMILY DWELLING. HEIGHT NTE 38 FT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR EXCAVATION, MECHANICAL, ELECTRICAL, AND PLUMBING. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND E · contractor: AG National Development Inc · 1 units
Nearby on the record
Other addresses in 19128 with recent activity on the public record.
The 19128 dashboard →The Dearnley Park dashboard →Every recent record in 19128 →
Track this parcel
We'll flag the next deed, permit, or violation on the record here — including any sheriff-sale filing — usually before the neighbors know.
Sources: Phila. Dept. of Records (deeds), L&I (permits, licenses & violations), Dept. of Revenue (tax delinquencies). Data reflects the public record as of our last weekly ingest; last activity on file June 12, 2026. Verify independently before relying on it.