  1. Issued Aug 27, 2026

    9307 Krewstown Rd

    Addition and/or Alteration · HORIZONTAL CABLING: • Provide labor to install twenty-five (25) flush mount dual Category 6 locations. • Provide labor to install one (1) surface mount single Category 6 wireless access point location. • Provide labor to install sixteen (16) single Category 6 camera locations. These cables will be left unterminated and coiled at teach end for final terminations/connections by others. • Provide labor to install four (4) flush mount in-room dual Category 6 locations. • Provide labor to install fiv

  2. Issued Aug 19, 2026

    1001-41 Walnut St

    Addition and/or Alteration · STATEMENT OF WORK: DEMO: •Provide labor to demo existing cable plant in 3 Main and 3 Thompson. HORIZONTAL CABLING: Cabling will be CommScope Category 6A plenum rated 4-pair and CommScope RG6 quad shield plenum rated coax. •Provide and install eighteen (18) surface mount single Category 6A camera locations.•Provide and install ten (10) surface mount single Category 6A RTLS locations.•Provide labor to install ten (10) customer-provided RTLS devices.•Provide and install eight (8) single Category 6A

  3. Issued Aug 5, 2026

    1845 Walnut St

    Addition and/or Alteration · HORIZONTAL CABLING: • Provide labor to install thirty-one (31) flush mount dual Category 6 locations. • Provide labor to install three (3) surface mount single Category 6 wireless access point locations. • Provide labor to install three (3) single Category 6 camera locations. These cables will be left unterminated and coiled at teach end for final terminations/connections by others. • Provide labor to install three (3) single Category 6 intercom locations. These cables will be left untermin

  4. Issued Jul 23, 2026

    3216-60 N Broad St

    Addition and/or Alteration · HORIZONTAL CABLING: Cabling will be Superior/Essex Category 6+ plenum rated 4-pair for network applications and Superior/Essex Category 6A plenum rated 4-pair for wireless applications. •Provide and install one hundred twenty-five (125) flush mount dual locations. •Provide and install sixteen (16) single wall phone locations. •Provide and install twelve (12) surface mount single wireless access point locations. •Provide labor to install twelve (12) customer-provided wireless access points. •Pro

  5. Issued May 26, 2026

    22-34 S 17th St

    Addition and/or Alteration · Furnish and Install 209 Category 6A plenum data cables to be used for voice and data. Terminate, test and label all new cabling

  6. Issued Apr 21, 2026

    7500 Central Ave

    Addition and/or Alteration · STATEMENT OF WORK: HORIZONTAL CABLING: Cabling will be Superior/Essex Category 6A plenum rated 4-pair and CommScope RG6 quad shield plenum rated coax.. • Provide labor to demo/remove all Category 5/6/6A cables in scope area. Demo scope for this project includes removal of existing wall mount bracket and surface mount boxes for existing horizontal cabling in the existing IDF. • Provide and install two (2) flush mount quad Category 6A locations. • Provide and install nine (9) flush mount

  7. Issued Apr 16, 2026

    1101-11 Market St

    Addition and/or Alteration · HORIZONTAL CABLING: Cabling will be CommScope Category 6A plenum rated 4-pair and CommScope RG6 quad shield plenum rated coax. • Provide and install two (2) surface mount single Category 6A access control panel locations. • Provide and install twenty-two (22) surface mount single Category 6A camera locations. • Provide and install one (1) surface mount single Category 6A emergency phone location. • Provide and install one (1) surface mount single Category 6A Int DS location. • Provide and instal

  8. Issued Apr 15, 2026

    34-40 S 11th St

    Addition and/or Alteration · DEMO: • Provide labor to remove existing cabling from workstations and coil for re-use, or leave coiled on tray and labeled for future use on 5th Floor. • Provide labor to remove existing cabling from workstations and coil for re-use, or leave coiled on tray and labeled for future on 6th Floor. HORIZONTAL CABLING: New cabling will be Superior/Essex Category 6A plenum rated 4-pair. • Provide labor to reinstall one hundred forty-three (143) cables coiled in ceiling on the 5th Floor, provide

  9. Issued Apr 9, 2026

    3500 Civic Center Blvd

    Addition and/or Alteration · HORIZONTAL CABLING: Install Cabling will be Berk-Tek LANmark 2000 Category 6 plenum rated 4-pair. • Provide and install five (5) flush mount dual locations. • Provide and install one (1) flush mount quad location. • Provide and install Siemon faceplates and modular jacks as required for termination of the 4-pair cables at the workstation location. • Provide and install one (1) Siemon Category 6 48-port patch panel. This will be installed at the appropriate closet location for termination o

  10. Issued Mar 31, 2026

    2005 Market St

    Addition and/or Alteration · STATEMENT OF WORK: HORIZONTAL CABLING: • Based on cable take-off list provided by Preferred Comm Tech, Bluestone has included the installation of one hundred eighty-five (185) Category 6 network cables and twelve (12) Category 6A cables for wireless access points. Counts include additional cables for 7th Floor. • Provide labor to install twelve (12) customer-provided wireless access points. • Provide labor to install thirty-five (35) customer-provided room schedulers and patch cords. • Provide l

  11. Issued Mar 9, 2026

    3401 Civic Center Blvd

    Addition and/or Alteration · Install telecommunication system infrastructure on the 3rd, 4th, 6th, and 7th floors. Work includes installation of low-voltage cabling, data/communication outlets, jacks, terminations, and associated pathway supports as required to serve each floor. All work shall be installed in accordance with the 2017 NEC and per approved plans. Amendment: Install six (6) additional CAT 6A data cables to serve the conference room and office. Work includes routing, supporting, terminating, and testing of a

  12. Issued Feb 24, 2026

    1614 N 20th St

    New Construction · HORIZONTAL CABLING: Cabling will be BerkTek Category 6 plenum rated 4-pair and Belden RG6 quad shield plenum rated coax for TV applications. • Provide and install three (3) flush mount single locations. • Provide and install one (1) floor mount single location. • Provide and install one (1) flush mount wall phone location. • Provide and install twenty-four (24) flush mount dual location. • Provide and install sixteen (16) furniture dual locations. • Provide and install two (2) flush mount

  13. Issued Feb 17, 2026

    1 Citizens Bank Way

    Addition and/or Alteration · STATEMENT OF WORK: FIBER CABLING: • Provide labor to install 288-strand singlemode non-armored ribbon fiber optic cable from the Head End to Comm Rooms 3.12.04, 3.37.03, 5.37.04, 5.08.03, 5.22.04 and North Tunnell IDF. • Provide labor to install of 6-strand fiber/conductor composite cable from Comm Rooms 3.12.04, 3.37.03, 5.37.04, 5.08.03, 5.22.04 and North Tunnell IDF as required out to twenty-seven (27) remote locations. • Provide labor to install the following equipment as required to fa

  14. Issued Jan 26, 2026

    5548-54 Chestnut St

    Addition and/or Alteration · HORIZONTAL CABLING: Cabling will be CommScope Category 6 plenum rated 4-pair. • Provide and install one (1) single wall phone location. • Provide and install fifty-six (56) furniture mount single locations. • Provide and install twenty-three (23) flush mount dual locations. • Provide and install ten (10) flush mount single TV locations. • Provide and install thirty-six (36) flush mount single locations. • Provide and install twelve (12) flush mount quad locations. • Provide and install ten (1

  15. Issued Jan 7, 2026

    1800 Arch St

    Addition and/or Alteration · • Current furniture layout has one hundred seventy-six (176) Category 6A shielded cables that are available to be relocated. Approximately one hundred eight (108) cables will be relocated to accommodate the new furniture layout. • We will install one hundred and eight (108) new Category 6A shielded cables for furniture, column and floor mount locations. Eighty-four (84) of these Category 6A shielded cables will be installed to the 12th Floor West IDF. The twenty-four (24) floor mount cables

  16. Issued Jan 6, 2026

    1835 Market St

    Addition and/or Alteration · HORIZONTAL CABLING: Cabling will be Belden Category 6 plenum rated 4-pair and Belden RG6 quad shield plenum rated coax. • Provide and install fifty-three (53) flush mount dual Category 6 locations. • Provide and install one hundred thirty-one (131) furniture mount single Category 6 locations. • Provide and install fifteen (15) surface mount single Category 6 room scheduler locations. Cables will be dressed down to the device. • Provide and install twenty-seven (27) surface mount single Categ

  17. Issued Oct 29, 2025

    3401 Civic Center Blvd

    Addition and/or Alteration · HORIZONTAL CABLING: Cabling will be Berk-Tek LANmark 2000 Category 6 plenum rated 4-pair. • Provide labor to demo existing low voltage infrastructure and security devices from work space. • Provide and install six (6) flush mount single locations. • Provide and install four (4) surface mount single camera locations. • Provide and install one (1) surface mount single pneumatic tube location. • Provide and install eleven (11) flush mount dual locations. • Provide and install one (1) dual wire

  18. Issued Oct 16, 2025

    3102-18 W Abbottsford Ave

    Addition and/or Alteration · Fiber Optic Scope of Work • Provide labor and material to install nine (9) 20x20x8” junction boxes w/ backboard and heater units at locations shown on provided prints. • Provide labor and material to install one (1) 06-strand single mode fiber optic cable between ten (10) communication points shown on the provided prints. • Provide labor and material to install fiber optic housings w/ 12-port LC single mode coupler panels at each location. • Provide labor to prep 06-strand fiber optic cables an

  19. Issued Aug 4, 2025

    7701r Burholme Ave

    Addition and/or Alteration · INSTALL TELECOMMUNICATIONS WIRING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.

Track this owner

We'll flag their next deal, permit, or filing — usually before the neighbors know.

Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated September 16, 2026.