Entity File · The Public Record
Company / LLC
Eagle Electrical Construction CO INC
363 permits
- Records on file
- 363
Built (as contractor)
363 entries
- Issued Jul 9, 2026
Addition and/or Alteration · Wiring throughout install light fixtures, outlets, switches, smoke detectors, Grounding system Residential Service Equipment not exceeding a rating of 200 amps WITH NO INCREASE IN SERVICE SIZE INCLUDING AN EMERGENCY DISCONNECT as per attached Residential Service Equipment EZ Standard
- Issued Jul 8, 2026
Addition and/or Alteration · Adding new light fixtures, outlets, switches, exit signs ,emergency lights, fire alarm as per new fit out plans. -NOTED: TAMPER RESISTANT RECEPTS REQ"D THROUGHOUT(SEE NOTE 5)-
- Issued Jul 8, 2026
Addition and/or Alteration · Rewire house (fishing) to bring it up to code, layout not changing
- Issued Jul 8, 2026
Addition and/or Alteration · INSTALL NEW LIGHTS, SWITCHES AND OUTLETS IN LIVING ROOM AND THREE BEDROOMS.
- Issued Jul 6, 2026
New Construction · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued Jul 1, 2026
Addition and/or Alteration · Install service equipment with grounding. Wire throughout. Install light fixtures, outlets, switches, smoke alarms, emergency lights, and exit signs as per 2017 NEC. Install fire alarm system . ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA72. -NOTED-NOTIFICATION APPLIANCES IN BASEMENT COMMON AREAS.
- Issued Jul 1, 2026
Addition and/or Alteration · INSTALL 200AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTORS, GROUNDING
- Issued Jun 27, 2026
Addition and/or Alteration · INSTALL 400 AMP ELECTRICAL SERVICE AND 4 METER PACKS WITH PROPER GROUNDING AND BONDING. INSTALL ONE 100 AMP SUBPANELS FOR HOUSE AND ONE 125 AMP SUBPANEL FOR EACH OF THE 3 DWELLING UNITS. INSTALL WIRING, LIGHTING, SWITCHES, EXIT SIGNS, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS. INSTALL INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
- Issued Jun 26, 2026
Addition and/or Alteration · INSTALL 100 AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTORS, GROUNDING SYSTEM.
- Issued Jun 25, 2026
New Construction · Electrical Permit for combo RP-2025-012865
- Issued Jun 24, 2026
Addition and/or Alteration · INSTALL 100 AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTORS, GROUNDING SYSTEM.
- Issued Jun 23, 2026
New Construction · Install 400 amp Main service, wiring throughout, install light fixtures, outlets, switches, smoke alarm, Grounding system as per NEC, Fire alarm system. ***ALL WORK PER APPROVED PLANS***
- Issued Jun 23, 2026
New Construction · Install 600A service & equipment with grounding. Wire throughout. Install light fixtures, outlets, switches, smoke alarms, emergency lights, and exit signs . Install fire alarm system. ALL WORK IS TO BE DONE as per APPROVED DRAWINGS-2017 NEC, 2016 NFPA 72.
- Issued Jun 23, 2026
New Construction · Electrical Permit for combo RP-2026-005141
- Issued Jun 23, 2026
New Construction · Electrical Permit for combo RP-2026-005140
- Issued Jun 23, 2026
Addition and/or Alteration · INSTALL 1200 AMP ELECTRICAL SERVICE, METER SOCKETS AND CIRCUIT BREAKER PANELS WITH PROPER GROUNDING AND BONDING. REWIRE THE 4 DWELLING UNITS THROUGHOUT AND INSTALL LIGHTING, SWITCHES, EXIT SIGNS, EMERGENCY LIGHTING AND RECEPTACLE OUTLETS. INSTALL 120 VOLTS INTERCONNECTED SMOKE AND CO ALARMS. INSTALL FIRE ALARM SYSTEM. ALL WORK TO BE PERFORMED ACCORDING TO THE 2017 NEC, 2016 NFPA AND PER APPROVED PLANS.
- Issued Jun 23, 2026
New Construction · Electrical Permit for combo RP-2026-003694
- Issued Jun 23, 2026
New Construction · Electrical Permit for combo RP-2026-005138
- Issued Jun 16, 2026
New Construction · INSTALL SERVICE EQUIPMENT, WIRING THROUGHOUT, INSTALL OUTLETS, SWITCHES, LIGHT FIXTURES,SMOKE ALARMS, EMERGENCY LIGHTS, EXIT SIGNS, POWER FOR FIRE PUMP, POWER FOR ELEVATOR, FIRE ALARM SYSTEM,RESCUE ASSISTANCE SYSTEM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
- Issued Jun 12, 2026
Addition and/or Alteration · kitchen rewire, half bath and laundry rewire living/dining outlets and lights
- Issued Jun 12, 2026
Addition and/or Alteration · Electrical Permit for combo RP-2026-005903
- Issued Jun 12, 2026
Addition and/or Alteration · INSTALL 200AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE ALARMSS, GROUNDING
- Issued Jun 12, 2026
Addition and/or Alteration · INSTALL 200 AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTORS, GROUNDING SYSTEM.
- Issued Jun 12, 2026
Addition and/or Alteration · INSTALL 200 AMP SERVICE ,WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES ,OUTLETS, SWITCHES ,SMOKE DETECTORS , GROUNDING SYSTEM.
- Issued Jun 12, 2026
Addition and/or Alteration · INSTALL 200 AMP SERVICE ,WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES ,OUTLETS, SWITCHES ,SMOKE DETECTORS , GROUNDING SYSTEM.
- Issued Jun 5, 2026
Addition and/or Alteration · Install 200 amp service, wiring throughout, install light fixtures, outlets, switches, smoke detectors, grounding system.
- Issued Jun 4, 2026
Addition and/or Alteration · INSTALL 200 AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTORS, GROUNDING SYSTEM.
- Issued Jun 3, 2026
Addition and/or Alteration · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued Jun 2, 2026
Addition and/or Alteration · WIRING FOR NEW ½ BATHROOM IN 1ST FLOOR, INSTALL DEDICATED CIRCUIT, GROUND FAULT OUTLET, INSTALL LIGHT FIXTURES, BATHROOM FAN
- Issued Jun 1, 2026
New Construction · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued Jun 1, 2026
New Construction · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued May 30, 2026
New Construction · Install 600 Amp main service, 6-gang meter socket, (5) 125-amp panels, (1) 100-amp house panel. Wiring throughout the building. Install switches, lighting, outlets, GFCI receptacles, emergency lights, exit signs, smoke/CO alarms, and grounding system as per 2017 NEC.
- Issued May 28, 2026
New Construction · INSTALLATION OF 600 AMP SERVICE. INTERIOR WIRING OF 5 DWELLING UNITS AND COMMON AREAS. INSTALLATION OF A TWO-WAY COMMUNICATION SYSTEM INSTALLATION OF A FIRE ALARM SMOKE DETECTORS INSTALLED FOR DOOR RELEASE MAGNETIC DOOR RELEASE INSTALLED FOR HORIZONTAL EXITS DOORS PHASE CONVERTER INSTALLED ON ROOF. ALL WORK PER APPROVED PLANS
- Issued May 28, 2026
Rough-In · Rough-In Permit for EP-2026-003976 Install electrical service, including meter packs, complete with proper grounding and bonding, install power for fire pump, Install generator, Install all required branch circuit wiring, including: Interior and exterior lighting fixtures, light switches, receptacle outlets, exit signs and emergency lighting. Install interconnected smoke alarms and carbon monoxide (CO) alarms. Furnish and install a complete fire alarm system, including all required devices, wi
- Issued May 27, 2026
New Construction · Electrical Permit for combo RP-2025-008164 EZELEC - NEW SERVICE ELECTRICAL WIRING/DEVICES THROUGHOUT AS PER 2017 NEC. Deviations from the EZ Permit standards require submission of construction plans.
- Issued May 22, 2026
Addition and/or Alteration · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued May 21, 2026
Addition and/or Alteration · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued May 20, 2026
Addition and/or Alteration · Install 200 amp service wiring throughout install light fixtures, outlets, switches, smoke detectors, Grounding system as per NEC 2017
- Issued May 20, 2026
New Construction · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued May 20, 2026
New Construction · INSTALL 200 AMP, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTOR, GROUNDING SYSTEM.
- Issued May 18, 2026
New Construction · Install 300 amp service equipment and grounding. Wiring throughout the building. Install light fixtures, outlets, switches, smoke/CO alarms, emergency lights, and exit signs as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72.
- Issued May 14, 2026
Addition and/or Alteration · INSTALL 200AMP SERVICE, WIRING THROUGHOUT, INSTALL LIGHT FIXTURES, OUTLETS, SWITCHES, SMOKE DETECTORS, GROUNDING
- Issued May 12, 2026
New Construction · Install service equipment with grounding. Wire throughout. Install light fixtures, outlets, switches, smoke alarms, emergency lights, and exit signs as per 2017 NEC. Install fire alarm system as per 2016 NFPA 72.
- Issued May 11, 2026
New Construction · INSTALL 600 AMP SERVICE WITH GROUNDING. WIRING THROUGHOUT. INSTALL LIGHT FIXTURES, RECEPTACLES, SWITCHES, SMOKE ALARMS, EMERGENCY LIGHTS, EXIT SIGNS AS PER 2017 NEC. INSTALL FIRE ALARM SYSTEM AS PER 2016 NFPA 72. ALL WORK IS TO BE DONE ACORDING TO APPROVED DRAWINGS.
- Issued May 8, 2026
Addition and/or Alteration · Install 100amp service wiring throughout install light fixtures, outlets, switches, smoke detectors, Grounding system as per NEC.
- Issued May 8, 2026
Addition and/or Alteration · Install 100amp service wiring throughout install light fixtures, outlets, switches, smoke detectors, Grounding system as per NEC 2017
- Issued May 7, 2026
New Construction · INSTALL 800 AMP SERVICE ,WIRING THROUGHOUT ,INSTALL LIGHT FIXTURES ,OUTLETS, SWITCHES ,SMOKE ALARMS , GROUNDING SYSTEM, EMERGENCY LIGHT, EXIT SINGS, FIRE ALARM SYSTEM ,RESCUE ASSISTANCE SYSTEM. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
Track this owner
We'll flag their next deal, permit, or filing — usually before the neighbors know.
Entities are grouped by a normalized name from the public record; a separate legal entity per building is common, so some portfolios span several related names. Sources: Phila. Dept. of Records (deeds), L&I (permits & violations), Dept. of Revenue (tax delinquencies), reflecting the record as of our last weekly ingest. Verify independently before relying on it.
Last generated July 15, 2026.