Entity File · The Public Record
Company / LLC
A & S Sprinkler CO INC
166 permits
- Records on file
- 166
Built (as contractor)
166 entries
- Issued Oct 22, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (3) SPRINKLER HEADS, PER NFPA 13
- Issued Oct 22, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (146) SPRINKLER HEADS, PER NFPA 13
- Issued Oct 22, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (33) SPRINKLER HEADS ON THE 2nd & 4th FLOOR
- Issued Oct 21, 2026
Addition and/or Alterations · For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- Issued Oct 21, 2026
Addition and/or Alterations · For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans.
- Issued Oct 21, 2026
Addition and/or Alterations · For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. CP-2025-005924
- Issued Oct 21, 2026
Addition and/or Alterations · For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. CP-2026-001377
- Issued Oct 21, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF AN AUTOMATIC WET SPRINKLER SYSTEM IN ACCORDANCE WITH NFPA 13 THROUGHOUT A ONE (1) STORY STRUCTURE COMMERCIAL SPACE(S), SERVED BY A SIX INCH (6") FIRE SERVICE LINE WITH A SIX INCH (6") BACKFLOW PREVENTION ASSEMBLY AND FIRE DEPARTMENT CONNECTION. SEPARATE PERMITS REQUIRED FOR ANY PLUMBING AND ELECTRICAL WORK
- Issued Oct 21, 2026
Addition and/or Alterations · For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. CP-2026-005046
- Issued Oct 20, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF NEW SPRINKLER HEADS INCLUDING RELOCATION OF EXISTING SPRINKLER HEADS OF AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 AS PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
- Issued Oct 1, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (28) SPRINKLER HEADS, PER NFPA 13
- Issued Oct 1, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS, PER NFPA 13
- Issued Oct 1, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (108) SPRINKLER HEADS, PER NFPA 13
- Issued Sep 29, 2026
Addition and/or Alterations · FOR THE INSTALLATION OF 170 NEW PENDENT SPRINKLERS TO AN EXISTING FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING. AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
- Issued Sep 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (4) SPRINKLER HEADS, PER NFPA 13
- Issued Sep 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRINKLER HEADS, PER NFPA 13
- Issued Sep 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (44) SPRINKLER HEADS, PER NFPA 13
- Issued Sep 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13
- Issued Sep 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (101) SPRINKLER HEADS ON THE 6TH & 7TH FLOORS
- Issued Sep 21, 2026
Rough-In · Rough-In Permit for FP-2026-001952 DEMO WET SPRINKLER SYSTEM ON LOWER LEVEL. INSTALL NEW WET SPRINKLER PIPING & HEADS TO ACCOMMODATE NEW FITOUT AND CEILINGS AS PER NFPA 13 AND LOCAL CODES
- Issued Sep 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (75) SPRINKLER HEADS ON THE 20TH FLOOR, PER NFPA 13
- Issued Sep 16, 2026
Rough-In · Rough-In Permit for FP-2026-000667 Install new wet sprinkler piping & heads to protect new residential apartments and loft units throughout entire floor on floors 6th-12th, per NFPA 13 and Philadelphia Fire Codes.
- Issued Sep 15, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (24) SPRINKLER HEADS IN SUITE 102 "BUKA DERM", PER NFPA 13
- Issued Sep 14, 2026
Addition and/or Alterations · TO RELOCATE EXISTING SPRINKLER HEADS TO ACCOMODATE NEW TENANT LAYOUT AS PER NFPA 13 STANDARD AND THE EXISTING BRANCH LINES AND MAIN TO REMAIN. TO INSTALL NEW DOUBLE INTERLOCK PRE-ACTION STAND ALONE SYSTEM TO PROTECT UPS/ MDF ROOM PER APPROVED PLANS.
- Issued Sep 14, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (2) SPRINKLER HEADS IN UNIT 2502
- Issued Sep 8, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (86) SPRINKLER HEADS ON THE 28TH FLOOR, PER NFPA 13
- Issued Sep 8, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (57) SPRINKLER HEADS ON THE 33RD FLOOR, PER NFPA 13
- Issued Aug 26, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (80) existing sprinkler heads on the 4th & 5th floors, per NFPA 13
- Issued Aug 19, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (3) sprinkler heads, per NFPA 13
- Issued Aug 19, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (10) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 29, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (37) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (5) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (97) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (10) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (49) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (1) SPRINKLER HEAD, PER NFPA 13
- Issued Jul 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (16) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (22) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (19) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 9, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (3) existing sprinkler heads, per NFPA 13
- Issued Jul 9, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (3) sprinkler heads, per NFPA 13
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (68) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (95) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (9) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 7, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (13) SPRINKLER HEADS, PER NFPA 13
- Issued Jul 2, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (12) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 29, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS ON THE 5TH FLOOR, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (23) SPRINKLER HEADS ON THE 16TH FLOOR
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (33) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (18) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (133) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (6) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 23, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRINKLER HEADS ON THE 15TH FLOOR
- Issued Jun 22, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (23) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (3) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 15, 2026
Addition and/or Alterations · INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE SECOND FLOOR OF THE BUILDING (ONLY) TO INCLUDE 2 INCH MAIN FIRE SERVICE LINE WITH A 2-1/2 INCH AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA. **SEE AP-2026-000231 FOR RELATED CO TO FOLLOW COMPLETION OF THIS WORK** **A SEPARATE COMMERCIAL BUILDING PERMIT IS REQUIRED FOR ANY ALTERATIONS WORK REQUIRED IN ASSOCIAT
- Issued Jun 15, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (22) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 15, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRINKLER HEADS ON THE 15TH FLOOR, PER NFPA 13
- Issued Jun 10, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (91) SPRINKLER HEADS ON THE 30TH FLOOR, PER NFPA 13
- Issued Jun 10, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (133) SPRINKLER HEADS ON THE 14TH FLOOR, PER NFPA 13
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (231) SPRINKLER HEADS ON THE 5TH FLOOR, PER NFPA 13
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (88) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (5) SPRINKLER HEADS, PER NFPA 13
- Issued Jun 4, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (6) SPRINKLER HEADS, PER NFPA 13
- Issued May 28, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (65) SPRINKLER HEADS, PER NFPA 13
- Issued May 28, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (4) sprinkler heads, per NFPA 13
- Issued May 26, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (125) SPRINKLER HEADS ON THE 7TH FLOOR, PER NFPA 13
- Issued May 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (177) SPRINKLER HEADS, PER NFPA 13
- Issued May 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (32) SPRINKLER HEADS, PER NFPA 13
- Issued May 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (2) HEADS, PER NFPA 13
- Issued May 21, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (10) SPRINKLER HEADS, PER NFPA 13
- Issued May 18, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (86) SPRINKLER HEADS ON THE 15TH FLOOR, PER NFPA 13
- Issued May 14, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS, PER NFPA 13 AND LOCAL CODES
- Issued May 5, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (3) SPRINKLER HEADS, PER NFPA 13
- Issued May 5, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (9) SPRINKLER HEADS, PER NFPA 13
- Issued May 5, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 35 SPRINKLER HEADS, PER NFPA 13
- Issued May 5, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (36) SPRINKLER HEADS, PER NFPA 13
- Issued Apr 29, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (42) SPRINKLER HEADS AS PER NFPA 13 IN UNIT #110
- Issued Apr 27, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (35) SPRINKLER HEADS, PER NFPA 13
- Issued Apr 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRINKLER HEADS, PER NFPA 13
- Issued Apr 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (19) SPRINKLER HEADS IN SUITE# 950, PER NFPA 13
- Issued Apr 13, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate (12) sprinkler heads in suite 720, per NFPA 13
- Issued Apr 6, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. *CP-2026-001564* RELOCATE (13) SPRINKLER HEADS ON THE 15TH FL, SUITE 1510 AS PER NFPA 13
- Issued Mar 26, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (19) SPRINKLER HEADS AS PER NFPA 13
- Issued Mar 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE 20 SPRINKLER HEADS, PER NFPA 13
- Issued Mar 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (15) SPRINKLER HEADS, PER NFPA 13
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (54) SPRINKLER HEADS AS PER NFPA 13
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (13) SPRINKLER HEADS, PER NFPA 13
- Issued Mar 17, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (8) SPRNKLER HEADS ON THE 4TH FLOOR AS PER NFPA
- Issued Mar 9, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (14) SPRINKLER HEADS, PER NFPA 13
- Issued Feb 26, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 20 existing sprinkler heads to accommodate new wall and ceiling layouts.
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (19) SPRINKLER HEADS IN SUITE 1230 AS PER NFPA 13
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (133) SPRINKLER HEADS ON THE 26TH FLOOR, PER NFPA 13
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (20) SPRINKLER HEADS ON THE 15TH & 16TH FLOORS AS PER NFPA 13
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (32) SPRINKLER HEADS ON THE 14TH FLOOR, PER NFPA 13
- Issued Feb 24, 2026
Addition and/or Alterations · EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. RELOCATE (116) SPRINKLER HEADS ON THE 14TH FLOOR, PER NFPA 13
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated November 3, 2026.